Bid #: ME-038-23
Date Posted: Thursday, Apr 16, 2026
Date Due: Wednesday, Apr 22, 2026
Time of bid opening: 11:00am
Scope of Work : Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, includingall footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents.
Please Click for File Attachment
It is the responsibility of the BIDDER to check for, download and to include with their BID RESPONSE any and all ADDENDUMS that are issued for a specific BID issued by the City of Mobile. Failure to download and include ADDENDUM(s) in your BID RESPONSE may cause your bid to be rejected. This is a sealed bid. Any responses faxed or e-mailed will be rejected. This is a sealed bid. All responses must be submitted in a sealed envelope with the bid number on the outside of the envelope with the bid opening date. Any response that arrives improperly marked or with no bid number and opening date on the outside of the delivery or express package and opened in error will be rejected and not considered. It is the responsibility of the bidder to insure that their bid response is delivered to and received in the at the location or address specifically directed in the specification by the date and time prescribed.
CITY OF MOBILE - MUNICIPAL ENFORCEMENT DEPARTMENT
REQUEST FOR QUOTE
DATE: April 16, 2026
The City of Mobile will receive quotes for the following Project:
Project Name: NUISANCE ABATEMENT - DEMOLITION OF STRUCTURES
Project Locations: 1861 LA SALLE STREET, MOBILE, ALABAMA 36606 _ME-038-23
Scope of Work: Provide a wet demolition & REMOVE ALL STRUCTURES at the address
indicated above, and as described in the attached photos and general notes provided, including
all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary
sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile,
Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting
from the demolition of structures and all debris as designated in piles, scattered or otherwise on
the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best
Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing
Materials may be present, per specifications. Submit before and after demolition pictures to City
of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for
payment and required close-out documents.
The following are included in the scope of work:
EXHIBITAA: SPECIAL PROVISIONS FOR EROSION AND SEDIMENT CONTROL ON
DEMOLITION SITES
EXHIBITBB: BEST MANAGEMENT PRACTICES FOR DEMOLITIONS WHERE LEAD-BASED
PAINT AND/OR ASBESTOS CONTAINING MATERIALS MAY BE PRESENT
PROJECT PHOTO, LEGAL DESCRIPTION, GENERAL NOTES AND MAP
SECTION: 00100 INSTRUCTIONS FOR QUOTES
SECTION: 02100 DEMOLITION BY WET METHOD
SECTION: 02921 SEEDING
EXHIBIT 1: E-VERIFY (Sample document)
EXHIBIT 2: AGREEMENT BETWEEN OWNER AND CONTRACTOR FORA
STIPULATED SUM (Sample document)
EXHIBIT 3: CITY OF MOBILE INSURANCE AND ENDORSEMENT REQUIREMENTS
e EXHIBIT 4: APPLICATION AND CERTIFICATION FOR PAYMENT AND
CONTINUATION SHEET G702 AND G703 (Sample documents)
e EXHIBIT 5: CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS
G706 (Sample document)
CONTRACTOR'S AFFIDAVIT OF RELEASE OF LIENS - G706 A (Sample document)
Quotes (stipulated sum) for the above Scope of Work will be received until 11:00 AM on the 22nd
day of April 2026, in the City of Mobile, Municipal Enforcement Department, 4851 Museum
Drive (P.O. Box 1827, Mobile, Alabama 36633). Quotes shall be submitted in a "Sealed
Envelope" to the address indicated. Quotes will be reviewed in the City of Mobile
Nuisance Abatement-Demolition
1861 LA SALLE STREET, ME-038-23
Municipal Enforcement following the time established for receipt of Quotes. Contact the Deputy
Director for additional instructions. A City of Mobile Business License is required and must be
current at contract execution and throughout contract period. The Contractor shall secure building
and other permits customarily obtained from City of Mobile Departments, but at no cost to the
contractor.
