Pavement Repair
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Tennessee |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 14, 2026 |
| Due Date: | May 15, 2026 |
| Solicitation No: | 12639526Q0110 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: May 14, 2026 07:28 am CDT
- Original Published Date: Apr 17, 2026 09:53 am CDT
- Updated Date Offers Due: May 15, 2026 12:00 pm CDT
- Original Date Offers Due: May 15, 2026 12:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: May 30, 2026
- Original Inactive Date: May 30, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Memphis , TN 38133USA
The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation.
Solicitation documents are posted below.
Amendment 1 is posted below.
Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing.
RFIs:
- Can you provide the dimensions of the sink hole that was covered and how you would like to fill it? See photos below for dimensions. Clear the hole, dig out the debris, fill with appropriate material (ie, 3/4 “ gravel), asphalt with back lot.
- With this being in 3 phases, will the project require 3 mobilizations? Depending on the necessary schedule, yes it may.
RFI:
Is the intent of this project to preserve as much of the subgrade as possible? Or is the intent to replace the entire subgrade?
The intent is to preserve where it can be preserved and replace where necessary to provide a parking area that does not retain water, drains properly, and is appropriately sloped. While at the same time having a finished parking lot that will not deteriorate prematurely due to subgrade preservation. Preserve it to the extent it makes sense to do so. There is no specific requirement to replace it all.
Additionally, fog seal is not required.
- 250 MARQUETTE AVENUE SUITE 410
- MINNEAPOLIS , MN 55401
- USA
- Jim Roloff
- james.g.roloff@usda.gov
- Phone Number 6125907603
- May 14, 2026 07:28 am CDTCombined Synopsis/Solicitation (Updated)
- May 04, 2026 02:08 pm CDT Combined Synopsis/Solicitation (Updated)
- Apr 22, 2026 10:37 am CDT Combined Synopsis/Solicitation (Updated)
- Apr 21, 2026 12:15 pm CDT Combined Synopsis/Solicitation (Updated)
- Apr 17, 2026 09:53 am CDT Combined Synopsis/Solicitation (Original)
Related Document
| Apr 17, 2026 | [Combined Synopsis/Solicitation (Original)] Pavement Repair |
| Apr 21, 2026 | [Combined Synopsis/Solicitation (Updated)] Pavement Repair |
| Apr 22, 2026 | [Combined Synopsis/Solicitation (Updated)] Pavement Repair |
| May 4, 2026 | [Combined Synopsis/Solicitation (Updated)] Pavement Repair |
| May 15, 2026 | [Combined Synopsis/Solicitation (Updated)] Pavement Repair |
| May 19, 2026 | [Combined Synopsis/Solicitation (Updated)] Pavement Repair |
See Also
Project Title Release Date Pre-Bid Meeting Information Bid Opening Date Results Questions Deadline
City of Germantown
Due by 11/09/2026
Description Opening Date/Time Closing Date/Time Freezeland Circle Bridge Replacement November 04, 2026 :
County of Carteret
Due by 11/24/2026
Event ID and Documents: Event 32701-14044 Terms and Conditions Specifications Pre-Bid Memo Attachment
State Government of Tennessee
Due by 12/04/2026
Description Opening Date/Time Closing Date/Time Freezeland Circle Bridge Replacement November 04, 2026 :
County of Carteret
Due by 11/24/2026