NM FS SNTFE310 263(1) Gallinas Canyon Road
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | New Mexico |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Aug 18, 2026 |
| Due Date: | Sep 3, 2026 |
| Solicitation No: | 6982AF26Q000019 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Aug 18, 2026 03:43 pm MDT
- Original Date Offers Due: Sep 03, 2026 02:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Sep 18, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: B519 - SPECIAL STUDIES/ANALYSIS- GEOTECHNICAL
-
NAICS Code:
- 541380 - Testing Laboratories and Services
-
Place of Performance:
NM 87731USA
This RFQ is for geotechnical borings associated with the design and construction of Gallinas Canyon Road. The geotechnical investigation will gather subsurface data to inform the 30% project design and cost estimate. The program includes nineteen (19) planned boreholes. These boreholes fall into two categories: corridor characterization and bridge investigation.
Project Locations and Descriptions: The Federal Highway Administration (FHWA), Central Federal Lands Highway Division, and the Forest Service are partnering to reconstruct a portion of FR 263, Gallinas Canyon Road. This reconstruction project includes roadway resurfacing, widening, and realignment. The realignment incorporates options for several bridge replacements and rock cuts.
Gallinas Canyon lies within San Miguel County, NM. The project alignment begins at Burro Basin Trailhead and proceeds East for approximately 6 miles to the intersection of FR 263 and FR 156. The existing alignment consists of a narrow, winding road that crosses 15 bridges.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Eric Grosskreuz
- CFLcontracts@dot.gov
- Kelly Palmer
- CFLcontracts@dot.gov
- Aug 18, 2026 03:43 pm MDTCombined Synopsis/Solicitation (Original)
Related Document
| Aug 27, 2026 | [Combined Synopsis/Solicitation (Updated)] NM FS SNTFE310 263(1) Gallinas Canyon Road |
| Sep 10, 2026 | [Combined Synopsis/Solicitation (Updated)] NM FS SNTFE310 263(1) Gallinas Canyon Road |
See Also
Preliminary Evaluation Report for the Ditch Canyon Dam and Reservoir for San Juan
San Juan County
Due by 10/01/2026
RFP #2027-002P Development of Village of Ruidoso Owned Properties Including but Not Limited
Village of Ruidoso
Due by 9/17/2026
Seismic Data Acquisition Services Seismic Data Acquisition Services Open: 8/26/2026, 8:00 AM MDT
New Mexico State University
Due by 9/25/2026