Old Bethlehem Pike Bridge Replacement and Streambank Stabilization
| Agency: | PennBid |
|---|---|
| State: | Pennsylvania |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Nov 4, 2024 |
| Due Date: | Dec 4, 2024 |
| Solicitation No: | Lower Gwynedd Township, Montgomery County |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: This Project proposes to remove and replace the existing culvert on Old Bethlehem Pike with a new precast Contech Bridge and stabilize approximately 200 linear of both sides of Willow Run, located behind the Lower Gwynedd Township Building. The contractor will be responsible for excavating, grading, and installing the precast abutments, wingwalls and bridge. Additional improvements include tree removal, storm pipe replacement, live stake plantings and guiderail replacement. The project shall be completed in accordance with the bridge replacement plans and streambank stabilization plans, as prepared by Gilmore & Associates, Inc. PennDOT Specifications Publication 408, as last revised shall also apply.
See Also
Project: Blacksmith Road Culvert Replacement Ref. #: Weisenberg Township, Lehigh County Type: ITB
PennBid
Due by 10/06/2026
Project: KSAT Stage and Trail Project (2026-KST) Ref. #: City of Easton, Northampton
PennBid
Due by 10/07/2026
Bristol Station ADA Improvements - GC Item 26-00236-AVZH GC SEPTA will accept bids
Southeastern Pennsylvania Transportation Authority
Due by 10/07/2026
Project: HWSA - Single Contract - Well 40A Final Hydrogeologic Study and Well
PennBid
Due by 10/13/2026