Within two (2) calendar days from the issuance of Contract forms for execution, the
Contractor must provide the following:
A. Proof of enrollment in the Federal E-Verify program (see sample document attached as
Exhibit 1)
2 Agreement Between Owner and Contractor For A Stipulated Sum (see sample attached
as Exhibit 2)
3. Certificate of Insurance and policy endorsements in accordance with City of
Mobile Insurance Requirements (attached as Exhibit 3 with sample documents)
For payment(s), two (2) signed and notarized originals of the Application and Certificate for
Payment shall be submitted on AIA Documents G702 and G703. (Attached as Exhibit 4)
At Substantial Completion of the project, the Contractor shall publish a "Notice of Final
Completion" of the contract one time in a newspaper of general circulation, published in Mobile
County. Contractor shall provide an electronic or hard copy of the Notice verbiage, on Contractor
letterhead, to the Deputy Director at the same time the Notice is submitted to the newspaper.
Within five working days after publication, the Contractor shall provide an original proof of
newspaper publication to the Deputy Director. Final settlement shall not be made until Notice has
been published and all applicable Close Out documents have been received and approved.
e Close Out documents shall also include original executed copies of the following AIA
Documents: (Attached as Exhibit 5)
Affidavit of Payment of Debts and Claims G706
Contractor's Affidavit of Release of Liens G706A
Before and after Photos of the demolition Structure
Before and after Photos of capped Sewage Lines
Photos verifying Wet Demolition method was used
The Work shall commence with permitting through Build-Mobile within three (3) business days of
the date of a written Notice to Proceed. The Contractor shall deliver All Work, proof of
Advertisement, Close-out documents and Invoices for completed Work within thirty (30) calendar
days from the date of the written Notice to Proceed. Contractor shall contact the Municipal
Enforcement Deputy Director for any unforeseen delays immediately. Failure to do so will
result in Letter of Termination of Work and Liquidated Damages beginning at day forty-five
(45) from the Notice to Proceed.
A time charge equal to two hundred fifty dollars ($250.00) per calendar day will be made against
the Contractor for the entire period that any part of the Work remains uncompleted for more than
fifteen (15) calendar days after the time specified for the Substantial Completion of the Work, the
amount of which shall be deducted by the Owner, and shall be retained by the Owner out of
monies otherwise due the Contractor in the final payment, not as a penalty, but as liquidated
damages sustained.
Nuisance Abatement-Demolition
1861 LA SALLE STREET, ME-038-23
Contact the Deputy Director, Gary Jackson, at the City of Mobile, Municipal Enforcement
Department, 251.208.1540 phone or e-mail gary.jackson@cityofmobile.org for further
clarification regarding this Request for Quotes.
QUOTE FORM:
Company Name:
Company Address:
Office Phone #: Fax #:
City of Mobile Business License No.:
Hereby proposes to furnish all labor, materials, tools, equipment and supplies and to sustain all expenses
incurred in performing the Scope of Work for the amount listed below. Contractor acknowledges receipt of
Addendum No(s). and dated 2
The Contractor shall deliver the Work complete within thirty (30) calendar days from the date of
the written Notice to Proceed.
* Quote shall include all applicable sales and use taxes.
Quote shall be provided in whole dollar amount with no cents.
1861 LA SALLE STREET - Total Quote Amount:
Amount in Words
($ ..00 )
Amount in #'s
By signing this contract, represents and agrees that
it is not currently engaged in, nor will it engage in, any boycott of a person or entity based
in or doing business with a jurisdiction with which the State of Alabama can enjoy open
trade.
Contact Name:
Contact Phone #: Cell #:
E-mail Address:
Signature: Date:
Printed Name: Title:
Nuisance Abatement-Demolition
1861 LA SALLE STREET, ME-038-23
EXHIBIT - AA
SPECIAL PROVISIONS FOR EROSION AND SEDIMENT CONTROL ON DEMOLITION SITES
All demolition activities for City of Mobile projects shall be in accordance with the Clean Water Act;
the Alabama Water Pollution Control act; the current version of the Alabama Handbook for Erosion
Control, Sediment Contro! and Stormwater Management.on Construction Sites and Urban Areas;
and the current version of the Mobile, Alabama City Code, Chapter 17, Stormwater Management
and Flood Control.
The Contractor shall be responsible for providing, implementing and maintaining temporary "Best
Management Practices" (BMP's) in full compliance with all applicable Local, State and Federal
Codes and Ordinances throughout the demolition/restoration period.
