Parrott Creek Culvert Replacement - Project No. 25PW15
Specification Documents
Drawings
Bid Opening Date: Tuesday, March 3, 2026
Bid Opening Time: 2:00 p.m.
Bid Opening Location: Roseburg City Hall, 3rd Floor Conference Room and Electronically via Zoom - Instructions to join the Zoom meeting will be posted on March 2, 2026
Competitive Range (Base and Additive Alternate): $1,550,000 - $1,850,000
Addendum No. 1 - Posted February 19, 2026
Geotechnical Design Report Parrot Creek Culvert Replacements Roseburg Oregon - Posted February 19, 2026
Addendum No. 2 - Posted February 26, 2026
RUSA Standard Details - Posted February 26, 2026

Attachment Preview

PARROTT CREEK CULVERT REPLACEMENT ADDENDUM
Project: Parrott Creek Culvert
Prepared by: Erik Ranger
Replacement
i.e. Engineering, Inc
809 SE Pine St.
Owner: City of Roseburg
Roseburg, OR 97470
Response date: 02.24.2026
___________________________________________________________________________
1.0 NOTICE TO ALL BIDDERS AND PLAN\HOLDERS
The Contract Documents for the above-referenced Project are modified as set forth in this
Addendum. The original Contract Documents and any previously issued addenda remain in full
force and effect, except as modified by this Addendum, which is hereby made part of the
Contract Documents. Bidder shall take this Addendum into consideration when preparing and
submitting a bid, and shall acknowledge receipt of this Addendum in the space provided on the
Bid Form
2.0 BID SUBMITTAL DEADLINE
The bid submittal deadline remains the same and is not changed by this Addendum
3.0 PROJECT BID BOOKLET
The following changes are made to the Project Bid Booklet:
1. The following changes are made to the Base Project Bid Items:
a. Quantity changes:
Item Number
Item
18
12 INCH STORM SEWER PIPE
20
GRANULAR STRUCTURAL BACKFILL
26
AGGRETATE BASE
27
HMAC, 3-INCH THICK
b. Added items:
Item Number
Item
37
SANITARY SEWER BYPASS, EDDY STREET
38
SANITARY SEWER BYPASS, KANE STREET
39
SANITARY SEWER BYPASS, GILES STREET
40
8” SANITARY SEWER
41
10” SANITARY SEWER
42
8” DUCTILE IRON WATERLINE
43
CONNECT TO EXISTING WATERLINE
44
CONNECT TO EXISTING SANITARY SEWER LINE
45
CONCRETE SANITARY SEWER MANHOLE, 48”
46
CONC SANI SEWER MANHOLE, OUTSIDE DROP
47
RECONNECT EXTG. SANITARY SEWER LATERAL
48
8 INCH STORM SEWER PIPE
49
REMOVE & REBUILD EXTG. FENCE
Quantity
Original New
500
370
2,000 2,300
360
420
100
130
Unit
LS
LS
LS
FOOT
FOOT
FOOT
EACH
EACH
EACH
EACH
EACH
FOOT
FOOT
Quantity
1
1
1
290
115
100
2
8
2
1
3
130
185
2. The following changes are made to the Alternate A Project Bid Items:
a. Quantity changes:
Item Number
16
26
27
28
b. Added items:
Item
12 INCH STORM SEWER PIPE
GRANULAR STRUCTURAL BACKFILL
AGGRETATE BASE
HMAC, 3-INCH THICK
Quantity
Original New
35
0
1,250 950
95
160
25
40
Item Number
16
31
32
33
34
35
36
Item
8 INCH STORM SEWER PIPE
SANITARY SEWER BYPASS, ICHABOD STREET
8” SANITARY SEWER
8” DUCTILE IRON WATERLINE
CONNECT TO EXISTING WATERLINE
CONNECT TO EXISTING SANITARY SEWER LINE
RECONNECT EXTG. SANITARY SEWER LATERAL
Unit
FOOT
LS
FOOT
FOOT
EACH
EACH
EACH
Quantity
60
1
100
100
2
2
2
Make a copy of and use the new attached Bid Schedule. A Bid not including this new Bid
Schedule will be rejected as non-responsive.
4.0 PROJECT SPECIAL PROVISIONS
SECTION 00190 – MEASUREMENT OF PAY QUANTITIES
00190.15 Payment Summary – Add the following payment summaries to the end of this
section:
29. SANITARY SEWER BYPASS - This Work consists of developing a plan, and
furnishing, installing, operating, and maintaining, sewer bypass when working on
existing sanitary sewer sections. Payment will be in full for furnishing the required
plan, all required materials, installation, maintaining and removing the bypass
materials when complete. Payment will be lump sum per each culvert crossing.
