| Agency: | Hidalgo County |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 11, 2025 |
| Due Date: | May 28, 2025 |
| Solicitation No: | HCDD1-25-015-02-18-JS |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID: HCDD1-25-015-02-18-JS
Title: PD Lateral Drain Extension 5 - 2023 Bond Referendum Project No. 15
Addenda: 0
Release Date: 5/10/2025
Due Date: 5/28/2025
RELEASE DATE: 05/10/2025
RESPONSE SUBMISSION DATE/TIME: 05/28/2025,9:30 a.m.
RE: HIDALGO COUNTY DRAINAGE DISTRICT NO.1 - REQUEST FOR BIDS
RFB NO.:HCDD1-25-015-02-18-JS –PD Lateral Drain Extension 5 - 2023 Bond Referendum Project No. 15
To Whom It May Concern:
Enclosed please find the procurement packet for your review and consideration. Hidalgo County Drainage District No. 1 welcomes and appreciates your participation in the procurement process. If any further assistance is required, please do not hesitate to call Hidalgo County Drainage District No. 1 Office at (956) 292-7080.
Sincerely,
Hidalgo County Drainage District No.1
Enriqueta Zambrano , Procurement Manager
PD Lateral Drain Extension 5 Project is located on the south side of W Mile 6 Rd, extending from Texan Rd through Iowa Rd, and connecting to the existing PD Lateral Drain, within station limits Sta. 0+00 to Sta. 38+00.
The project includes selective clearing and grubbing of the existing borrow ditch and the removal of an above-ground irrigation canal, which will be replaced with an underground irrigation line. This includes all required fittings, stand pipe, and Fresno valves as shown in the plans.
The scope also includes the excavation and fill of the existing borrow ditch, along with the installation of culverts and inlets. The outfall connection to the PD Lateral will be made by open-cutting into the existing above-ground concrete irrigation canal owned by Irrigation District #16. The canal will be restored with the addition of a liner.
All work will follow HCDD#1 standards and specifications.
Approximate Construction Days: 180
Engineers Estimate: $1,788,390.00
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Information Type BTU - Request for Bid - Electronic Status Issued Number
City of College Station
Bid Due: 7/29/2026
PROJECT DEADLINE TIME/DATE PRE-BID/ PROPOSAL DATE/TIME PLACE PLAN COST LINKS BUYER 26-37 Old
Montgomery County
Bid Due: 7/29/2026
Bid Information Type Request for Qualifications Status Issued Number 118LR-26F (Construction Manager Advisor
City of Irving
Bid Due: 8/07/2026
Bid Number: 2026-40-10-05 Bid Title: 30-Inch Transmission Main Phase 2 Lone Star Road
City of Mansfield
Bid Due: 8/13/2026