| Agency: | City of Bangor |
|---|---|
| State: | Maine |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 5, 2026 |
| Due Date: | Jul 1, 2026 |
| Solicitation No: | P26-60 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
P26-60
|
| Bid Title: |
Odlin Road Sidewalk Project
|
| Category: | Construction |
| Status: | Open |
|
PROJECT MANUAL
for the
Odlin Road Sidewalk Project
MeDOT UPI NUMBER 29456.01
CITY OF BANGOR, MAINE
Engineering Department
JUNE 3, 2026
HANNAH E. PEASLEY, PE
JEFFERSON DAVIS, PLA
Director of Engineering
PROJECT: MeDOT UPI 29456.01 ODLIN ROAD SIDEWALK PROJECT
TABLE OF CONTENTS
SECTION TITLE PAGE
A Notice to Contractors A1
B Information for Bidders B1 - B4
C Bid Form C1 - C8
D Contract Agreement D1 - D18
E Special Provisions E1 - E2
F Technical Specifications F1 - F4
MDOT Special Provisions
and specifications
SECTION A
NOTICE TO CONTRACTORS
Bids are requested for the
Odlin Road Sidewalk Project
MeDOT UPI 29456.01
The project includes constructing a new sidewalk along Odlin Road in Bangor, Maine, and will
include new pedestrian signals at Hammond Street/ Odlin road, some new concrete curb
placement, new catch basin, storm drain and other incidental work. The Project is located along
a portion of Odlin Road starting at Hammond Street and extending southerly 0.53 miles to VIP
on Odlin Road, Bangor, Maine.
For consideration, the attached bid form sealed in an envelope, distinctly marked: "PROPOSAL
P26-60: ODLIN ROAD SIDEWALK PROJECT" must be received at the Office of the City
of Bangor Purchasing Agent by 2:00 PM, Wednesday, July 1, 2026. Submissions of the
documents can be completed by:
Hand Deliver to Purchasing Dept., Bangor City Hall, 73 Harlow Street, Bangor, ME or US Post
Office addressed to 73 Harlow Street, Purchasing Department, Bangor, Maine 04401.
A prebid meeting will be held on Tuesday, June 23, 2026 at 1:30 p.m. at the Bangor City Hall
1st Floor Penobscot Conference Room, 73 Harlow Street, Bangor, Maine.
Proposals will be publicly opened at the time stated above at the Bangor City Hall, in the Paul
Bunyan Room, 73 Harlow Street, Bangor Maine. A tabulation of all received proposals will be
posted on the City's website by 4:30 PM on the opening date. Visit www.bangormaine.gov/bids
for results. The
"Show Closed/Awarded/Cancelled Bids" box must be checked to see the proposal information.
Bid security in the amount of 5% of the bid price will be required in the form of cash, a certified
check or bid bond. All work shall be governed by State of Maine Department of Transportation,
"Standard Specifications," revision of March 2020, and "Standard Details," revision of March
2020. The right is reserved to reject any and all bids or to waive informalities or defects in bids
if it is deemed to be in the best interest of the City of Bangor. Basis of award of the Contract is
determined by the lowest qualified bidder. The lowest bidder must have successfully
completed a Highway or project-specific prequalification for Bangor to be considered for
the award of this contract.
All questions regarding any of the above items are to be directed to the bids@bangormaine.gov
email. Questions will be received until 4:30 PM on Wednesday, June 24, 2026. An addendum
will be posted to the City website on Friday, June 26, 2026. Hard copies of the Plans and
Specifications may be obtained at the City of Bangor Engineering Department, 73 Harlow Street,
Bangor, Maine 04401, for a one hundred dollar ($100.00) charge. If plans need to mailed, an
additional fee of $40.00 will be charged. Electronic copies of plans and specifications are
available on the City's website.
A-1
PROJECT: MeDOT UPI 29456.01 ODLIN ROAD SIDEWALK PROJECT
SECTION B
INFORMATION FOR BIDDERS
Odlin Road Sidewalk Project
MeDOT UPI 29456.01
The project includes constructing a new sidewalk along Odlin Road in Bangor, Maine,
and will include new pedestrian signals at Hammond Street/ Odlin road, some new
concrete curb placement, new catch basin, storm drain and other incidental work. The
Project is located along a portion of Odlin Road starting at Hammond Street and
extending southerly 0.53 miles to VIP on Odlin Road, Bangor, Maine.
Description of Work
The work contemplated under the terms of this contract consists of the following general
items of work:
* Excavate existing material, place fill and new gravel where needed and pave with 2
inches of 9.5mm HMA pavement(by others), as shown on the plans.
* Provide new Pedestrian signals at Hammond/ Odlin Road.
* Remove and reset or place new curbing as shown on the plans.
* Provide new ADA compliant detectable warning fields and curb ramps.
* Install new catch basins and stormdrain as shown on the plans.
* Loam and seed and perform other work as shown on the plans, such as remove and
relocate signs.
