Park at Bothell Landing Water Quality Facility

Agency: City of Bothell
State: Washington
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 541620 - Environmental Consulting Services
Posted Date: May 31, 2026
Due Date: Jun 16, 2026
Solicitation No: PW-0156
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: PW-0156
Bid Title: Park at Bothell Landing Water Quality Facility
Category: Request for Qualifications
Status: Open
Bid Recipient: Rob Holbrook
Description:

To be considered for this work, interested firms must submit a clearly identified response package in PDF format submitted electronically to the attention of Rob Holbrook, email:  For security reasons, you must enable JavaScript to view this E-mail address. no later than 2:30 pm (PST) on June 16, 2026.

Publication Date/Time:
5/26/2026 12:00 AM
Closing Date/Time:
6/16/2026 2:30 PM
Related Documents:

Attachment Preview

INFORMATION SHEET
REQUEST FOR STATEMENT OF QUALIFICATIONS
Park at Bothell Landing Water Quality Facility
Description of Project
The City of Bothell Public Works Department is requesting Statements of Qualifications
and Performance Data from firms qualified and interested in providing professional
services to design a water quality treatment facility that will add water quality
functionality to approximately 80 acres of previously untreated impervious surface area
within the Park at Bothell Landing (PABL) that discharges directly to the Upper
Sammamish River. Please submit your statement of qualifications by 2:30 p.m. Tuesday,
June 16.
This project will complete through final design of a water quality and pretreatment facility
within the Park at Bothell Landing (PABL). The project will need to route incoming flow
through pretreatment to settle out sediment and floatables from SR-522 runoff before
flowing into proprietary media filter vaults. The pollutants this facility could remove
include copper, TSS, Polycyclic Aromatic Hydrocarbons (PAH), heavy metals, oil and
petroleum, bacteria, and 6PPD-Q. Final placement, orientation, and type of treatment
facility will be coordinated with park improvements, utility modifications, and other
potential project design elements.
The City of Bothell Parks department is completing design of Park at Bothell Landing
Improvement project, with complete design anticipated in February 2027. See attached
sheet T1.00 for an updated site plan with improvements. The Park at Bothell Landing
Water Quality Facility project will require coordination with the Park at Bothell Landing
Improvement project in order to integrate vault design into the completed Park at Bothell
Landing Improvements design.
SOQPD - PABL Water Quality Facility Due June 16, 2026 Page 1 of 6

Name Total Acreage Impervious Acreage Offline Discharge CFS
PABL W1 68.46 51.32 4.036
PABL W2 39.34 26.53 2.0351
PABL W Total 107.8 77.86 6.0686

Description of Work
The selection of the Consultant will be such that the Consultant has the capability to
complete the entire design, obtain required environmental and permitting approvals, and
provide construction engineering support services. The Consultant, at the option of the
City, may be contracted to provide construction engineering services. Design work will
begin in 2026.
During the City's Storm and Surface Water Plan update (2024), a conceptual design for
the PABL water quality facility was created. This includes two vaults in parallel totaling
40'x 54'. The contributing area and offline discharge cfs are summarized below.
Name Total Acreage Impervious Acreage Offline Discharge CFS
PABL W1 68.46 51.32 4.036
PABL W2 39.34 26.53 2.0351
PABL W Total 107.8 77.86 6.0686
Additional maps of the catchment areas and facility location can be seen in the
attachments at the end of this document. The facility location is overlayed on an outdated
basemap, refer to the T1.00 Site Plan for current park improvements.
The Consultant shall be able to provide all services required to complete the final design
and produce construction ready documents for the project. This work includes:
* Project surveying
* SEPA and Wetland Delineation Review
* Cultural Resources and Inadvertent Discovery Plan Review
* Development of overall project schedule including timelines and potential staging
* Strategy of improvements and alternatives for new facility
* Private and public utility coordination
* Development of plans, cost estimate and specifications
* Development of required analyses, documentation, and permits
* Contaminated Soils and Groundwater
* Bothell Standards Appendix E - Contaminated Soil and Groundwater Protocol
* The site location falls within the City's downtown core that may potentially
contain contaminated or impacted soil, groundwater, or soil vapor.
* https://www.bothellwa.gov/DocumentCenter/View/12490/Bothell-
Standards-Appendix-E---Contaminated-Soil--Groundwater-Protocol?bidId=
* Deliverables as listed in the Department of Ecology's Water Quality Combined
Funding Program requirements for both design and construction (Link below)
* https://ecology.wa.gov/water-shorelines/water-quality/water-quality-
grants-and-loans/stormwater-funding-resources
SOQPD - PABL Water Quality Facility Due June 16, 2026 Page 2 of 6