30. SANITARY SEWER PIPE - This Work consists of constructing or reconstructing,
sanitary sewer pipes in the kinds, sizes, and lengths and at the locations shown
or as directed to the lines and grades established. The Work includes furnishing
and constructing Joints and connections to other drainage Structures or systems,
as necessary, for complete installation. Payment will be payment in full for
furnishing and placing all Materials, and for furnishing all Equipment, labor, and
Incidentals necessary to complete the Work as specified. To include trench
excavation, bedding, pipe zone Material, and trench backfill for pipes 72 inches
and less in diameter, pipe plugs, stoppers, and other required fittings, tracer wire,
and air, Joint, and deflection testing. Payment will be by the measured, installed
foot.
31. DUCTILE WATERLINE - This Work consists of constructing potable water pipe
and fittings 16 inches and smaller in diameter. Payment will be payment in full for
furnishing and placing all Materials, and for furnishing all Equipment, labor, and
Incidentals necessary to complete the Work as specified to include trench
excavation, bedding, pipe zone Material, and trench backfill, pipe plugs, stoppers,
Parrot Creek Culvert Replacement
Addendum
i.e. Engineering, Inc.
i.e. Job # 0149-232
Page 2 of 19
02.24.2026
and other required fittings, tracer wire, and markers balls, concrete thrust blocks,
marking tape, polyethylene encasement, disinfection, flushing, and testing.
Payment will be by the installed, measured foot.
32. CONNECT TO EXISTING WATERLINE - This Work consists of connecting new
waterlines to existing pipes. Payment will be payment in full for furnishing and
placing all Materials, and for furnishing all Equipment, labor, and Incidentals
necessary to complete the Work as specified to include trench excavation,
bedding, pipe zone Material, and trench backfill, pipe plugs, stoppers, and other
required fittings, tracer wire, and markers balls, concrete thrust blocks, marking
tape, polyethylene encasement, disinfection, flushing, and testing. Payment will
be by each.
33. CONNECT TO EXISTING SANITARY SEWER - This Work consists of
connecting new sewer lines or manholes to existing pipes. Payment will be
payment in full for furnishing and placing all Materials, and for furnishing all
Equipment, labor, and Incidentals necessary to complete the Work as specified
to include trench excavation, bedding, pipe zone Material, and trench backfill,
pipe plugs, stoppers, and other required fittings, and tracer wire. Payment will be
by each.
34. CONCRETE SANITARY SEWER MANHOLE, 48” - This Work consists of
purchasing and installation of standard, 48-inch diameter manhole. Payment will
be payment in full for furnishing and placing all Materials, and for furnishing all
Equipment, labor, and Incidentals necessary to complete the Work as specified
to include excavation, bedding, backfill, pipe plugs, stoppers, and other required
fittings, and tracer wire, grouting, cleaning, and predelivery and post construction
acceptance testing. Payment will be by each.
35. CONCRETE SANITARY SEWER MANHOLE, OUTSIDE DROP - This Work
consists of purchasing and installation of an outside drop manhole. Payment will
be payment in full for furnishing and placing all Materials, and for furnishing all
Equipment, labor, and Incidentals necessary to complete the Work as specified
to include excavation, bedding, backfill, pipe plugs, stoppers, and other required
fittings, and tracer wire, grouting, cleaning, and predelivery and post construction
acceptance testing. No additional payment will be made for exterior drop piping
or concrete. Payment will be by each.
36. REMOVE AND REBUILD EXISTING FENCE – This work consists of removing
and rebuilding existing Fences as shown or directed. Construct Fences to
