On Call Excavation Contractor Bid Documents

Agency: Town of East Windsor
State: Connecticut
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238910 - Site Preparation Contractors
Posted Date: Apr 2, 2026
Due Date: May 1, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
date posted notice department
On Call Excavation Contractor Bid Documents

Attachment Preview

TOWN OF EAST WINDSOR
ENGINEERING & PUBLIC WORKS
Mailing Address: 11 Rye Street, Broad Brook, CT 06016
Physical Address: 6 Woolam Road, East Windsor, CT 06088
Leonard J. Norton, P.E. - Director of Public Works/Town Engineer/Tree Warden - Phone (860) 292-7073
RFP Documents On-Call Excavation Contractor Services
East Windsor, CT April 2, 2026
East Windsor Request for Proposal
The Town of East Windsor intends to select several local qualified excavation contractors to provide on-
call services when projects cannot be completed by Town forces and equipment. Interested contractors
are asked to complete the RFP Form. Pricing shall be held for a three (3) year period, May 1, 2023, to
April 30, 2026. Selected contractors shall supply the Town with appropriate Certificates of Insurance
and Hold Harmless Agreements. Proposals will be submitted to the First Selectman’s Office, ATTN:
Jason Bowsza, First Selectman 11 Rye Street, Broad Brook, CT. 06016 no later than 11:00am Friday May
1, 2026.
INFORMATION FOR BIDDERS
Tax Exemption Purchase of materials are exempt from Connecticut sales tax.
Proposal Each proposer shall fill in all blank spaces of the PROPOSAL FORM in ink with no changes
made to the form. Each bid must be in a sealed envelope addressed to Jason Bowsza, First Selectman,
11 Rye Street, Broad Brook, CT. 06016, clearly marked “On-Call Excavation Contractor Services” by
Friday May 1, 2026.
Right to Reject Proposals – The town reserves the right to reject any or all proposals if it is the Town’s
best interest to do so. Proposals submitted or received after the scheduled closing time for receipt of
bids will be rejected.
Acceptance of Proposals Acceptance of proposal will be by notice of the Director of Public
Works/Town Engineer.
Page | 1
GENERAL CONDITIONS
Site Investigation The contractor shall thoroughly investigate the site of the work and acquaint himself
with all available information concerning the project. Failure to do so shall not relieve him from
responsibility for properly estimating the difficulty or cost of successfully completing the project.
Measurements The Contractor shall be responsible for any measurements.
Lien Releases The Contractor shall be responsible to provide lien releases for all subcontractor and
material prior to receiving payment.
Protection of Material and Work The Contractor shall at all times protect and preserve all materials,
supplies, equipment, property and completed work and he will be held responsible for any loss or
damage by any cause including the elements.
Insurance The Contractor shall have the required insurance which shall be maintained in force until all
work performed on this project is completed. All policies shall hold harmless the Town of East Windsor
and the Town and its agents shall be named additional insured. Each insurance certificate shall contain
a statement by the insurance carrier not to cancel the policy except upon thirty (30) days’ notice to the
Town.
Schedule of Insurance:
Manufacturer’s and Contractor’s Liability:
Personal Injury Liability
$1,000,000 Per Person
$1,000,000 per occurrence
Property Damage
$1,000,000 per occurrence
Automotive Liability:
Personal Injury
$1,000,000 per person
$1,000,000 per occurrence
Property Damage Liability
$1,000,000 per occurrence
Town’s Protective Liability:
Personal Injury Liability
$1,000,000 per person
$1,000,000 per occurrence
Property Damage Liability
$1,000,000 per occurrence
The Contractor shall also carry Worker’s Compensation Insurance as required by the State of
Connecticut and any other applicable laws and regulations for all employees engaged in work under the
Contract.
Damages The Contractor shall pay and make good repair to all losses or damages arising from any
cause connected with the Contract and shall indemnify and save harmless the Town from any and all
liability and responsibility for any loss, damage or injury suffered in any way arising out of the Contract
and shall defend any suit which may be brought against the Town or its agents, connected with the work
under the Contract and shall pay all costs or arising out of the Contract.
Page | 2
Extension of Time If conditions beyond control of the Contractor occur and cause delay, the Contractor
may request from the Town Engineer an extension of time, clearly stating the reason for such request.
The Engineer may grant such an extension in writing; however, this shall not be deemed to relieve the
Contractor from his responsibility under this contract.
Measures to Protect the Public The Contractor shall provide and maintain warning signs, lights, signal
devices and barricades at appropriate locations to warn the public of any damages associated with the