The Consultant shall provide appropriate interdisciplinary resources to complete the
work. The following items are indicative of the type of resources that the Consultant will
be expected to have on hand.
Civil Engineering
* Geotechnical
* Hydrology/Hydraulics
* Ecology Approved Stormwater BMPs
* Utility Coordination
* Design Constraints Location, size, and depth of existing infrastructure
Environmental
* Permitting
* Archaeology/Cultural Preservation
* Water Quality and Pollution Standards
* Historic and Cultural Resources
* SEPA
* Biological Assessments
* Wetlands
* Cultural Resources Review and Inadvertent Discovery Plan
* Contaminated Soils and Groundwater
Bothell Standards Appendix E - Contaminated Soil and Groundwater
o
Protocol
Cost Estimating
Public Involvement
* Education and Outreach
* Informational Signage
Public and Private Utility Coordination
* Parks Design and Construction
* Utility impacts
Construction Engineering Support
* Ecology construction grant requirements.
* Ecology's Construction Quality Assurance Plan
Consultant Structure
The Consultant will need to have the resources that will enable it to complete tasks
quickly and be extremely responsive. The Consultant must be flexible and able to adjust
to changing priorities or direction. The Consultants shall have the capabilities to conduct
business using web-based meetings.
As such, while the City will award this work as one contract, the Consultant must be able
to structure its team to meet the needs of the project. The City is open to different
SOQPD - PABL Water Quality Facility Due June 16, 2026 Page 3 of 6

consultant team concepts including, but not limited to, a prime consultant with all
capabilities and resources in-house; a prime consultant with sub-consultants; and a team
of prime consultants with sub-consultants.
Due to the City's large capital project workload, the Consultant will need to be able to
accomplish this work independent of City staff support, other than oversight by the City's
project manager. The Consultant will be required to have the ability to organize and staff
public meetings.
City Responsibilities
The City of Bothell's project manager will lead the overall process and will be the nexus
through which all public involvement and agency coordination occurs.
Selection Process
The selection process will consist of short-listing using the submitted Statement of
Qualifications and Performance Data (SOQPD). This will be followed by an interview
with finalist candidates.
Contract negotiations will take place with the top-rated consultant. If negotiations are
unsuccessful, the City reserves the right to terminate negotiations and open discussion
with the next-highest rated consultant. This process will continue until successful
contracts are negotiated or the City terminates the process.
Major Criteria for Selection:
1. Capabilities of project manager and team.
2. Experience with design and construction support for Stormwater facilities.
3. Knowledge of Ecology grant requirements for design and construction projects.
4. Handling of unforeseen circumstances and ability to meet desired schedule and
budget.
5. Experience with Local Agencies and the City of Bothell.
6. Coordination with Parks projects including design and construction.
7. Environmental and permitting expertise.
8. QA/QC process and lessons learned from past projects.
Projects shall not be considered valid where they were completed "by the Consultant"
but with different staff that are no longer with the Consultant firm. For consideration, the
key individuals associated with the example projects must also be in a key design role
with ongoing and significant responsibilities for the project.
SOQPD - PABL Water Quality Facility Due June 16, 2026 Page 4 of 6

Statement of Qualifications and Performance Data (SOQPD)
If you are interested in the project, please submit a Statement of Qualifications and
Performance Data. The Statement should contain the following:
1. Identification of the team leader with contact information.
2. The structure of the consultant team, including a list of the prime consultant(s)
and all sub-consultants with a brief description of each company, a description of
the organizational structure of the team, and previous experience working
together as a team.
3. A list of each key team member of the prime consultant(s) and sub-consultants
with a brief description of each key member's qualifications and experience and
their role on this project.
4. A list of previous work performed in the last seven (7) years similar to this project
with project name, brief description of the project, date of project, contact name,
and contact telephone number.
5. A brief narrative indicating why your firm/team is qualified for this project based
on the Description of Work and the Major Criteria for Selection.
Schedule
(These dates are estimates and subject to change by the City.)
Event Date
Request for Qualifications May 26, 2026
Submittals Due June 16, 2026, at 2:30 pm
Consultant Evaluation Complete June 17, 2026
Announce Short-listed Consultants June 17, 2026
Consultant Interviews July 7, 2026
Selection and Notification July 16, 2026
City Council Award of Contract October 2026
Notice to Proceed October 2026
Submittal of Statement of Qualifications and Performance Data
The SOQPD shall be no more than 10 pages, excluding the title page (pages containing
information on both sides are considered two pages). To be considered for this work,
interested firms must submit a clearly identified response package in PDF format
submitted electronically to the attention of Rob Holbrook, email:
robert.holbrook@bothellwa.gov no later than 2:30 pm (PST) on June 16, 2026.
Postmarks are not acceptable and no submittals will be accepted after that date and time.
Please direct questions to Rob Holbrook at Robert.Holbrook@bothellwa.gov.
SOQPD - PABL Water Quality Facility Due June 16, 2026 Page 5 of 6

