| Agency: | City of Kalamazoo |
|---|---|
| State: | Michigan |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 14, 2026 |
| Due Date: | May 5, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Closing date
May 05, 2026, 03:30 PM
90900-028.0-bid document (PDF, 2MB)
90900-028.0-Attachment A Windwall Assembly (PDF, 715KB)
90900-028.0-Attachment B Standard Parachute Instructions (PDF, 314KB)
SCOPE OF WORK
The Central County Transportation Authority has purchased 3 prefabricated Bus shelters, 3 windscreens and 1 bike storage shelter with bike racks. The Contractor shall install the bus shelters, windscreens and bike shelter AT ROOD HALL WMU CAMPUS in accordance with all project documents. These include, but are not limited to, the following:
These Specifications
• Attachment A - Windwall Assembly
• Attachment B - Standard Parachute Instructions
TIMELINE
The project must be completed by: 30 days after award . If you cannot meet this deadline, please fill out the “Statement of No Bid” form included in this packet, stating this as the reason.
| TOOLLIST: (cid:120) hammerdrillwith 34"(cid:1486)bitfor 5(cid:5)(cid:3)(cid:145)(cid:3)(cid:87)(cid:75)(cid:85)(cid:72)(cid:68)(cid:71)(cid:72)(cid:71)(cid:3)(cid:85)(cid:82)(cid:71)(cid:11)(cid:86)(cid:12) 8mmPCSSPANEL 8 (cid:120) drilldriverwith11( 316")drillbit (cid:120) driverforphillipstekscrews EG-8EDGESASH RIVET (cid:120) hexsocketsetwithextension(for 1 ",5 "and 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:69)(cid:82)(cid:79)(cid:87)(cid:86)(cid:12) 2 8 4 (cid:120) hexallenwrenchset PURLINTUBE (cid:120) heavy-dutypoprivettool(for 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:86)(cid:87)(cid:68)(cid:76)(cid:81)(cid:79)(cid:72)(cid:86)(cid:86)(cid:3)(cid:86)(cid:87)(cid:72)(cid:72)(cid:79)(cid:3)(cid:83)(cid:82)(cid:83)(cid:3)(cid:85)(cid:76)(cid:89)(cid:72)(cid:87)(cid:86)(cid:12) 16 (cid:120) gasketrollingtool 3. Slideoneof(2)trimmed8mmpanelsintoeaveEG-8sashpieces,tucking (cid:120) standardtoolsetincluding,butnotlimitedto:hammer,tapemeasure,level, intotheendsash.Securepanellegusing(1)panelclipand(2)panhead pencil,utilityknife,chalkline,etc. tekscrewsateachstructuralmember,exceptfortheouter(eave)members. 3.1. Alternatemethods:attachingoneeavepieceofEG-8,ornone,untilall FRAMEASSEMBLY: panelsareclippedinplace,thenslidingeavesashoverallpanelends 1. Assemblemainstanchions:boltcurvedraftertubeto"columns"with 3 4 " andpullingdown.Ifpanelhasahardtimefittingintothesash(it's serratedhexboltsthroughtopaccessholesinrafter.Capaccessholeswith supposedtobetight!),youcanuseahand-seamerorformicarolleror plasticplug(s)providedwhencomplete. similartooltogently"crush"thelast 1"orsoofthepanel. 2. Positionassembledmainstanchionsinapproximatefinallocations.Drawing 4 CLIP andboltholeplacementsinpurlinbeamswilldeterminespacing. 3. Withstanchionssquaredtoeachotherandatthecorrectspacing,install oneanchorbolt(or2)ineachmainstanchion,notfullytightened,forsafety whileremainingpurlinsarebeingattached. 4. Attachpurlinbeamstothetopofeachrafterwith 1 2 "serrated-flangehex 4. Slidenexta"full"8mmpanelintotheeaveEG-8sashandpushagainstclips bolts,throughtopaccessholes.Donottightencompletelyuntilentireframe justinstalled.Securefreelegwithanothersetofclips,asinstep3.Panel isinfinallocation,squareandplumb.Purlinspliceplates (wherenecessary) clipsshouldmaintaina23 3"o.c.spacing. aresecured 1 "-13x 3"buttonheadboltsandlockwashers. 