Pajaro River FRM Reach 6 - Division 0

Agency: DEPT OF DEFENSE
State: California
Type of Government: Federal
FSC Category:
  • Y - Construction of Structures and Facilities
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Mar 31, 2025
Due Date: Apr 21, 2025
Solicitation No: W912P725S0007
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
Pajaro River FRM Reach 6 - Division 0
Active
Contract Opportunity
Notice ID
W912P725S0007
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION SOUTH PACIFIC
Office
W075 ENDIST SAN FRAN
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Mar 31, 2025 01:18 pm PDT
  • Original Response Date: Apr 21, 2025 03:00 pm PDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: May 06, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Watsonville , CA
    USA
Description

PROJECT DESCRIPTION:



This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The Pajaro FRM Project consists of from Reach 2 to Reach 6 of the Pajaro flood control system. This 1TB is for Reach 6 of the Pajaro FRM Project. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes. The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base. Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. Construction for Reach 6 is likely to be performed across the at two construction seasons. See Attachment 1 for Site Map. There are two side channels designed to enhance eco-system restoration in the Project. The material excavated from the channels is not suitable to be used for the engineered levee along. Suited soil will be imported offsite to blend with the excavated soil for levee fill. The site has limited access. Some of the ingress/egress are through unpaved dirt roads in farm fields. Attachment 2 shows permanent easements, staging area and hauling routes. Material from excavation will be stockpiled and mixed with imported soil onsite.



REQUEST INPUT:



The Government seeks input from interested companies to better understand socio-economic capability, inform participation, and address engineering, acquisition considerations. If your company is interested in this project, please submit a response to include the following information:

1. Company Name

2. Company Point of Contact

3. Company Size

4. Company Experience

5. Company Bonding Limit





Please submit no more than 2 projects for your experience (similar in scope, complexity, and magnitude of this project), within the last 10 years, indicating your company's role in the execution of the work (prime or subcontractor). The information provided by your company will not be disclosed without your prior consent.





Please answer the following questions in your submission:

1. What challenges (reservations) do you have about this project?

2. The Government contemplates utilizing a lump sum or job pricing approach for the work and does not plan to include a line item for the estimated quantity and cost per cubic yard of fill. Given this approach, what are your concerns, if any?





Please submit your responses no later than April 21, 2025 3:00 PM PST. Limit submissions to 10 pages. All interested companies must be registered in the System for Award (SAM) to be eligible for a federal contract award. Please email responses to logan.champlin@usace.army.mil. Please send your responses via email, and use subject line: "Sources Sought Response

to W912P725S0007 - Pajaro River FRM Reach 6".


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 450 GOLDEN GATE AVENUE
  • SAN FRANCISCO , CA 94102-3406
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 31, 2025 01:18 pm PDTSources Sought (Original)
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

BID NO. 2026-27-B4 ARROYO HIGH SCHOOL SITE PREPARATION AND PORTABLE RELOCATION PROJECT PROPOSALS

El Monte Union High School District

Due by 9/23/2026

Event Name Business Unit Event ID Event Format Event Type Ends In Start

County of Sonoma

Due by 10/06/2026

Follow USACE Sacramento District DB/DBB Construction - $465M Small Business MATOC Active Contract

DEPT OF DEFENSE

Adams Middle School Cellular Coverage Project

Brentwood Unified School District

Due by 10/05/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.