2026-20: Pace Street Floodplain Restoration
Attachment Preview
CITY OF COVINGTON
ENGINEERING DEPARTMENT
EXHIBIT A
TECHNICAL SPECIFICATIONS
Pace Street Floodplain Restoration Project
Prepared by:
City of Covington Engineering Department
July 2026
These Technical Specifications are intended to supplement the Contract Documents for the Pace
Street Floodplain Restoration Project. In the event of a discrepancy between these Technical
Specifications and the Agreement, Bid Schedule, or other Contract Documents, the Contractor
shall notify the City Representative in accordance with Section 1.5 before proceeding with the
affected Work.
PART 1 – GENERAL
1.1 Intent
These Technical Specifications establish the minimum requirements for construction of the Pace
Street Floodplain Restoration Project. The Specifications are intended to supplement the
Drawings, Bid Schedule, Agreement, and other Contract Documents by defining the
requirements for materials, construction, administration, submittals, and project closeout.
The Contractor shall furnish all labor, materials, equipment, supervision, transportation, and
incidentals necessary to complete the Work in accordance with the Contract Documents.
1.2 Definitions
For purposes of these Technical Specifications, the following definitions apply.
City
The City of Covington, Georgia.
City Representative
The individual designated by the City to administer the Contract, observe the Work, verify
quantities, and communicate with the Contractor regarding project requirements.
Contract Documents
The Agreement, Drawings, Technical Specifications, Bid Schedule, Addenda, Change Orders,
and all other documents identified in the executed Contract.
Contractor
The individual, partnership, corporation, or other legal entity that has entered into the Contract
with the City to perform the Work.
Final Acceptance
Written acceptance issued by the City indicating that the Work has been completed in
accordance with the Contract Documents.
Work
All labor, materials, equipment, services, supervision, transportation, and incidentals necessary
to complete the Project in accordance with the Contract Documents.
1.3 Scope of Work
The Work generally consists of sediment removal, grading, riprap installation, erosion control,
stabilization, hauling and disposal of excavated material, and all related work necessary to
complete the Pace Street Floodplain Restoration Project as shown on the Drawings and required
by the Contract Documents.
The Contractor shall complete all Work necessary to provide a finished project, whether
specifically identified herein or reasonably incidental to the Work shown on the Drawings.
1.4 Examination of Site
Before beginning construction, the Contractor shall become familiar with existing site
conditions, access limitations, utility locations shown in the Contract Documents, and conditions
that may affect performance of the Work.
Failure to examine the site shall not relieve the Contractor of responsibility for completing the
Work in accordance with the Contract Documents.
1.5 Contract Document Discrepancies
If the Contractor discovers any discrepancy, inconsistency, ambiguity, omission, or conflict in
the Contract Documents, the Contractor shall promptly notify the City Representative before
proceeding with the affected Work.
The Contractor shall not proceed based upon assumptions or its own interpretation of the
Contract Documents.
The City Representative shall provide direction regarding the affected Work.
Work performed without first notifying the City Representative of a discrepancy, inconsistency,
ambiguity, omission, or conflict in the Contract Documents may be subject to rejection or
correction at the Contractor's expense.
1.6 Protection of Existing Improvements
The Contractor shall protect existing utilities, drainage structures, pavements, vegetation
designated to remain, fences, signs, and other existing improvements affected by the Work.
Any damage resulting from the Contractor's operations shall be repaired or replaced at no
additional cost to the City.
1.7 Existing Utilities
Utility locations shown on the Drawings are based upon information available at the time of
design and are not guaranteed to be complete or accurate.
The Contractor shall coordinate utility locates as required by law before excavation.
If previously unknown utilities or conflicts are encountered, the Contractor shall immediately
notify the City Representative before proceeding with the affected Work.
1.8 Coordination
The Contractor shall coordinate construction activities with the City Representative, utility
owners, adjacent property owners when required, and other parties whose operations may be
affected by the Work.
The Contractor shall maintain reasonable access to adjacent properties unless otherwise
approved by the City.
1.9 Protection of the Public
The Contractor shall conduct operations in a manner that minimizes inconvenience to the public
and protects public health and safety.
Temporary traffic control, barricades, warning devices, and pedestrian protection shall be
provided as required by applicable regulations and the Contract Documents.
1.10 Weather Limitations
The Contractor shall not perform grading, stabilization, or other operations when weather or site
conditions would prevent satisfactory results or cause damage to completed Work.
1.11 Housekeeping
The Contractor shall maintain the project site in a clean and orderly condition throughout
construction.
Debris, waste materials, and excess excavated material shall be removed as Work progresses.
Public streets and adjacent properties affected by hauling operations shall be kept reasonably
clean.
1.12 Authority of the City Representative
The City Representative may observe the Work, reject nonconforming Work, verify quantities
for payment, and communicate requirements necessary to achieve compliance with the Contract
Documents.
The City Representative does not have authority to modify the Contract Price or Contract Time
except through the procedures established elsewhere in the Contract Documents.
PART 2 – CONTRACTOR
REQUIREMENTS
2.1 General
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66275-NONST-2027-000000010
State Government of Georgia
Due by 11/16/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33552-NONST-2027-000000021
State Government of Georgia
Due by 11/10/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33699-NONST-2027-000000140
State Government of Georgia
Due by 11/10/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33561-NONST-2027-000000075
State Government of Georgia
Due by 11/10/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.