Definitions
The following terms or, in the case of Owner, Engineer, or Contractor, the singular
pronouns used in their place, shall have the following meanings within the context of this
Contract:
Owner - The City of Bangor, Maine acting through its duly authorized representatives
Engineer - The Bangor City Engineer or their duly authorized representatives
Contractor - The individual, firm, or corporation to whom the contract has been awarded
whether acting on their own or through subcontractors or employees
Contract - The Contract shall be deemed to include the Notice to Contractor, Information
for Bidders, the Bid Form, the Contract Agreement, the Specifications and Plans, any
addenda which may be issued to any of the
B-1
PROJECT: MeDOT UPI 29456.01 ODLIN ROAD SIDEWALK PROJECT
foregoing, and all other provisions which may be required by law to be included in this
contract whether actually included or not.
Bid Security
Each bidder must submit with their bid a certified check, bid bond or cash in the amount
of 5% of their total bid price as their guarantee that the bidder will enter into the Contract,
if awarded. Said check, bid bond, or cash will be returned to all except the two (2) lowest
bidders immediately following the opening of bids, and the remaining sureties will be
returned after the Owner and Contractor have executed the Contract. If the Contract has
not been awarded within thirty (30) days of the bid opening the surety will be returned at
any time thereafter to any bidder who so requests, so long as they have not been notified
of the acceptance of their bid.
Withdrawal of Bids
The Owner may consider informal any bid not in accordance with the provisions hereof
and may waive any informalities in, or reject, any or all bids. Any bidder may withdraw
their bid prior to opening of the bids. Any bid received after the time and date specified
will not be considered. No bidder may withdraw their bid within 30 days after the actual
bid opening.
Bid Submitted
Bids must be submitted on the prescribed form and all blank spaces must be filled in, in
ink, in both words and figures. The price quoted in the bid shall be for the total project,
complete and shall include all labor, tools, materials, supplies, equipment, and all else
necessary for or incidental thereto.
Qualified Bidder
The Owner may make such investigations as he may deem necessary to determine the
ability of any bidder or bidders to perform the work, and the bidder(s) shall furnish to the
Owner all such information and data pertinent to this investigation as the Owner may
request. The Owner reserves the right to reject any bid after evidence submitted or
investigation of the bidder fails to satisfy the Owner that such bidder is properly qualified
to carry out the obligations of the Contract and to complete the work contemplated
therein. Conditional bids will not be accepted.
Basis of Award
The Contract will be awarded to the Contractor submitting the lowest bid. In the case
where the Contractor submitting the low bid is found to not be properly qualified to carry
out the work, then the Contract will be awarded to the lowest qualified bidder.
B-2
PROJECT: MeDOT UPI 29456.01 ODLIN ROAD SIDEWALK PROJECT
Bidder's Obligation
At the time of the opening of the bids it will be presumed that each bidder will have
inspected the site and will have thoroughly familiarized themself with the Contract
documents, including the plans, specifications, and any addenda which may have been
issued thereto. Failure of the bidder to receive and examine any form, instrument, or
document, or to visit and examine the site itself will not in any way relieve the successful
bidder from any obligation in respect to their bid or to the terms of this contract.
Bid Security Forfeited
Should the bidder to whom the Contract is awarded fail for any reason to execute the
Contract and to furnish a satisfactory bond within the time specified, the Owner may
determine that the bidder has abandoned the Contract, that their bid shall be considered
null and void and that the surety accompanying the bid shall be forfeited to and be
retained by the Owner as liquidated damages, and the Contract may be awarded to
another bidder. After the execution of the Contract and acceptance of the bond by the
Owner, the surety accompanying the successful bidder's bid shall be returned
Work Under City Engineer
All work under this project shall be under the direct supervision of the City Engineer and
all decisions by them pertaining to the new construction shall be final and binding. If
initial line and grade are requested by the Contractor, the engineering staff of the City of
Bangor will establish line or points with grades at no cost to the Contractor; however, it
shall be the responsibility of the Contractor to establish and maintain such additional
layout, including batter boards if so directed by the Engineer, as may be required to
properly complete the work.
No interpretation of the meaning of the plans, specifications or other Contract documents
will be made to any bidder orally. Every request for such interpretation must be in writing
and must be addressed to the Purchasing Department by email: bids@bangormaine.gov,
and to be given consideration must be received prior to the deadline for bidder questions.
Any and all such interpretations and any supplemental instructions will be posted to the
City's website at https://www.bangormaine.gov/Bids.aspx prior to the bid opening date.
Failure of any bidder to receive any addenda or interpretation will not relieve the bidder
of their obligation under the bid submitted. All addenda so issued will become an integral
part of the Contract documents.
The bidder is hereby notified that the construction terms and conditions set forth in the
Contract documents will be rigidly enforced, that it is the intention of the Owner to
maintain full time inspection during the period of construction, and that only first quality
materials and workmanship will be accepted. Neither the fact of such inspection, nor the
omission thereof, will imply acceptance by the Owner of any or all of the work performed
B-3
PROJECT: MeDOT UPI 29456.01 ODLIN ROAD SIDEWALK PROJECT
under this contract or relieve the Contractor of any responsibility for the successful
completion of all the terms of this Contract subject to final inspection and review by the
Owner.
