OPRS 7175 Spring Mill State Park HVAC 2 Year Preventative Maintenance Contract
| Agency: | State Government of Indiana |
|---|---|
| State: | Indiana |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 10, 2026 |
| Due Date: | Aug 17, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Project name and number | OPRS 7175 Spring Mill State Park HVAC 2 Year Preventative Maintenance Contract |
| Notice to bidders, bid date, time | Aug. 10, 2026, 11 a.m. |
| Pre-bid meeting date, time, location | N/A |
| Pre-qualification required | N/A |
| Project specifications | Scope of Work |
| Plan | Instructions to Bidders |
|
Meeting minutes, addenda,
clarification requests due |
N/A |
| Other documents - Scope of Work (SOW), Schedule A, Preventative Maintenance Services, Bid Contract Specifications, Additional Specifications | Schedule A |
| Applicable (assigned) DNR buyer or Project Manager |
Attachment Preview
2026 HVAC AND PLUMBING EQUIPMENT
INSPECTION AND MAINTENANCE SCOPE OF WORK
Contractor shall provide a monthly inspection and scheduled maintenance; listed in the Scope of
Work, to all HVAC and Plumbing equipment; listed in Schedule A, according to the terms and
conditions herein to (hereafter refer to as Customer). Technicians used on-site must be certified for
service of AAON and Daikin equipment located at Spring Mill Inn, Spring Mill State Park.
**Contractor must have access to the AAON service tool and software first day of contract and
maintain access through the length of the contract.
Contractor must have access to a Daikin Service Checker tool and software first day of
contract and maintain access through length of the Contract.**
A. Contractor shall:
1. Perform scheduled maintenance and inspection as outlined in this Scope of Work.
2. Scheduled maintenance and inspection shall be on only equipment listed in Schedule A.
3. Furnish Customer with a written report of each inspection and of any conditions which require
repairs or corrective action. If authorized by the Customer, contractor will make the needed repairs at
the Customer service rate listed in the Scope of Work.
4. Provide filters as listed in Schedule A for a monthly change.
5. Perform scheduled maintenance and inspection functions as a part of the Scope of Work fee to
include:
Monthly Inspection Items – 1 On-site visit per month:
Check in with onsite contact
Connect software to VRV system, complete visual inspection of all systems checking system for
alarms, error codes, and proper system operation
Complete visual inspection of all condensers and fluid cooler, check coils for debris, light
cleaning as needed
Complete visual inspection of Air Handlers, checking coils, replacing filters, and checking
operation of heat recovery wheels
Complete visual inspection of mechanical room equipment including boilers, hydronic pumps,
water heaters, expansion tanks and system gauges
Report and provide list of recommended repairs, actions, suggestions for improved equipment
operation, efficiency, and dependability
Quarterly Inspection Items– (January, April, July, October) In Conjunction with Monthly
Inspection items:
• Daikin VRV System
Collect and record (1) hour of operational data, using Daikin Service Checker software, for
monitoring equipment operation and active system errors
Analyze data and confirm proper operation of all systems
Confirm that all indoor units and heat recovery boxes are communicating
Check high and low refrigerant pressures
Check to ensure calibration of all EEV/LEV valves
Confirm proper sub cooling and super heat
Confirm proper discharge super heat
Confirm proper Hex temperatures and refrigeration flow
Check that all oil indicators are working
Confirm operation of reversing valves
Confirm operation of crank case heaters
Check range of all thermistors
Check unit for voltage and phase imbalance
Check all electrical connections
Clean Condenser Coils
• AAON Condensers
Clean Condenser Coils
• Indoor Units
Check pipe in/out temperatures
Confirm Sub Cooling/Super heat in correct range on all indoor units
• Controls
Connect to BMS system to monitor room set point vs. actual temperatures
Retain BMS provider to ensure system will receive updates throughout length of contract.
BMS provider will provide visits to meet with staff and check the BMS system two times
per year.
