PCT Operational Pavement Repair 2025
| Agency: | Port of Tacoma |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 25, 2025 |
| Due Date: | Mar 26, 2025 |
| Solicitation No: | PA000000038 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
PCT Operational Pavement Repair 2025
Contract Number:
PA000000038
Estimated Cost Range:
$1,315,000, plus Washington State Sales Tax (WSST)
Procurement Summary:
Milling and replacement of failed asphalt sections throughout the container yard. Milling will be completed by mechanical mills to a depth of 4-1/2" with replacement pavement placed in two lifts and finished to match adjacent paved areas.
A second potential component of the work includes the placement of concrete collars around utility basin lids. This effort will include sawcutting and removal of the existing asphalt pavement, placement of rebar and concrete in accordance with the specifications. The majority of terminal basin lids have collars.
This is an On-Call contract. The work will be assigned by Task Orders; each Task Order will address the scope of work and time of completion and shall be performed in accordance with the Contract Documents and Task Order provisions.
Task Order work is generally controlled by terminal schedule. Historically a single task order consisted of a 60-hr work window starting on a Friday afternoon and ending the following Sunday night. The last two paving contracts included work during standard business days and hours with advanced planning and coordination in a three-to-five-day window. Paving operations are expected to progress continuously during a terminal provided work window. Successful task orders generally require a contractor to mill and then place at least 1,000 tons of Hot Mix Asphalt in a 24-hour period.
The Port does not guarantee a certain amount of work.
Notes:
No pre-bid or site visit is scheduled for this project.
Bids Due:
Questions Due:
Contract Number:
PA000000038
Estimated Cost Range:
$1,315,000, plus Washington State Sales Tax (WSST)
Procurement Summary:
Milling and replacement of failed asphalt sections throughout the container yard. Milling will be completed by mechanical mills to a depth of 4-1/2" with replacement pavement placed in two lifts and finished to match adjacent paved areas.
A second potential component of the work includes the placement of concrete collars around utility basin lids. This effort will include sawcutting and removal of the existing asphalt pavement, placement of rebar and concrete in accordance with the specifications. The majority of terminal basin lids have collars.
This is an On-Call contract. The work will be assigned by Task Orders; each Task Order will address the scope of work and time of completion and shall be performed in accordance with the Contract Documents and Task Order provisions.
Task Order work is generally controlled by terminal schedule. Historically a single task order consisted of a 60-hr work window starting on a Friday afternoon and ending the following Sunday night. The last two paving contracts included work during standard business days and hours with advanced planning and coordination in a three-to-five-day window. Paving operations are expected to progress continuously during a terminal provided work window. Successful task orders generally require a contractor to mill and then place at least 1,000 tons of Hot Mix Asphalt in a 24-hour period.
The Port does not guarantee a certain amount of work.
Notes:
No pre-bid or site visit is scheduled for this project.
Bids Due:
Wed, 03/26/2025 - 10:00AM
Questions Due:
Wed, 03/19/2025 - 10:00AM
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow Bldg. 514 Subfloor Removal & Epoxy Coating Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 9/21/2026
CSO Basin 34 (I-90) Stormwater Mitigation/Separation Facility - 2018052 Details Plans Specs StatusAccepting
City of Spokane
Due by 9/29/2026
Project: State Parks Project - Boat Launch Pile Replacement at Alta Lake State
Sammamish Plateau Water
Due by 9/29/2026
CSO Basin 34 (I-90) Stormwater Mitigation/Separation Facility - 2018052 Details Plans Specs StatusAccepting
City of Spokane
Due by 9/29/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.