North Charleston, SC - CHS Terminal Annex Roof Replacement

Agency: Charleston County International Airport
State: South Carolina
Type of Government: State & Local
NAICS Category:
  • 238160 - Roofing Contractors
Posted Date: Jan 12, 2026
Due Date: Feb 26, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
North Charleston, SC - CHS Terminal Annex Roof Replacement
Charleston Regional Aviation Authority will receive sealed bids for furnishing all labor materials, and equipment and performing all work for the CHS Terminal Annex Roof Replacement at the Charleston International Airport in North Charleston, SC. Base Bid includes the complete removal down to the metal deck and replacement of Annex Roof Area A for approximately 832 squares using a mechanically fastened thermoplastic roof system. Also included are miscellaneous deck repairs, roof carpentry, insultation with taper, coverboard, sheet metal adhering to ES-1 and sealants. Alternate Number 1 work includes the same scope as Base Bid for Annex Roof Area C for approximately 17 squares. Alternate Number 2 work includes the complete removal down to the deck and replacement of Fuel Farm Roof Area for approximately 19 squares using a granular surfaced two-ply modified bitumen roof system. Also included are miscellaneous deck repairs, roof carpentry, insulation with taper, coverboard, sheet metal adhering to ES-1 and sealants. Rebuilding parapet top with rough carpentry.
StatusAccepting Bids
Prebid Date 1/27/26 10:00am
Bid Date 2/26/26 2:00pm
Company & Contacts
Charleston Regional Aviation Authority
Carrie Stanley
Location

North Charleston, SC

Any questions and/or comments concerning this Request for Proposal should be directed in writing and delivered via email to Carrie Stanley , Procurement Department at ccaaprocurement@iflychs.com . The Charleston Regional Aviation Authority will not be responsible for any oral instructions with regard to this notice.

A MANDATORY Pre-Bid Conference will be held on at the above listed date and time. Offerors may choose to attend in person at the offices of the Charleston Regional Aviation Authority, 5500 International Blvd, Main Terminal – 3rd floor, North Charleston, SC 29418 or by contacting Carrie Stanley at ccaaprocurement@iflychs.com no later than 24-hours in advance of the scheduled time for teleconference instruction. Firms interested in subcontracting opportunities are invited to attend.

All materials provided by the awarded Contractor must be new, free from defects and must meet CRAA’s specifications. Bidder shall submit the make and model of materials that will be used for the work. After award of contract, no change to materials and products, except when the lack of availability is beyond the Contractor’s control, i.e., due to strike bankruptcy, discontinuance of manufacture, etc. Requests for substitutions shall be made in writing and shall be accompanied by complete description of the substituted material or equipment. Substitution requests must receive written approval from Owner prior to being ordered and installed.

Awarded Contractor shall work with manufacturer of any products installed to ensure that all recommended procedure requirements are adhered to during installation and test to ensure the installation will be valid for manufacturer warranty.

Awarded Contractor shall inspect all products and materials prior to installation. Damaged or nonconforming products and materials shall not be installed.

All Awarded Contractor personnel and subcontractors who will be performing work on this project shall have been trained in the work they will be performing. They shall have been trained on the awarded Contractor’s company policies with respect to safety, quality, and neatness standards.

All fixtures and hardware must be installed per manufacturer’s specifications and in direct coordination with Owner. The Awarded Contractor shall be held financially responsible for any work or re-work required due to improper approval and/or acceptance of that work performed which differs from the construction documents.

CONTRACT TIME Project is to be substantially complete within 200 consecutive calendar days from the commencement date specified in the written Notice to Proceed and achieve Final Completion within 230 consecutive calendar days.

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Repair Maintenance Hangar Facility Building 253 PSTE 172022 Active Contract Opportunity Notice

DEPT OF DEFENSE

Project Name: Walker and Fleming Street Sewer Replacement Agency/Owner: Town of Ware Shoals

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/18/2026

Project Name: Snow Hill Water Project (Division 4 - SCADA) Agency/Owner: Town of

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/25/2026

Follow Z--Provide Replacement of Heating, Ventilation, & Air Active Contract Opportunity Notice ID

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/15/2026