Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Mississippi |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 3, 2025 |
| Due Date: | Jul 10, 2025 |
| Solicitation No: | W912EE25B0002 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: Jul 03, 2025 12:41 pm CDT
- Original Response Date: Jul 10, 2025 01:00 pm CDT
- Inactive Policy: Manual
- Original Inactive Date: Sep 30, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Vicksburg , MS 39183USA
W912EE - Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22
The Consolidation Determination and Finding (attached) is posted in accordance with FAR 7.107-5(c):
"(c) Notification to the public of consolidation of contract requirements. The SPE or CAO shall publish in the GPE—
(1) A notice that the agency has determined a consolidation of contract requirements is necessary and justified (see 7.107-2) no later than 7 days after making the determination; the solicitation may not be publicized prior to 7 days after publication of the notice of the agency determination; and
(2) The determination that consolidation is necessary and justified with the publication of the solicitation. See 7.107-2 for the required content of the determination."
The work consists of furnishing all necessary plant, labor, materials, and equipment, and performing all work constructing longitudinal peaked stone toe dikes (LPSTDs) with stone tiebacks and stone fill revetment at five sites along the Ouachita River in Northeast Louisiana, south of Monroe, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, and bank stabilization work consisting of tiebacks, excavation, and backfill.
Pursuant to Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii), the magnitude of the proposed construction project is between $25,000,000.00 and $100,000,000.00.
- KO CONTRACTING DIVISION 4155 CLAY STREET
- VICKSBURG , MS 39183-3435
- USA
- Freteshia L. Johnson
- Freteshia.L.Johnson@usace.army.mil
- Phone Number 6016315219
- Robert Ellis Screws
- Ellis.Screws@usace.army.mil
- Phone Number 6016317527
- Jul 03, 2025 12:41 pm CDTSpecial Notice (Original)
- Jun 30, 2025 10:55 pm CDT Sources Sought (Original)
Related Document
See Also
Procurement Details Smart Number 147-20261006164854 Richland Advertised Date 11/06/2026 5:00 PM RFx #
State Government of Mississippi
Due by 11/13/2026
Follow UPPER MISSISSIPPI RIVER RESTORATION (UMRR) POOL 12 FLOODPLAIN FOREST STAGE ONE (1)
DEPT OF DEFENSE
Due by 12/02/2026
Bids due in 33 days 12/8/26 2:00pm Electronic bidding 27-14 Construction of Wingo
Neel-Schaffer, Inc
Due by 12/08/2026
Dec 15 Bids in 39 days STP-7287-00(001) McClure Road Bridge Replacement #21257 City
City of Jackson
Due by 12/15/2026