Pavement Rehabilitation of Marshall Phelps Road
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 2, 2026 |
| Due Date: | Apr 30, 2026 |
| Solicitation No: | L164-0008 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Pavement Rehabilitation of Marshall Phelps Road
The Pavement Rehabilitation of Marshall Phelps Road project will consist of milling and overlaying the top 2 inches of pavement along with the replacement of bituminous concrete lip curbing, catch basin tops, bituminous concrete driveways, metal beam guiderail, and other utility manhole tops. The improvements will also include re-striping the roadway to accommodate 11-foot-wide travel lanes, 4-foot-wide striped buffers, and 5-foot-wide bike lanes on both sides of the roadway.
Contact Information
Suzanne Choate – Windsor Town Engineer choate@townofwindsorct.com 860-285-1804
See Also
Prequalification: E Building Heat Pipe Replacement UConn Health (UCH) will be replacing existing
State Government of Connecticut
Due by 11/17/2026
Invitation to Bid for Construction Services Rowland Government Center - Energy Audit Implementation
State Government of Connecticut
Due by 12/15/2026
Project ID: Title: RFP027-35 Evansville East Well Rehabilitation Addenda: 0 Release Date: 10/30/2026
City of Meriden
Due by 11/20/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Due by 11/12/2026