approximately the same condition as the original Fence. Salvage the materials
in existing Fences to be removed and rebuilt and incorporate in the rebuilt
Fences. Replace fence materials damaged beyond reuse at no additional cost
to the Agency. Firmly reset posts to match the existing alignment. Post spacing
and the number of wires to be strung and stapled to the posts shall be the same
as the original Fence. Furnish and use new staples or clips to fasten the wires
to the posts.
37. RECONNECT EXTG. SANITARY SEWER LATERALS - This Work consists of
constructing or reconstructing, sanitary sewer laterals in the kinds, sizes, and
lengths and at the locations shown or as directed to the lines and grades
established. The Work includes furnishing and constructing Joints and
connections to the new mainline and existing laterals, as necessary, for complete
installation. Payment will be payment in full for furnishing and placing all
Materials, and for furnishing all Equipment, labor, and Incidentals necessary to
complete the Work as specified. To include trench excavation, bedding, pipe
zone Material, and trench backfill, pipe plugs, stoppers, and other required
Parrot Creek Culvert Replacement
Addendum
i.e. Engineering, Inc.
i.e. Job # 0149-232
Page 3 of 19
02.24.2026
fittings, tracer wire, and air, Joint, and deflection testing. Payment will be by each,
with no additional payment for piping.
Add or append the existing with the following special provisions.
SECTION 00445 - SANITARY, STORM, CULVERT, SIPHON, AND IRRIGATION PIPE
Comply with Section 00445 of the Standard Specifications modified as follows:
00445.10 General – Add the following paragraph after the third paragraph; Wherever sewer
mains cross water lines with less than 18 inches of vertical clearance, the sewer main shall be
C900 PVC, DR18 conforming to 02470.40 for the entire distance between manholes. Wherever
sewer laterals cross water lines with less than 18 inches of vertical clearance, the sewer lateral
shall be C900 PVC or ductile iron pipe for a minimum distance of 9 feet on each side of the
waterline, centering the pipe section on the waterline.
00445.11 Materials – Add the following bullets to the end of this subsection:
(f) Pipe Materials - See profile on construction plans for pipe material designation Unless
specified otherwise, all sanitary sewer pipe used on this project shall be 3034, SDR35 Polyvinyl
Chloride (PVC) Pipe conform to 02410.70. All service Tee connections shall be gasketed PVC
factory fabricated sections meeting the same requirements as the pipe. Ductile Iron Pipe shall
be Class 50 when called out on plans. Use centrifugally cast ductile iron pipe meeting the
requirements of AWWA C151. Ductile iron pipe shall have a Protecto 401 Ceramic Epoxy lining
or approved equal. Joints shall conform to AWWA C111/A21.11-00 for push on rubber gasket
joints and shall be Tyton® or approved equal. Joint gaskets including gasket lubricant shall be
furnished with the fittings. Sanitary sewer pipe used as carrier pipe shall be C900 PVC, DR18
conforming to 2470.40.
00445.11(e) Tracer Wire – Tracer wire shall be 12-gauge solid copper insulated high molecular
weight polyethylene (HMW-PE) tracer wire. The HMW-PE insulated cover shall be green and a
minimum 45 mil thick. The wire shall be UL rated for 140°F.
Construction
00445.40(b) Line and Grade -
Add the following bullet to the end of this section: .
Standing water in excess of 3/8 inch
00445.43(c) PVC Pipe – Add the following at the end of this section:
Field verify size of existing sanitary service lines located near the property line prior to placing
mainline pipe and required Tee section. Match the Tee to the appropriate service size along
with the service pipe size between the mainline and property line. Size shall be 4-inch minimum.
If 6-inch line is used into the dwelling, then use 6-inch from the main line. No additional
