NM BR AAO ELBU(1) Elephant Butte Historic Roads
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | New Mexico |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) |
| Posted Date: | Oct 21, 2024 |
| Due Date: | |
| Solicitation No: | 6982AF24B000011 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Oct 21, 2024 12:09 pm EDT
- Original Response Date:
- Inactive Policy: Manual
- Original Inactive Date: Nov 04, 2024
-
Initiative:
- None
- Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Elephant Butte , NMUSA
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
PROJECT NUMBER: NM BR AAO ELBU(1)
PROJECT NAME: Elephant Butte Historic Roads
PROJECT LOCATION:
The Elephant Butte Dam approximately 4 miles east of Truth or Consequences, New Mexico, in Sierra County. The Elephant Butte Lake State Park which is managed by NM State Parks under a lease agreement with the U.S. Bureau of Reclamation. The project is located at the southern end of the Elephant Butte Reservoir and includes the Damsite area and Paseo del Rio. The Damsite area includes visitor amenities, a day use area, camping, casitas, and houses to rent. Paseo del Rio offers campsites, river access, hiking and biking trails, and historic information boards. Roads within the historic district also provide access to the largest marina at Elephant Butte Reservoir.
SCOPE OF THE WORK:
The project will use asphalt and aggregate base to resurface, restore, and rehabilitate multiple road segments within the Elephant Butte Historic District including: Dam Site Winding Road A/B, Ruins Road, Hospital Canyon Road A/B, Dam Site Entrance Road, unpaved Dam Site Marina Entrance Road, and Paseo Del Rio Campground Access Road.
The Paseo Del Rio River Access Road has native surfacing but will be improved with aggregate surfacing. 6 paved parking lots will be rehabilitated and repaved. 4 additional gravel/native/paved parking lots will be rehabilitated with aggregate surfacing.
This project is separated into a base Schedule A, along with two alternates, Option X and Y, to maximize the work that can be completed with the available funds.
Schedule A Includes:
Hospital Canyon Road A and B
Dam Site Entrance Road
Winding Road and Approach Roads
Paseo Del Rio Campground Access Road and Approach Roads
Dam Site Upper East and Upper West Parking
Dam Site Recreation Area Restaurant parking and Overflow Parking
Paseo Del Rio Recreation Area Highway 51 River Access Parking
Paseo Del Rio Recreation Area Campground Comfort Station Parking
Old Fish Hatchery Parking
Winding Road Parking
Option X includes:
Ruins Road
Option Y includes:
Dam Site Marina Entrance Road (concrete)
Dam Site Marina Entrance Road (unpaved)
Dam Site Marina South Parking
PRINCIPAL WORK ITEMS:
Schedule A
8,500 Cuyd Roadway Excavation
8,000 Cuyd of Waste
21,800 Sqyd Seeding and Mulching each
1 LPSM of temporary traffic control
Option X
4,000 Sqyd Prime Coat, Method 1
4,730 Ton, Aggregate Base
4,200 Sqyd Seeding and Mulching each
Option Y
3,000 Cuyd Roadway Excavation
3,000 Cuyd of Waste
4,000 Tons of Roadway Aggregate, Method 2, Surface
4,000 Sqyd of Prime Coat, Method 1
6,000 Sqyd Seeding and Mulching each
1 LPSM of temporary traffic control
DISCLOSURE OF MAGNITUDE: The estimated price range is between $7,000,000 and $10,000,000.
This is set-aside for HUBZone small business concerns.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Douglas Whitcomb
- CFLAcquisitions@dot.gov
- Ryan Phillips
- cflacquisitions@dot.gov
- Oct 21, 2024 12:09 pm EDTPresolicitation (Original)
- Feb 29, 2024 11:55 pm EST Sources Sought (Original)
Related Document
| Jan 10, 2025 | [Solicitation (Original)] NM BR AAO ELBU(1) Elephant Butte Historic Roads |
| Feb 4, 2025 | [Solicitation (Updated)] NM BR AAO ELBU(1) Elephant Butte Historic Roads |
| Feb 6, 2025 | [Solicitation (Updated)] NM BR AAO ELBU(1) Elephant Butte Historic Roads |
| Feb 10, 2025 | [Solicitation (Updated)] NM BR AAO ELBU(1) Elephant Butte Historic Roads |
| Feb 19, 2025 | [Solicitation (Updated)] NM BR AAO ELBU(1) Elephant Butte Historic Roads |
| Feb 20, 2025 | [Solicitation (Updated)] NM BR AAO ELBU(1) Elephant Butte Historic Roads |
See Also
Follow USBP ITC Construction FLETC Artesia Active Contract Opportunity Notice ID 70LART26RPFB00003 Related
HOMELAND SECURITY, DEPARTMENT OF
Due by 10/21/2026
Project ID: Title: Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades Addenda:
City of Santa Fe
Due by 9/29/2026
Follow Y--Hickman Wildlife Water Catchment and Pipe Fence Active Contract Opportunity Notice ID
INTERIOR, DEPARTMENT OF THE
Due by 10/22/2026
Follow New Mexico Forest Engineering and Road Maintenance (FERM) Active Contract Opportunity Notice
AGRICULTURE, DEPARTMENT OF
Due by 1/31/2028