project and to prevent access to dangerous areas and shall comply with reasonable requests of the
Town Engineer for additional measures to protect the public.
Clean Up Before the work is considered complete, the Contractor shall thoroughly clean all work areas,
and remove all rubbish, debris, unused and surplus material resulting from the project, leaving the
premises in a condition satisfactory to the Town Engineer. Any disturbed lawn areas shall be restored to
as good or better condition to that existing before the project. If the lawn restoration is done late in the
year the Contractor shall be required to complete the work to establish an acceptable lawn in Spring of
the following year.
Inspection All materials and workmanship shall be subject to inspection by the Town Engineer or his
representative at any time during storage on-site or construction. The Town has the right to reject
defective material and workmanship or require its correction. Rejected workmanship shall be
satisfactorily corrected while rejected materials shall be promptly removed from the site.
Changes in Contract Documents, Scope of Work The Town Engineer reserves the right to make
changes to the contract documents or change the scope of work at any time before or during the
project.
Commencement, Prosecution and Completion The Contractor shall start work under this contract
within 7 days of the Notice to Proceed date, and he shall prosecute the work faithfully to completion,
including final clean-up, within the specified time project.
Payments – For a contract under 60 day’s duration, payment shall be made within 30 days of completion
of the work. For a contract of 60 days duration or more, partial payments shall be made within 30 days
of the receipt of a certified estimate of work performed during the month, approved by the Town
Engineer.
Retainage a 5% retainage shall be held from payments made to the Contractor if there is work
remaining such as lawn restoration, which cannot be completed due to the season.
SPECIAL CONDITIONS
Time for Completion Timely fashion from notice to proceed.
Permits Not required
Work on Private Property, Easements Town to secure as necessary
Subsurface Information None available.
CONSTRUCTION REQUIREMENTS
General It is the Town’s intent to secure work which, at a minimum, will meet the requirements of
Conn DOT “Standard Specifications for Roads, Bridges and Incidental Construction, Form 816, latest
edition”.
Page | 3
RFP FORM
The undersigned declares they have carefully examined the RFP document and location(s) of
work for the project and proposes to perform the work at the following unit prices:
ITEM NO.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
BRIEF DESCRIPTION OF
WORK
Replace Catch Basin Top -
each
Repair Catch Basin 0’ to 2’
deep - each
Repair Catch Basin 2’ to 4’
deep - each
Repair Catch Basin 4’ to 6’
deep - each
Repair Catch Basin over 6’
deep each
Replace Catch Basin up to 6’
deep each
Pavement Patch S. F.
Replace Concrete
Sidewalk - S.F.
Lawn Restoration S.F.
Including erosion control
blanket
Replace 15” Drainage Pipe,
L.F.
Replace 18” Drainage Pipe,
L.F.
Labor Rate per man
Per hour
Utility Truck
Per hour
Skid Steer
Per hour
Backhoe
Per hour
Excavator 36,000lbs
Per hour
Excavator 44,000lbs
Per hour
UNIT PRICE
Page | 4
18.
Tri-Axle Dump
Per hour
19.
Tractor with Low-Bed
Per hour
20.
Tractor with Dump Trailer
Per hour
21.
3 Ton Roller
Per hour
22.
Dozer
Per hour
23.
3 Yard Loader
Per hour
24.
Trench Box 6x6
Per hour
Air Compressor with 90lb
25.
Jack Hammer
Per hour
It is understood that the unit prices will control any contract awarded based on this proposal.
The above prices include the cost of all work to complete the project whether specifically stated
or not. Cost of mobilization and demobilization, miscellaneous clearing and grubbing,
protection of items and any other work required to complete the project shall be included in
the price stated above.
The undersigned certifies that he has not colluded with any individual or firm that has a
competitive interest in responding to this RFP.
Name of Firm: ________________________________________________________________
Mailing Address: ______________________________________________________________
_____________________________________________________________
Phone Number:_______________________________________________________________
Signature of Proposer: _________________________________________________________
Name and Title (typewritten): ___________________________________________________
Page | 5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

20 MT. PLEASANT TERRACE TORRINGTON CT 06790 Bids are invited by owner and

State Government of Connecticut

Bid Due: 6/12/2026

MILK BID Start Date : May 28, 2026 08:00:00 AM EDT End Date

State Government of Connecticut

Bid Due: 6/23/2026

Frozen Food & Staple Goods West Hartford Nutrition Services is accepting proposals for

State Government of Connecticut

Bid Due: 6/22/2026

Follow FCI Danbury 4th Quarter Fruit Active Contract Opportunity Notice ID 15B20326Q00000034 Related

JUSTICE, DEPARTMENT OF

Bid Due: 6/05/2026