NOTICE REQUEST FOR FORMAL WRITTEN PROPOSAL AND SPECIFICATIONS FOR?SAINT PETER COMMUNITY CENTER ELECTRICAL INFRASTRUCTURE AND TRANSFER SWITCH REPLACEMENT

Agency: St. Peter city
State: Minnesota
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • 541330 - Engineering Services
Posted Date: Sep 15, 2025
Due Date: Sep 22, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

NOTICE REQUEST FOR FORMAL WRITTEN PROPOSAL AND SPECIFICATIONS
FOR SAINT PETER COMMUNITY CENTER ELECTRICAL INFRASTRUCTURE AND
TRANSFER SWITCH REPLACEMENT

NOTICE IS HEREBY GIVEN that formal written proposals for the electrical infrastructure and automatic transfer switch (ATS) system replacement at the Saint Peter Community Center and Library will be accepted until 10:00 A.M. Monday, September 22, 2025, at which time they will be opened at the Saint Peter City Hall, 227 South Front Street, Saint Peter, Minnesota 56082.

A pre-bid walkthrough of the facility with City Facilities Maintenance staff and ISG Electrical Engineers will be held on September 11 @ 11:30 a.m. at the Saint Peter Community Center. Interested contractors are strongly encouraged to attend. Contact Eric Borseth, Facilities Maintenance Supervisor, at 507-351-7942 to RSVP or for additional details.

The Contractor shall supply, install, and commission a new closed-transition automatic transfer switch system, consolidating the existing three open transfer switches. The scope includes reconfiguring electrical feeds for the Community Center, Library, and Chiller; removing all existing outdated ATS units; installing a new emergency systems transfer switch; providing new service equipment, including a generator docking station; updating electrical wiring for the building as needed; and installing submetering equipment for energy tracking. The Contractor will obtain all required permits, ensure full compliance with applicable codes, and coordinate system integration with the existing generator in accordance with the detailed specifications.

Contractor personnel must comply with OSHA standards, including wearing all required safety equipment. All procedures and equipment shall comply with the latest NEC and OSHA safety regulations.

The full request and specifications can be viewed here .

ADDENDUM
Contractor to provide a conduit and wire from generator to building management system. Control signal shall be a start/run from generator controller. Management system programming by owner.

Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Event Name: DNR RFB Kroschel Parking Lot Construction Business Unit: Natural Resources Department

State Government of Minnesota

Due by 9/22/2026

26-99654 Norton Park Playground, Accessibility and Site Improvements (due 10/6) 26 99654 Invitation

City of Duluth

Due by 10/06/2026

division number title/general description issue date due date type Transit 26P120 NEW Fan

Metropolitan Council

Due by 10/15/2026

Post Date 09/16/2026 Quest Number 10358904 Category Code Elevated - Ground Storage Tanks,Paint

City of Mankato

Due by 10/15/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.