Project ID: 26-ITB-118
Title: Park West (PS-05) Pumping Station Rehabilitation
Addenda: 0
Release Date: 4/22/2026
Due Date: 5/27/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The Park West (PS-05) Pumping Station Rehabilitation project consists of the rehabilitation and construction of a wastewater pumping station, including demolition of existing components and installation of new structural, mechanical, and electrical systems.
Work includes installation of a precast wetwell, valve vault, submersible pumps, diesel backup pump, piping, valves, and a magnetic flow meter. The project also includes construction of an electrical building, installation of electrical service, transfer switch, lighting, and SCADA system components.
Additional work includes site improvements such as erosion and sediment control, earthwork, paving, fencing, and related appurtenances. The project requires coordination of multiple disciplines to provide a complete and operational pumping station.
The contractor will be required to maintain operation of the existing system during construction, including the use of bypass pumping as necessary.
Background
The Park West (PS-05) Pumping Station is an existing wastewater facility serving the surrounding area and requires rehabilitation to replace aging infrastructure and improve system reliability and performance. The project has been developed to upgrade structural, mechanical, and electrical components of the station to meet current operational needs.
Due to the nature of the facility, the pumping station must remain operational during construction. The work will require careful coordination, sequencing, and implementation of bypass pumping to maintain continuous wastewater service.
This project involves multiple disciplines, including civil, structural, mechanical, and electrical systems, and will require an experienced contractor capable of executing work in an active wastewater environment.
Timeline
South Building - Training Room
804 S. Laurel St.
Springfield, GA 31329
See Also
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-40900-RFQ-2027-000000238
State Government of Georgia
Due by 9/23/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-62557-NONST-2027-000000006
State Government of Georgia
Due by 10/01/2026
Type of Bid Project Department Bids Sent Bids Due By Due Time Pre
City of Peachtree City
Due by 12/31/2029
Project: S2161 Windsor Parkway Sidewalk Project Ref. #: 27-007 Type: ITB Status: Open
City of Sandy Springs
Due by 10/06/2026