• Air Handler 145
Clean evaporator coil, reheat and aux. heat coil
• Water Softeners
Check salt level
Check overall condition
*Spring Inspection Items – To be completed in conjunction with April Onsite
Visit
• Indoor Cassette, wall mounted, and floor concealed units – A client
representative will be required to accompany Contractor personnel in all
occupied rooms
Complete a visual inspection of all cassette units
Pull and wash indoor cassette and wall mounted unit filters
Check Evaporator coil for dust, dirt, and debris
Check condensation drain line on all wall mounted units for proper drainage
Remove and clean condensate drain pan on all cassette and ducted units
Check thermostats for proper operation
Check for all electrical connections
Test and check all refrigerant monitors for proper operation
• Air Handling Units
Check amp draw on all fan motors
Check electrical connections on all VFD’s, blow out with compressed air
Check operation of dampers, if applicable
Check condensation drain piping for proper drainage, add algae tablets
Check and adjust, as needed, all safety controls
Check and adjust, as needed, all operating controls
Check condition of evaporator coils and heat coils and reheat coils as applicable
Check electrical connections on AHU integration kits
• AAON Condensing Units
Clean condenser coils
Check electrical connections
Check and adjust, as needed, all safety controls
Check and adjust, as needed, all operating controls
Lubricate applicable bearings and motors
• Ducted VRV units
Check and adjust, as needed, all safety controls
Check and adjust, as needed, all operating controls
Check all electrical connections
• Gas Water Heaters
Check water heater gas connections
Check condensate drain, replace condensate neutralizers
Check operation
Check electrical
Check for leaks on tank
Check expansion tank pressure
• Exhaust Fans
Check belts, if applicable
Check balance to avoid vibration
Grease and lubricate bearings
Clean and check for grease buildup
Check amp draw on motors
*Fall Inspections – To be completed in conjunction with October Onsite Visit
• Indoor Cassette, wall mounted, and floor concealed units – A client
representative will be required to accompany Contractor personnel in all
occupied rooms
Complete a visual inspection of all cassette units
Pull and wash indoor cassette and wall mounted unit filters
Check Evaporator coil for dust, dirt and debris
All Evaporator Coil cleanings will need to be client approved and billed in addition to
this contract at a rate of $___________ per Evaporator Coil X 29 Evaporator Coils
=$__________________ check condensation drain line on all wall mounted units for
proper drainage
Remove and clean condensate drain pan on all cassette and ducted units
Check thermostats for proper operation
Check all electrical connections
Test and check all refrigerant monitors for proper operation
• Air Handling Units
Check amp draw on all fan motors
Check electrical connections on all VFD’s, blow out with compressed air
Check operation of dampers, if applicable
Check condensation drain piping for proper drainage, add algae tablets
Check and adjust, as needed, all safety controls
Check and adjust, as needed, all operating controls
Check condition of evaporator coils and heat coils and reheat coils as applicable
• Ducted VRV units
Check and adjust, as needed, all safety controls
Check and adjust, as needed, all operating controls
Check all electrical connections
• AAON Condensing Units
Clean condenser coils
Check electrical connections
Check and adjust, as needed, all safety controls
Check and adjust, as needed, all operating controls
Lubricate applicable bearings and motors
• Boilers
Test the low water level cut off
Test the manual reset high temperature limit
Test the low gas pressure switch
Test operating controls
Check the combustion chamber
Inspect burners for any signs of deterioration or corrosion, inspect combustion chamber
Inspect and clean as needed copper finned tube heat exchanger
Replace ignition electrode and gasket
Inspect venting system
Check gas connections and fittings for leaks
Perform combustion analysis
Blow down stainers including AHU strainers
Check expansion tank pressures
Check air vent on top of hydraulic separator for proper operation
Check glycol levels in loop
• Electric Hanging and Wall Heaters
Check amp draw
Check electrical connections
Check fan operation
• Backflow Preventers
Test backflow
Update backflow inspection date
Provide inspection paperwork to owner and water service provider
• Software Maintenance
Quarterly visits to apply updates and perform ongoing staff training and system review
Renew Software Maintenance Agreement with Tridium (This grants access to all updates
released while SMA is active)
Install and verify Niagara software updates
6. PM service activities will be completed according to schedule listed in “Exhibit A”
B. Excluded from this Scope of Work:
1. Parts, Material, glycol, and refrigerant needed for repairs.
2. Altering equipment from manufacturer’s recommendations.
3. Acts of God i.e., lightning, flood, wind, etc.
4. Belts if applicable
C. Customer Shall:
1. Provide access to the building and to the equipment to be serviced, and remove any
fixtures, merchandise, walls, etc. necessary for the performance of work under this Scope of
Work.
2. Operate covered equipment according to manufacturer’s recommendations.
3. Call only Contracted personnel to perform service on the covered equipment.
4. Make all payments in full when due.
D. Terms of Agreement:
1. Initial terms of this Agreement shall continue in force for a period of one (1) year with either
party able to cancel with a thirty (30) day written notice. To not interrupt service, this Contract
can be renewed on a year-to-year basis after the original term ends unless customer or Contractor
gives the other written notice not to renew at least thirty (30) days prior to the end of the
Agreement term. Billed quarterly; paid in arrears.
Quarterly Invoice Amount =$ _________________
TOTAL FOR ALL SERVICES=$_________________________
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Event Name: Liebert Preventive Maintenance Bid Documents Agency: Environmental Management Event ID: 004950000088357
State Government of Indiana
Due by 9/30/2026
Follow Repair Fire Protection Systems - Project 27-5000: Grissom ARB, IN Active Contract
DEPT OF DEFENSE
Due by 9/25/2026
Follow Roush Lake Elevator Repairs Active Contract Opportunity Notice ID W912P626QA026 Related Notice
DEPT OF DEFENSE
Due by 9/21/2026
Follow (SUBTORPIMA)Torpedo Maintenance Active Contract Opportunity Notice ID N00024-26-R-6411 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Due by 9/17/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.