BMP's shall include, but are not limited to, installation and maintenance of proper silt fencing,
berms or other containment devices required to prevent all sediment, demolition debris and trash
from leaving the site, protection of all storm drains and storm water inlets both on site and within
the City right-of-way, installation and maintenance of exit pads, and proper dust control as a result
of demolition related activities. The Contractor shall be responsible for inspecting BMP's and
making repairs/adjustments to the methods and types of erosion control utilized as necessary
during the course of the construction.
The Contractor shall also be responsible for providing and installing permanent site stabilization
prior to leaving the site and completion of the demolition contract. All costs for erosion and
sediment control, including the costs for providing and maintaining temporary BMP's and for
permanent site stabilization, shall be included in the Contractor's Quote. Contractor personnel
must receive Erosion and Sediment Control training at an ADEM authorized training event. Any
applicable training costs shall be the responsibility of the Contractor.
Any fines, penalties, or judgments assessed to City of Mobile, its agents or representatives due to
inadequately installed or maintained erosion controls shall be the responsibility of the
Contractor. A Qualified Credentialed Inspector with the City of Mobile shall review on-site
methods of erosion control, however, the Contractor shall indemnify and hold harmless the City of
Mobile Municipal Enforcement Department and its agents or representatives from all claims
resulting, all or in part, from inadequately installed or maintained erosion control.
EROSION CONTROL NOTES:
1. All erosion control measure is to be in accordance with the Alabama Handbook for
Erosion Control, Sediment Control, and Storm water Management on Construction Sites and
Urban Areas (latest edition), and shall be maintained at all times during construction activities.
2. The erosion contro! measures indicated are a required minimum. The Contractor shall be
responsible for the prevention of sediment transport from this property in accordance with all
Federal, State, and Local Regulations during construction. The Contractor shall install
additional devices and implement additional practices if warranted by field conditions. Prior to
construction activities, the Contractor shall install all silt fencing and sediment traps and
sediment basins, as required. The Contractor's site superintendent shall daily inspect and
maintain all erosion control devices and practices. The Contractor shall initiate permanent
stabilization measures immediately.
Nuisance Abatement-Demolition
1861 LA SALLE STREET, ME-038-23
3. All temporary stabilization measures shall be initiated immediately when work for any portion
of the site has temporarily ceased and will not resume for a period exceeding 13 days.
4. All disturbed areas not encompassed by structures, pavement or called out for other surface
treatment shall be, at a minimum, top soiled, seeded and mulched in accordance with the
specifications. The Contractor shall be responsible for the removal of all erosion control
measures except channel lining and outlet protection after site stabilization. The Contractor
shall be responsible for removing and/or flushing sediment from existing storm drains if an
excessive amount is collected during construction activities. Remove accumulated sediment
as soon as depth reaches % the height of the barrier.
DUST CONTROL:
The Contractor shall be responsible for the prevention of wind-borne sediment from leaving the
property. The Contractor shall sprinkle water on bare soil areas as required to wet the surface.
The Contractor shall adjust the frequency of these sprinklings to match field conditions.
EROSION CONTROL BEST MANAGEMENT PRACTICES (BMP'S):
1. The Contractor shall utilize erosion control best management practices (BMP'S) to prevent the
discharge of sediment-bearing water runoff or airborne dust from the project site in accordance
with all Federal, State and Local Regulations during demolition.
2. The Contractor shall be responsible for the inspection and maintenance of all BMP'S in
accordance with the requirements of the permitting authority.
3. The Contractor shall ensure that all down slope BMP'S are installed and functional before any
land disturbing activity is commenced on any portion of the site.
4. The Contractor shall be responsible for the installation and maintenance of additional BMP'S if
required by field conditions, the Architect/Engineer or a Permitting Authority having jurisdiction
over the site.
SILT FENCE:
1. The installation of silt fences shall be in conformance with the silt fence manufacturer's
recommendations; particular care shall be exercised to ensure that all silt fencing is properly
keyed into the earth at the toe.
2. The Contractor shall maintain, clean, repair or replace silt fence as may be required during the
construction period. If a line of silt fencing exceeds its capacity to function properly and the
need for a back-up fence becomes evident, the Contractor shall install a secondary line of silt
fence at the affected areas as required and per direction of the Architect/Engineer. Failure to
maintain a silt fence shall not be cause for the Contractor to claim additional compensation.
