| Agency: | State Government of Ohio |
|---|---|
| State: | Ohio |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 3, 2026 |
| Due Date: | Feb 19, 2026 |
| Solicitation No: | SRC0000036719 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Solicitation ID: | SRC0000036719 |
| Solicitation Name: | Painting and Patching Unit K- 02032026 |
| Original Begin Date: | 2/3/2026 8:28:34 AM |
| Begin Date: | 2/3/2026 8:28:34 AM |
| End Date: | 2/19/2026 2:00:00 PM |
| Inquiry End Date: | 2/17/2026 2:00:00 PM |
| Commodity: | Painting services |
| MBE Set Aside: | MBE Set Aside |
| Agency: | DMH711120 CIN Maintenance SUBH |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000036719
|
|||
|
Solicitation Name
Painting and Patching Unit K- 02032026
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
2/3/2026 8:28:34 AM (ET)
|
Amendment?
|
||
|
End Date
2/19/2026 2:00:00 PM (ET)
|
Inquiry End Date
2/17/2026 2:00:00 PM
|
||
|
Summary
The Ohio Department of Behavioral Health, Summit Behavioral Healthcare location is looking for a Painting Service to paint and patch the interior walls and bedrooms of Unit K.
Project Overview: The vendor is responsible for patching and painting the interior walls on unit K. In addition the are 3 bedrooms/bathrooms that need painted. The goal is to achieve a clean, uniform finish throughout all specified areas. In addition to these rooms, painting/patching the nursing stations wall. The ceiling is not included 1. Project Details
2.
Scope of Work
Preparation
Patching
Priming (if required)
Painting
|
Predecessor Contract
|
||
|
Process
The Ohio Department of Behavioral Health (DBH) will award this project to the lowest-cost responsive and responsible supplier. The awarded supplier must include all applicable costs for delivery, setup, and warranty in their submission.
|
|||
|
Ship To
P002265 DMH SUMMIT BHO Cincinnati
|
|||
1 Record(s)
|
0 Record(s)
|
1 Record(s)
|
Scope of Work for Vendor: Painting and Patching the interior walls and bedrooms of unit K
Project Overview: The vendor is responsible for patching and painting the interior walls on unit K. In addition the are 3 bedrooms/bathrooms that need painted. The goal is to achieve a clean, uniform finish throughout all specified areas. In addition to these rooms, painting/patching the nursing stations wall. The ceiling is not included
1. Project Details
• Spaces to be painted: The common area on unit K - walls of the unit and patient bedrooms/bathrooms.
• Surfaces to be painted: Walls
• Existing Condition: Minor patches may be required for imperfections or previous damage.
2. Scope of Work
Preparation
• Inspect each area requiring patchwork, such as cracks, dents, or holes.
• Ensure all walls are dry, and free of debris before starting work.
• Remove or cover all furniture, fixtures, and floor surfaces to protect from dust and paint splatters.
• Mask and tape all baseboards, trim, and edges around ceilings, doors, and windows to ensure clean paint lines.
• Move or protect any electrical outlets, light fixtures, and vent covers.
Patching
• Patch all cracks, holes, or surface imperfections using suitable materials for drywall or plaster.
• Sand patched areas smoothly to blend with the existing surface, ensuring a seamless finish.
• Conduct a final inspection to confirm all patched areas are smooth and level.
Priming (if required)
• Apply primer to any patched areas or other areas where needed, ensuring color consistency.
Painting
• Materials and Color: Use paint specified by the client (e.g., low-VOC paint, finish type (SATIN), and color) on walls and ceilings.
• Paint Application: Apply at least two coats of paint for full coverage and uniform finish.
• Maintain proper ventilation and temperature during the painting process.
• Check for uniformity in color and texture after each coat and correct any visible inconsistencies.
Clean-Up
• Remove all protective coverings carefully to avoid any paint spills or damage.
• Clean any minor paint splatters on floors, trim, and fixtures.
• Restore each area its original condition, moving furniture and fixtures back into place.
3. Quality Standards
• All painted surfaces should be smooth, consistent in color, and free of brush strokes, streaks, or roller marks.
• Patches should blend seamlessly with the rest of the wall or ceiling, with no visible lines or texture differences.
• All work should adhere to professional standards, with final inspections in each room to ensure a high-quality finish.
4. Project Timeline
• Start Date: February 23rd, 2026
• Completion Date: March 20, 2026
• The vendor will provide an estimated timeline for each unit and coordinate with the client if adjustments are required.
5. Deliverables
• Fully patched and painted walls in unit K (Common areas)
• Each area inspected and signed off by the client to confirm quality.
6. Materials and Supplies
• Responsibility for Materials: Vendor will supply paint, primer, and patching materials.
• Waste Disposal: Vendor is responsible for removing all debris and disposing of it off-site.
7. General Requirements
• Vendor must comply with all applicable safety and environmental regulations.
• Maintain a clean and safe working environment in all areas throughout the project.
• Provide regular updates to the client on project progress.
• Site Visit required to be considered for project
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow B522 HVAC, B414 DEMO Active Contract Opportunity Notice ID W50S8R26BA002 Related Notice
Federal Agency
Bid Due: 7/30/2026
Follow ZQEL 22-0006 Renovate B301 Active Contract Opportunity Notice ID FA665626B0003 Related Notice
Federal Agency
Bid Due: 7/22/2026
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated
Ohio Facility Construction Commission
Bid Due: 7/01/2026
Follow Wright-Patterson AFB - Foundation for Vibration Table System Active Contract Opportunity Notice
Federal Agency
Bid Due: 7/13/2026