Overlake Accessibility Improvements Request for Qualifications

Agency: City of Redmond
State: Washington
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
  • 541990 - All Other Professional, Scientific, and Technical Services
Posted Date: Aug 31, 2026
Due Date: Sep 23, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Bid Title: Overlake Accessibility Improvements Request for Qualifications
Category: Bidding & Contracting Opportunities
Status: Open
Description:

The City of Redmond is soliciting interest from consulting firms under this Request for Qualifications (RFQ) for design services for the construction of ADA curb ramps primarily within the vicinity of 150th Avenue NE and NE 40th Street. The selected consultant team will be responsible for preparing planning level analyses, identifying appropriate locations, developing a design report, obtaining necessary permits, and producing plans, specifications, and cost estimates. The team will also provide support services related to real property and arborist assessments.

Download the RFQ below for full information. Any additional information or addendums will be added to this bid posting. The City recommends signing up for text or email alerts to receive notification of updates.

Publication Date/Time:
8/31/2026 5:00 AM
Publication Information:
Project Number 2332
Closing Date/Time:
9/23/2026 4:00 PM
Contact Person:
Project Manager: Ilir Dardania
Email: [email protected]
Related Documents:

Attachment Preview

Connected Community
Enhanced Livability
Environmental Sustainability
Request for Qualifications
Overlake Accessibility Improvements
Vicinity of 150th Ave NE and NE 40th St
Project Number: 2332
QUALIFICATIONS DUE: 4:00 p.m. September 23, 2026
TABLE OF CONTENTS
General Information ...............................................................................................................................1
Project Information .................................................................................................................................2
Scope of Work .........................................................................................................................................3
Submittal Content...................................................................................................................................5
Submittal Requirements.........................................................................................................................6
Evaluation and Selection Process .........................................................................................................6
Terms and Conditions ............................................................................................................................7
Appendix A: Local Agency A&E Professional Services Negotiated Hourly Rate Consultant
Agreement
Appendix B: Vicinity Map – Project Area for Potential ADA Improvements
Form Rev. 2026-04-16
Request for Qualifications
General Information
Introduction
The City of Redmond (Redmond or the City) is soliciting interest from consulting firms under
this Request for Qualifications (RFQ) for design services for the construction of ADA curb
ramps primarily within the vicinity of 150th Avenue NE and NE 40th Street. The selected
consultant team will be responsible for preparing planning-level analyses, identifying
appropriate locations, developing a design report, obtaining necessary permits, and
producing plans, specifications, and cost estimates. The team will also provide support
services related to real property and arborist assessments.
Questions regarding this project or solicitation must be submitted to Ilir Dardania at
idardania@redmond.gov or 425-556-2719. Redmond staff will not answer questions directly,
but will collect questions and post responses on redmond.gov/bids. Answers to questions
submitted by 3:00 p.m. September 14, 2026, will be posted by September 16, 2026.
Questions submitted after the September 14, 2026, deadline will not be answered.
Any additional information or addendums will be posted to redmdond.gov/bids. The City
recommends signing up for text or email alerts to receive notification of updates to this bid
posting.
Schedule and Project Programming
The following table outlines key dates in this RFQ process.
Item
Solicitation publication/announcement
Last day to submit questions
Submittals due
Review period
Shortlisted consultants notified
Interviews with shortlisted consultants
Notification of selection
Negotiation with selected consultant(s)
Contract award anticipated
Date
August 31, 2026; September 2, 2026
September 14, 2026
September 23, 2026
September 24 - October 7, 2026
October 7, 2026
October 8 – 9, 2026
October 12, 2026
October 2026 – November 2026
January 2027
Americans with Disabilities Act (ADA) Information
The City of Redmond in accordance with Section 504 of the Rehabilitation Act (Section 504)
and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of
disability, in all of its programs and activities. This material can be made available in an
alternate format by contacting Customer Service Division at info@redmond.gov or by calling
425-556-2900, Option 7.
1
Overlake Accessibility Improvements
City of Redmond
August 2026
Request for Qualifications
Disadvantaged/Small Business Enterprise Participation
Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE)
is encouraged. In keeping with Washington State goals, a voluntary SBE goal amount of ten
percent of the Consultant Agreement is established. The Consultant shall include a SBE
Participation Plan with their submittal. Although the goal is voluntary, the outreach efforts to
provide SBE maximum practicable opportunities are not.
Title VI Statement
The City of Redmond, in accordance with Title VI of the Civil Rights Act of 1964, hereby
notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to
this advertisement, disadvantaged business enterprises as defined at 49 Code of Federal
