| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | West Virginia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jun 5, 2026 |
| Due Date: | Jun 18, 2026 |
| Solicitation No: | 12FPC326B0011 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Please see Attachment 1 Specifications documents for full details of services requried.
USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run
A site visit will be held on date May 28th, 2026 at 10:00am ET on that day.
Attendees will meet at: Valley Grove Community Center
8566 National Road
Valley Grove, WV 26060
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.
*See Specifications document attached to posting for full details of required work.
| May 18, 2026 | [Combined Synopsis/Solicitation (Original)] NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run |
| May 19, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run |
| Jun 18, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description: West Fork (Two Licks Rd) New Public Access Site Department: DIVISION OF
State of West Virginia
Bid Due: 6/25/2026
Description: Administration of Public Transit Department: WV DIVISION OF MULTIMODAL TRANSPORTATION FACILITIES Buyer:
State of West Virginia
Bid Due: 7/15/2026
Description: AML - Wilkinson (Belcher) Drainage Phase II Department: DEPARTMENT OF ENVIRONMENTAL PROTECTION
State of West Virginia
Bid Due: 7/21/2026
Description: Demolition and New Construction Concrete Block Wall Department: DEPARTMENT OF AGRICULTURE Buyer:
State of West Virginia
Bid Due: 6/23/2026