Pajaro River FRM Reach 6 - Division 0
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Mar 31, 2025 |
| Due Date: | Apr 21, 2025 |
| Solicitation No: | W912P725S0007 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Mar 31, 2025 01:18 pm PDT
- Original Response Date: Apr 21, 2025 03:00 pm PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: May 06, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Watsonville , CAUSA
PROJECT DESCRIPTION:
This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The Pajaro FRM Project consists of from Reach 2 to Reach 6 of the Pajaro flood control system. This 1TB is for Reach 6 of the Pajaro FRM Project. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes. The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base. Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. Construction for Reach 6 is likely to be performed across the at two construction seasons. See Attachment 1 for Site Map. There are two side channels designed to enhance eco-system restoration in the Project. The material excavated from the channels is not suitable to be used for the engineered levee along. Suited soil will be imported offsite to blend with the excavated soil for levee fill. The site has limited access. Some of the ingress/egress are through unpaved dirt roads in farm fields. Attachment 2 shows permanent easements, staging area and hauling routes. Material from excavation will be stockpiled and mixed with imported soil onsite.
REQUEST INPUT:
The Government seeks input from interested companies to better understand socio-economic capability, inform participation, and address engineering, acquisition considerations. If your company is interested in this project, please submit a response to include the following information:
1. Company Name
2. Company Point of Contact
3. Company Size
4. Company Experience
5. Company Bonding Limit
Please submit no more than 2 projects for your experience (similar in scope, complexity, and magnitude of this project), within the last 10 years, indicating your company's role in the execution of the work (prime or subcontractor). The information provided by your company will not be disclosed without your prior consent.
Please answer the following questions in your submission:
1. What challenges (reservations) do you have about this project?
2. The Government contemplates utilizing a lump sum or job pricing approach for the work and does not plan to include a line item for the estimated quantity and cost per cubic yard of fill. Given this approach, what are your concerns, if any?
Please submit your responses no later than April 21, 2025 3:00 PM PST. Limit submissions to 10 pages. All interested companies must be registered in the System for Award (SAM) to be eligible for a federal contract award. Please email responses to logan.champlin@usace.army.mil. Please send your responses via email, and use subject line: "Sources Sought Response
to W912P725S0007 - Pajaro River FRM Reach 6".
- KO CONTRACTING DIVISION 450 GOLDEN GATE AVENUE
- SAN FRANCISCO , CA 94102-3406
- USA
- Logan Champlin
- logan.champlin@usace.army.mil
- Phone Number 4155036953
- Mary C. Fronck
- mary.fronck@usace.army.mil
- Phone Number 4155036554
- Fax Number 4155036688
- Mar 31, 2025 01:18 pm PDTSources Sought (Original)
See Also
BID NO. 2026-27-B4 ARROYO HIGH SCHOOL SITE PREPARATION AND PORTABLE RELOCATION PROJECT PROPOSALS
El Monte Union High School District
Due by 9/23/2026
Event Name Business Unit Event ID Event Format Event Type Ends In Start
County of Sonoma
Due by 10/06/2026
Follow USACE Sacramento District DB/DBB Construction - $465M Small Business MATOC Active Contract
DEPT OF DEFENSE
Adams Middle School Cellular Coverage Project
Brentwood Unified School District
Due by 10/05/2026