payments will be made for 6-inch services.
00445.70(b) Siphon, Irrigation and Sanitary Sewer Installations – Delete the last sentence
and substitute the following:
Parrot Creek Culvert Replacement
Addendum
i.e. Engineering, Inc.
i.e. Job # 0149-232
Page 4 of 19
02.24.2026
Contractor shall perform deflection and air testing on full pipe runs. The agency will perform a
video inspection.
00445.72(b) Hydrostatic Testing – Delete this subsection for Sanitary Sewer Pipe testing.
00445.72(c) Air Testing – Replace this subsection, except for the subsection number and title,
with the following: The pressure test gauge used in air testing shall have a minimum divisions of
0.1 psi and an accuracy of 0.0625 psi. The test procedure is as follows
(1) Add air slowly to the section of system being tested until the internal air pressure is
raised to 4 psi greater than the average back pressure due to groundwater. When
acceptable to the engineer, 5 psi may be used to account for groundwater.
(2) After the test pressure is reach, allow at least 2 minutes for the air temperature to
stabilize, adding only the amount of air required to maintain pressure.
(3) After the temperature stabilization, disconnect the air supply.
(4) Monitor the pressure gauge for the minimum time required. There will be no internal air
pressure drop allowed with 3034 PVC pipe. In no case shall length of test (T) be less
than the following chart.
Length
Time
Pipe Diameter Min Time for Min Time for longer length
(inches) (min:sec) (Feet)
(sec)
8
3:47
298
0.76L
00445.74 Video Inspection of Sanitary and Storm Sewers – Replace this subsection, except
for the subsection number and title, with the following:
Video inspection will be performed once by RUSA 30 days after the trench is completely
backfilled at no cost to the contractor. Prior video inspections or subsequent video inspections
will be performed by the agency at the contractor’s expense. The contractor will be charged for
subsequent testing required due to failing tests and will be deducted from contract payments per
00195.502(a-5).
00445.91 Payment – Add the following to the description for item (b):
In item (b) payment will be made on a length basis on the service laterals regardless of method
of installation and will include payment in full for furnishing and placing all materials, and for
furnishing all equipment labor, clean-outs, tee’s, wye’s, caps, covers and other fittings along
with incidentals necessary to complete the work as specified. No additional payments will be
made for 6” services.
SECTION 00470 - MANHOLES, CATCH BASINS, AND INLETS
Comply with Section 00470 of the Standard Specifications modified as follows:
00470.11 Precast Concrete Manholes and Bases – Add the following after the first paragraph:
Sanitary manhole cone sections shall have a concentric opening. All sanitary manholes shall be
48-inch nominal inside diameter unless specified otherwise. Connections to existing manholes
shall be cored or saw cut only.
Parrot Creek Culvert Replacement
Addendum
i.e. Engineering, Inc.
i.e. Job # 0149-232
Page 5 of 19
02.24.2026
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Description Oregon State University ("OSU" and/or "Owner") is seeking Offers ("Offers") from qualified

Oregon State University

Bid Due: 8/30/2030

Bid Solicitation # S-R34142-00016582 Bid Solicitation # S-R34142-00016582 Organization Name Tualatin Valley Fire

State Government of Oregon

Bid Due: 6/03/2026

Bid Solicitation # S-KN0040-00017044 Bid Solicitation # S-KN0040-00017044 Organization Name City of Pendleton

State Government of Oregon

Bid Due: 6/25/2026

Bid Solicitation # S-63400-00016792 Bid Solicitation # S-63400-00016792 Organization Name Oregon Parks and

State Government of Oregon

Bid Due: 6/03/2026