The City of Bangor is a municipal corporation duly organized under the laws of the State
of Maine and therefore is not required to file proof of exemption to the Maine State sales
tax.
Time of Completion
All work shall be completed by October 31, 2026. After which time liquidated
damages will be assessed at $450.00 (dollars) a calendar day.
B-4
PROJECT: MeDOT UPI 29456.01.00 ODLIN ROAD SIDEWALK PROJECT
BID DATE -- 2:00 PM, JULY 1, 2026
SECTION C
BID FORM
To the City of Bangor, Maine, herein called the Owner, acting through its City Manager for
the construction of the Odlin Road Sidewalk Project , together with all related work specified in
the specifications, and any other work necessary or incidental thereto.
The undersigned, as Bidder, declares that the only parties interested in the bid as principals
are named herein; that this bid is made without collusion with any other person, firm, or
corporation; that no officer or agent of the Owner is directly or indirectly interested in this bid; that
they have carefully examined the location of the proposed work, the annexed form of contract, and
the plans and specifications therein referred to and they propose and agree that if this bid is accepted
they will contract with the Owner, in the form of the copy of the Contract Agreement deposited in
the office of the Engineer and attached hereto, to provide all necessary machinery, tools, apparatus,
and other means of construction and to do all the work and furnish all the materials specified in this
contract in the manner and time therein prescribed, and according to the requirements of the
Engineer as therein set forth and that they will take in full payment for the work thereof the
following unit prices.
Item Estimated MDOT Pay Item No., Brief Description;
No. Quantity Unit or Lump Sum Price Bid Total Price
In Both Words and Figures In Figures
1. 167 202.203 Pavement Butt Joints
SY Unit Price per Square Yard of
_____________________________________Dollars
per square yard ($__________)/SY $___________
2. 510 203.20 Common Excavation
CY Unit Price per Cubic Yard of
_____________________________________Dollars
per cubic yard ($__________)/CY $___________
C-1
PROJECT: MeDOT UPI 29456.01.00 ODLIN ROAD SIDEWALK PROJECT
BID DATE -- 2:00 PM, JULY 1, 2026
Item Estimated MDOT Pay Item No., Brief Description;
No. Quantity Unit or Lump Sum Price Bid Total Price
In Both Words and Figures In Figures
3. 220 203.240 Common Borrow
CY Unit Price per Cubic Yard of
_____________________________________Dollars
per cubic yard ($__________)/CY $___________
4. 460 304.10 Aggregate Base Course - 2" Minus Gravel
CY Unit Price per Cubic Yard of
_____________________________________Dollars
per cubic yard ($__________)/CY $___________
5. 270 403.209 3/8" (9.5mm) Hot Mix Asphalt (Sidewalks,
TON Drives, Incidentals) Unit Price per Ton of
_____________________________________Dollars
per ton ($__________)/TON $___________
6. 156 603.15 12" Storm Drain/ Culvert
LF Unit Price per Linear Foot of
_____________________________________Dollars
per linear foot ($__________)/LF $___________
7. 40 603.16 15" Storm Drain/ Culvert
LF Unit Price per Linear Foot of
_____________________________________Dollars
per linear foot ($__________)/LF $___________
C-2
PROJECT: MeDOT UPI 29456.01.00 ODLIN ROAD SIDEWALK PROJECT
BID DATE -- 2:00 PM, JULY 1, 2026
Item Estimated MDOT Pay Item No., Brief Description;
No. Quantity Unit or Lump Sum Price Bid Total Price
In Both Words and Figures In Figures
8. 1 604.092 Catch Basin Type B1-C
EA Unit Price per Each of
_____________________________________Dollars
per each ($__________)/EA $___________
9. 1 604.242 Catch Basin Type F
EA Unit Price per Each of
_____________________________________Dollars
per each ($__________)/EA $___________
10. 120 608.26 Detectable Warning Field(SW Ramps)
SF Unit Price per Square Foot of
_____________________________________Dollars
per square foot ($__________)/SF $___________
11. 750 609.19 Slipform Curb - Conc.
LF Unit Price per Linear Foot of
_____________________________________Dollars
per linear foot ($__________)/LF $___________
12. 486 609.38 Vert. Granite Curb - Rem. & Reset
LF Unit Price per Linear Foot of
_____________________________________Dollars
per linear foot ($__________)/LF $___________
C-3
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
RFP 052027 Description Location: Pine Point Co-op, Scarborough River, Scarborough, Maine Environment: Saltwater,
Town of Scarborough, Maine
Bid Due: 8/20/2026
Bid Number: 04-27 Bid Title: Mahoney City Center Project Category: All Bids Status:
City of South Portland
Bid Due: 8/17/2026
Bid Number: 02-27 Bid Title: Broadway Pedestrian Improvements WIN 027356.00 Category: All Bids
City of South Portland
Bid Due: 8/20/2026
Bid Number: P26-20 Bid Title: Cumberland St, Sewer Separation and Water Main Replacement
City of Bangor
Bid Due: 5/13/2027