Regulations Part 26 will be afforded full opportunity to submit bids in response to this
invitation and will not be discriminated against on the grounds of race, color, national origin,
or gender in consideration for an award.
Project Information
Background
The scope of this project is to construct approximately twenty new ADA-compliant curb ramps
and driveway approaches within the vicinity of 150th Avenue NE and NE 40th Street,
excluding the ADA ramps along the south side of NE 40th Street from 148th Avenue NE to
SR 520. The project will include the removal of existing curb ramps and driveway approaches
that do not meet current ADA standards, followed by construction of new compliant ADA
ramps and driveway approaches, along with two feet of new asphalt concrete pavement in
front of each newly installed ADA elements. Tree preservation and potential relocation should
be carefully evaluated and incorporated into the design process.
Estimated design and construction cost: $1,200,000
Consultant Notice to Proceed:
First Quarter 2027
Target construction start:
Fourth Quarter 2027— First Quarter 2028
Target construction completion:
2028
Project Funding
This project has received Community Facility District (CDF) funding in the amount of
$1,500,000.
Project Challenges and Constraints
The project will be constructed primarily within existing public right-of-way or easement areas;
however, temporary easements may be required for construction activities, as well as material
and equipment staging. Project constraints include roadway slopes at certain potential
locations, which may necessitate additional pavement reconstruction that could exceed the
project budget. Additional considerations include impacts to vehicular and pedestrian traffic,
limited work hours from Monday through Friday, and environmental considerations related to
potential tree removal or relocation.
2
Overlake Accessibility Improvements
City of Redmond
August 2026
Request for Qualifications
Scope of Work
Consultant Scope
The consultant shall provide engineering design services and related support across two
phases:
Phase 1
• Planning-level analyses
• Identification of potential ADA curb ramp and driveway approach locations
• Preparation of a Rough Order of Magnitude (ROM) cost estimate
• Design report summarizing Phase 1
Phase 2
• Project management during design
• Data collection and survey/mapping
• Detailed design of curb ramps and driveway approaches
• Real property support-with property easements
• Arborist services
• Preparation of Plans, Specifications, and Estimates (30%, 60%, 90%, and Bid-Ready
package)
• Support during bid advertisement period
• Optional project management and design support during construction
Consultant shall provide preliminary and final engineering design services and other work
including:
Task 1 – Project Administration
• Attend project meetings
• Manage consultant’s project budget
• Prepare monthly progress reports and invoices
• Provide initial project schedule and monthly updates on milestones
• Quality Assurance/Quality Control of all deliverables
• Coordinate plan revisions and response to City Comments on all deliverables
• Regular communication with City project manager on progress, problems, and issues
Task 2 – Scoping and Initial Concept
• Conduct planning-level analyses
• Review existing conditions and identify potential ADA curb ramps and driveway
approaches to be included in the project
• Develop a ROM cost estimate and preliminary timeline
• Design Report summarizing findings
3
Overlake Accessibility Improvements
City of Redmond
August 2026
Request for Qualifications
Task 3 – Preliminary Design
• Survey
• Prepare 30% Design Drawings and Cost Estimate – submit plans for City staff to review
including:
• Title sheet with project location and plan index
• General notes sheet with legend
• Existing conditions within right-of-way and easements areas
• Project details and notes
• Demolition and removal plans
• ADA-complaint curb ramps, driveway approaches and sidewalks.
• Crosswalk striping and landscaping
Task 4 – Final Design
• Prepare 60% and 90% Design Drawings, Specifications and Cost Estimate
• Title sheet with project location and plan index
• General notes sheet with legend
• Existing conditions within right-of-way and easements areas
• Temporary Erosion and Sediment Control (TESC)
• Demolition and removal, tree protection
• ADA-complaint ramps, driveway approaches, sidewalks, and pavement in front of the
curbs
• City and franchise utility relocation/adjustment
• Crosswalk striping and landscaping
Task 5 – Advertising and Bidding
• Finalize contract documents for advertisement
• Provide engineer’s estimate of construction costs
• Respond to bidder questions
• Prepare Addendums
Task 6 – Optional Construction and Closeout
• Review and prepare responses for Material Submittals (RAMS)
• Review and respond to Request for Information (RFIs)
• Review and prepare design changes
• Review and approve Maximum Extent Feasible (MEF) Reports
Task 7 – Other Services
• Assistance with real property easements
• Arborist services
• Assistance with coordination and approval for potential tree removal and protection of
with private property or easements
• Public outreach
4
Overlake Accessibility Improvements
City of Redmond
August 2026
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Solicitation Information Title Auditing, collection & delivery of state unclaimed property Reference Number

State Government of Washington

Due by 11/23/2026

Project ID: FAS 2026-039 Title: On-Call Elevator Assessment, Modernization or Replacement and Construction

City of Seattle

Due by 11/19/2026

Project ID: Title: Design and Engineering for Davis Lake Road MP 1.67 Slide

Lewis County

Due by 11/13/2026

Follow C1DA--VISN 1 - INDEFINITE DELIVERY INDEFINITE QUANTITY ARCHITECT CONTRACT (Legacy VISN 5)

VETERANS AFFAIRS, DEPARTMENT OF

Due by 1/08/2027

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.