3. After stabilization of the disturbed area has been achieved, the Contractor shall remove and
dispose of all temporary BMP'S and dress out those areas to the proper line and grade.
Nuisance Abatement-Demolition
1861 LA SALLE STREET, ME-038-23
EXHIBIT- BB
BEST MANAGEMENT PRACTICES FOR DEMOLITIONS WHERE LEAD-BASED PAINT
ANDI/OR ASBESTOS CONTAINING MATERIALS MAY BE PRESENT
GENERAL NOTES: DISPOSAL OF LEAD-BASED PAINT (LBP) AND ASBESTOS
CONTAINING MATERIAL (ACM)
All demolition must be adequately wet prior to and during removal to prevent any and all
lead-base dust. Adequately wet means: no visible emission discharges are released to the
outside air from the collection, mixing, wetting and handling operations.
Disposal cost for Lead-Based Paint containing materials and Asbestos containing materials
shall be included in the bid and made a part of the contract executed with the company
providing demolition.
All LBP and/or ACM wastes generated must be disposed of at a permitted landfill.
The demolition contractor shall abide by the Lead-Based Paint and/or Asbestos NESHAP
requirements for the disposal of lead-based paint and/or asbestos-containing wastes.
Not all landfills are authorized to accept LBP and/or ACM. The demolition contractor is
strongly urged to contact the landfill prior to transport of LBP and/or ACM to ensure that the
landfill will accept the LBP and/or ACM.
1. The name, address and telephone number of the waste transporter(s); and
2. Certification that the contents of the consignment are fully and accurately described by
proper shipping name and are classified, packed, marked, and labeled, and are in all
respects in proper condition for transport by highway according to applicable
international.and government regulations.
A copy of this waste shipment record must be provided to the disposal site owner at the
time the lead-based paint and or asbestos-containing material is delivered.
A copy of this waste shipment record, signed by the disposal site owner or operator must
be included with application and certification for payment.
A listing of permitted landfills in the State of Alabama is available on the ADEM Internet
web site at: www.adem.state.al.us/LandDivision/Solid Waste/Reports/Landfill.htm
A detailed schedule of values will be required from the apparent low quoter contractor and
shall be submitted within twenty-four (24) hours. of receipt of quotes
1861 LA SALLE STREET
Project Number: ME-038-23
LEGAL DESCRIPTION: 29-10-28-2-001-088
GENERAL NOTES:
REMOVE DAMAGED WOOD FRAME STRUCTURES
FIELD VERIFY ALL SITE CONDITIONS
REMOVE CMU/BRICK PIERS AND OR CONCRETE SLAB(S) FIELD VERIFY
REMOVE ALL TIRES, TRASH, ROOF REMNANTS, GARBAGE, ETC. OFF SITE
ALUMINUM FENCE SHALL REMAIN
REMOVE ALL VINES, BUSHES, SHRUBS ALONG THE ENTIRE PERIMETER AND CUT
TREES WITH A CALIPER OF 8" OR LESS 4" ABOVE GRADE WITHIN THE PROPERTY
LINES/FENCE LINE.
7. CLEAR ENTIRE LOT, REMOVE ALL TRASH/GARBAGE, CUT ALL GRASS/WEEDS UP
TO PROPERTY LINES.
8 CONTRACTOR SHALL FILL ALL VOIDS OF DISTURBED AREAS PER SECTION 02100
DEMOLITIONS BY WET METHOD AND SECTION 02100 SEEDING.
Se ne
PACKETS ALSO INCLUDES A
PHOTO OF THE STRUCTURE (FIELD
VERIFY)
REQUEST FOR QUOTE 1861 LA SALLE STREET
7. ae
5
rf
Fi
$
2
268 5 1914 t999 1907
270
275
)
1/15/2026, 2:14:08 PM
Address
Parcel Details
1861 La Salle St
1806
1808
UASALLE ST
=
i
>
FA
ww |i
z 859 1855 ig53 1851 1849 4811 1809 4807
452
454
457
456
1812
lass 1860 5g 1854 1814 1810 1808 1806
1:1,464
(A) 0 0.01 0.02 0.04 mi
0 0.01 0.03 0.06 km
City of Mobile GES
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.