The City of Bothell in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252,
42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of
Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-
assisted programs of the Department of Transportation issued pursuant to such Act,
hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, disadvantaged business enterprises as defined at 49
CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation
and will not be discriminated against on the grounds of race, color, national origin or sex
in consideration for an award.
Published in The Seattle Times and Seattle Daily Journal of Commerce on May 26, 2026,
and June 2, 2026.
SOQPD - PABL Water Quality Facility Due June 16, 2026 Page 6 of 6

3800 Woodland Park Ave N, Suite 200
Seattle, WA 98103
P: 206.285.3026
www.siteworkshop.net
Park at Bothell
Landing Improvement
Project
9919 NE 180TH ST
BOTHELL, WA
DRAWN BY:
REVIEWED BY:
RS, DDG
VS
PROJECT #:
SCALE:
1" = 40'- 0"
(C) SiteWorkshop LLC - ALL RIGHTS RESERVED

N
O
TI
C
DI
S EAST ENTRY
RI
U PLAZA
J
E
N
LI
E
R
O
H
S FITNESS
STATIONS
PUMP TRACK
UTILITY SETBACKS
SKATE BOWL NATURE TRAILS
HORSE CREEK
100' BUFFER ENTRY
K L
A
W
R
E
V
RI
STREET SKATE
R
RESTROOMS E
F
F
U
B
E
N
LI VIEWING
E
R DECK, TYP.
O
PARKING - 62 STALLS H S
LAWN
PLAZA
&FOUNTAIN
WETLAND A FOOD TRUCKS/
40' BUFFER EVENT TENTS
UTILITY SETBACKS
SCHOOL
HOUSE
COMMUNITY
RESTROOMS
HANNAN
INCLUSIVE ROOM
HOUSE
PLAY
AREA
KAYAK
RENTAL BECKSTROM
CABIN
(E) BRIDGE
AMPHITHEATER
KAYAK STAGE WITH
STAGING ROOF
BOAT
LAUNCH
VIEWING
DECK, TYP.
SAMMAMISH RIVER
EN
YAW
LLEHTOB
+41.50 3800 Woodland Park Ave N, Suite 200
SR-522
P
Se
:
a
2
t
0
tl
6
e
.
,
2
W
85
A
.3 0
9
2
8
6
103
www.siteworkshop.net
OWNER:
CITY OF BOTHELL
18415 101st Avenue NE
+40 Bothell, WA 98011
ARCHITECT:
+38 SHKS ARCHITECTS
1050 N 38th St
Seattle WA, 98103
SR-522
CIVIL ENGINEER:
STATION 10 ENGINEERING
PO Box 171
Edmonds, WA 98020
+35.20
ELECTRICAL ENGINEER:
TFWB ENGINEERS
1200 Westlake Ave, Suite 509
+35.63 +36 Seattle, WA 98109
+37.05
STRUCTURAL ENGINEER:
SSF ENGINEERS
2124 Third Avenue, Suite 100
+34.50 Seattle, WA 98121
GEOTECH & ENVIRONMENTAL SERVICES:
+33.70
+33.83 SHANNON AND WILSON
+32
400 N 34th St #100
Seattle, WA 98103
MECHANICAL ENGINEER:
GDM ARCHITECTS AND ENGINEERS
4317 6th Ave SE, Suite 300
Lacey, WA 98503
LIGHTING DESIGN:
SPARKLAB LIGHTING DESIGN, LLC
3903 S Ferdinand St. Unit A
Seattle, WA 98118
SKATE PARK DESIGN:
GRINDLINE SKATEPARKS, INC.
4619 14th Ave SW
Seattle, WA 98106
TENSILE ROOF DESIGN:
GUILDWORKS
13522 SE Pheasant Ct.
Portland, OR 97222
SURVEY:
+30
TERRANE
+31.73 11235 SE 6th St, Suite 130
Bellevue, WA 98004
Park at Bothell
+29.04
Landing Improvement
Project
9919 NE 180TH ST
BOTHELL, WA
+20.00
100% Design Development
Graphic Site Plan 0 20' 40'
1 DESIGNED BY: RS, VS
1" = 40'-0" DRAWN BY: RS, DDG
REVIEWED BY: VS
REVISIONS
DATE: 02/10/26
PROJECT #: 1597.1
SCALE: 1" = 40'-0"
GRAPHIC SITE PLAN
T1.00
(C) SiteWorkshop LLC -ALL RIGHTS RESERVED

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow NTRAPS Automatic Activation Devices Active Contract Opportunity Notice ID FA462026QA285 Related Notice

DEPT OF DEFENSE

Bid Due: 7/27/2026

Follow NTRAPS Automatic Activation Devices Active Contract Opportunity Notice ID FA462026QA285 Related Notice

DEPT OF DEFENSE

Bid Due: 7/27/2026

Follow Notice of Intent to Sole Source: Butler Parachute Harnesses Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 7/26/2026

Project ID: CTY-CR-2025-11 Title: CITYWIDE CONSULTANT ROSTER: Human Resources and Workplace Management Consulting

City of Seattle

Bid Due: 12/30/2030