Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Virginia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jun 5, 2025 |
| Due Date: | Jun 19, 2025 |
| Solicitation No: | W9123625S13MA |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Jun 05, 2025 11:04 am EDT
- Original Response Date: Jun 19, 2025 02:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Aug 15, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1KA - CONSTRUCTION OF DAMS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Norfolk , VA 23510USA
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB).
This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer.
See attached document for addiitional information.
- KO CONTRACTING OFFICE 803 FRONT STREET
- NORFOLK , VA 23510-1096
- USA
- Raven D. Sasser
- raven.d.sasser@usace.army.mil
- Phone Number 7572017136
- Candace Lotomau
- candace.c.lotomau@usace.army.mil
- Phone Number 7572017131
- Jun 05, 2025 11:04 am EDTSources Sought (Original)
See Also
IFB27000102 |MEADOWDALE BOULEVARD BIKE-PED IMPROVEMENTS PROJECT Addendum issued on 10/16/2026 was for clarification
Cesterfield Country
Due by 12/03/2026
Project ID: 23192RB Title: Virginia Beach Blvd Over NS RR Bridge Rehabilitation Addenda:
City of Norfolk
Due by 11/16/2026
Follow Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF
IFB NG00004: Route 15 North Widening: Battlefield ... Status: Open IFB 129928 County
State Government of Virginia
Due by 11/20/2026