| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Massachusetts |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 19, 2026 |
| Due Date: | Jun 19, 2026 |
| Solicitation No: | 12FPC326B0012 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Please see Attachment 1 Specificaitons document for further details.
Tyler Dam Rehabilitation Worchester County, MA
Site Showing on:
Wednesday, May 27ᵗʰ at 10:00 AM at the site
200 Robin Hill Street
Marlborough, MA 01752
The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream
of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street
intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
| May 20, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam |
| Jun 11, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam |
| Jun 25, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Header Information Bid Number: BD-26-1257-DEP14-DEP14-131296 Description: Renovations to the Dartmouth DCTV Bid Opening
Commonwealth of Massachusetts
Bid Due: 8/13/2026
Follow Replace greenhouse lighting Active Contract Opportunity Notice ID 12639526Q0206 Related Notice Department/Ind.
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/11/2026
Project ID: Title: FY27 Specialized Sidewalk Improvements Addenda: 0 Release Date: 7/23/2026 Due
City of Cambridge
Bid Due: 8/13/2026
Bid Solicitation: BD-25-1026-DOE02-DOE01-112189 Responses Due in 1427 Days, 14 Hours, 52 Minutes Header
Commonwealth of Massachusetts
Bid Due: 12/29/2028