4 2 4 5. Oncelastfactorytrimmedpanelisinplace,slideremainingEG-8sashover 5. Withframesquareandplumb,installandtightenremaininganchors.Shim trimmedpanel,securingwith 316"closed-endpoprivets,sameasstarting asnecessary.Tightenallpurlinbolts. end.Ifanyadditionaltrimmingneedstobedone,useautilityknifeandcut (cid:20)(cid:18)(cid:21)(cid:5)(cid:145)(cid:3)(cid:54)(cid:18)(cid:54)(cid:3)(cid:37)(cid:50)(cid:47)(cid:55)(cid:3)(cid:55)(cid:43)(cid:53)(cid:50)(cid:56)(cid:42)(cid:43)(cid:3)(cid:3)(cid:36)(cid:38)(cid:38)(cid:40)(cid:54)(cid:54)(cid:3)(cid:43)(cid:50)(cid:47)(cid:40) throughonethicknessatatime. INTOPOFPURLIN,INTOTHREADED HOLE,TYP. 6. Installthe"drop-in"gasketalongthetopperimeteroftheEG-8sash,as shown.Note:dependingontemperature,etc.,itmaybeverydifficultto ACCESSHOLE installthedrop-ingasket.Ifunabletodoso,applyasmallbeadofclear PURLINTUBE sealantalongthatjointinplaceofgasket. RAFTERTUBE 7. Snapbattensontopanels.Snapendcapintobattens.Caulkanyopen ROOFGLAZING: seamsincapsandaroundbattenends. SEALANT 1. Note:Itisintendedthattheroofpanelsstartinthemiddle,notatanend (thiswillensuresymmetry).Refertoyourexactmodeltodeterminewhether BATTEN BATTENCAP apaneliscenteredontheshelterorthejointbetweentwopanelsis centeredontheshelter.Stepsbelowwillstartatoneend: EPDMDROP-INGASKET 2. Attach1endandbotheavepiecesoftheEG-8aluminumedgesashtothe steelframeasshown,using 316"closed-endpoprivets,oneateachpurlin ontheendandapprox.12"oncenteralongtheeaves(2ateachmiterjoint). EndEG-8piecesarefieldcurved. | ||||||||
|---|---|---|---|---|---|---|---|---|
| Duo-GardIndustries,Inc. Tel(734)207-9700Fax(734)207-7995 www.duo-gard.com | THISDRAWINGISPROPRIETARYANDFORTHESOLEUSEOFOUR CUSTOMERANDMAYNOTBECOPIEDORREPRODUCEDWITHOUT PRIORWRITTENCONSENTFROMDUO-GARDINDUSTRIES,INC. LEADTIMEBEGINSUPONRECEIPTOFSIGNEDSHOPDRAWINGS APPROVALSIGNATUREDATE X_______________________________________ _______________ | PROJECTNAME CUSTOMERSAMPLE | ||||||
| DESCRIPTION 9'AND12'PARACHUTEMODELBICYCLESHELTER-INSTALLATIONINSTRUCTIONS | ||||||||
| PRJTENG BDI | PRJTMGR --- | DRW`GDATE 6-20-11 | REV1 R 2-21-12 3 | EV2 SCALE PAGE -8-19 NTS 1 | OF 1 | DRWNG PARAINS |
TOOLLIST:
(cid:120) hammerdrillwith 34"(cid:1486)bitfor 5(cid:5)(cid:3)(cid:145)(cid:3)(cid:87)(cid:75)(cid:85)(cid:72)(cid:68)(cid:71)(cid:72)(cid:71)(cid:3)(cid:85)(cid:82)(cid:71)(cid:11)(cid:86)(cid:12) 8mmPCSSPANEL
8
(cid:120) drilldriverwith11( 316")drillbit
(cid:120) driverforphillipstekscrews EG-8EDGESASH
RIVET
(cid:120) hexsocketsetwithextension(for 1 ",5 "and 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:69)(cid:82)(cid:79)(cid:87)(cid:86)(cid:12)
2 8 4
(cid:120) hexallenwrenchset
PURLINTUBE
(cid:120) heavy-dutypoprivettool(for 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:86)(cid:87)(cid:68)(cid:76)(cid:81)(cid:79)(cid:72)(cid:86)(cid:86)(cid:3)(cid:86)(cid:87)(cid:72)(cid:72)(cid:79)(cid:3)(cid:83)(cid:82)(cid:83)(cid:3)(cid:85)(cid:76)(cid:89)(cid:72)(cid:87)(cid:86)(cid:12)
16
(cid:120) gasketrollingtool
3. Slideoneof(2)trimmed8mmpanelsintoeaveEG-8sashpieces,tucking
(cid:120) standardtoolsetincluding,butnotlimitedto:hammer,tapemeasure,level,
intotheendsash.Securepanellegusing(1)panelclipand(2)panhead
pencil,utilityknife,chalkline,etc.
tekscrewsateachstructuralmember,exceptfortheouter(eave)members.
3.1. Alternatemethods:attachingoneeavepieceofEG-8,ornone,untilall
FRAMEASSEMBLY:
panelsareclippedinplace,thenslidingeavesashoverallpanelends
1. Assemblemainstanchions:boltcurvedraftertubeto"columns"with 3 4 " andpullingdown.Ifpanelhasahardtimefittingintothesash(it's
serratedhexboltsthroughtopaccessholesinrafter.Capaccessholeswith supposedtobetight!),youcanuseahand-seamerorformicarolleror
plasticplug(s)providedwhencomplete. similartooltogently"crush"thelast 1"orsoofthepanel.
2. Positionassembledmainstanchionsinapproximatefinallocations.Drawing 4
CLIP
andboltholeplacementsinpurlinbeamswilldeterminespacing.
3. Withstanchionssquaredtoeachotherandatthecorrectspacing,install
oneanchorbolt(or2)ineachmainstanchion,notfullytightened,forsafety
whileremainingpurlinsarebeingattached.
4. Attachpurlinbeamstothetopofeachrafterwith 1 2 "serrated-flangehex 4. Slidenexta"full"8mmpanelintotheeaveEG-8sashandpushagainstclips
bolts,throughtopaccessholes.Donottightencompletelyuntilentireframe
justinstalled.Securefreelegwithanothersetofclips,asinstep3.Panel
isinfinallocation,squareandplumb.Purlinspliceplates (wherenecessary)
clipsshouldmaintaina23 3"o.c.spacing.
aresecured 1 "-13x 3"buttonheadboltsandlockwashers. 4
2 4 5. Oncelastfactorytrimmedpanelisinplace,slideremainingEG-8sashover
5. Withframesquareandplumb,installandtightenremaininganchors.Shim
trimmedpanel,securingwith 316"closed-endpoprivets,sameasstarting
asnecessary.Tightenallpurlinbolts.
end.Ifanyadditionaltrimmingneedstobedone,useautilityknifeandcut
(cid:20)(cid:18)(cid:21)(cid:5)(cid:145)(cid:3)(cid:54)(cid:18)(cid:54)(cid:3)(cid:37)(cid:50)(cid:47)(cid:55)(cid:3)(cid:55)(cid:43)(cid:53)(cid:50)(cid:56)(cid:42)(cid:43)(cid:3)(cid:3)(cid:36)(cid:38)(cid:38)(cid:40)(cid:54)(cid:54)(cid:3)(cid:43)(cid:50)(cid:47)(cid:40) throughonethicknessatatime.
INTOPOFPURLIN,INTOTHREADED
HOLE,TYP. 6. Installthe"drop-in"gasketalongthetopperimeteroftheEG-8sash,as
shown.Note:dependingontemperature,etc.,itmaybeverydifficultto
ACCESSHOLE installthedrop-ingasket.Ifunabletodoso,applyasmallbeadofclear
PURLINTUBE sealantalongthatjointinplaceofgasket.
RAFTERTUBE 7. Snapbattensontopanels.Snapendcapintobattens.Caulkanyopen
ROOFGLAZING: seamsincapsandaroundbattenends. SEALANT
1. Note:Itisintendedthattheroofpanelsstartinthemiddle,notatanend
(thiswillensuresymmetry).Refertoyourexactmodeltodeterminewhether BATTEN
BATTENCAP
apaneliscenteredontheshelterorthejointbetweentwopanelsis
centeredontheshelter.Stepsbelowwillstartatoneend:
EPDMDROP-INGASKET
2. Attach1endandbotheavepiecesoftheEG-8aluminumedgesashtothe
steelframeasshown,using 316"closed-endpoprivets,oneateachpurlin
ontheendandapprox.12"oncenteralongtheeaves(2ateachmiterjoint).
EndEG-8piecesarefieldcurved.
THISDRAWINGISPROPRIETARYANDFORTHESOLEUSEOFOUR PROJECTNAME
CUSTOMERANDMAYNOTBECOPIEDORREPRODUCEDWITHOUT CUSTOMERSAMPLE
PRIORWRITTENCONSENTFROMDUO-GARDINDUSTRIES,INC.
LEADTIMEBEGINSUPONRECEIPTOFSIGNEDSHOPDRAWINGS DESCRIPTION 3
APPROVALSIGNATUREDATE 9'AND12'PARACHUTEMODELBICYCLESHELTER-INSTALLATIONINSTRUCTIONS
Duo-GardIndustries,Inc. PRJTENG PRJTMGR DRW`GDATE REV1 REV2 SCALE PAGE OF DRWNG
Tel(734)207-9700Fax(734)207-7995
www.duo-gard.com X_______________________________________ _______________ BDI --- 6-20-11 2-21-12 3-8-19 NTS 1 1 PARAINS
install:makesure23 "o.c.!
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number: 200 Bid Title: DELIVERY OF MINERAL WELL BRINE TO JACKSON COUNTY
Jackson County
Bid Due: 8/03/2026
Pathways Pedestrian Bridges Staining RFP (Revised on 7/17 @ 11:46 AM)
Grosse Ile township
Bid Due: 8/12/2026
B-22-26 | Water Storage Inspections Thu 07/16/2026 Fri 08/21/2026
City of Sault Ste. Marie
Bid Due: 8/21/2026
Description: 751/26332.MDL; DeTour State Harbor - Fuel Tanks Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/30/2026