NIST Boulder Galvanized Steel Stair Installation – Building 2 Mechanical Room
| Agency: | COMMERCE, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 14, 2026 |
| Due Date: | Mar 27, 2026 |
| Solicitation No: | NB194000-26-00857 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Mar 13, 2026 01:26 pm MDT
- Original Response Date: Mar 27, 2026 05:00 pm MDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Apr 11, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Boulder , CO 80305USA
The National Institute of Standards and Technology (NIST) Boulder Campus seeks qualified small business contractors capable of performing a construction project to remove and replace two existing stair assemblies located in the lower-level mechanical room of Building 2. Work includes demolition and legal disposal of one (1) existing 5-riser wooden staircase and one (1) existing 9-riser wooden staircase and fabrication and installation of new galvanized steel stair assemblies. Due to restricted access within the mechanical room, the stair assemblies must be field-fabricated and installed in place, including required on-site welding. The new stair systems shall include slip-resistant industrial treads and code-compliant handrails and guardrails, and shall be securely anchored to the existing structure. Work also includes coordination with existing mechanical, electrical, and plumbing systems; protection of adjacent surfaces; cleanup and debris removal; and compliance with applicable building codes, OSHA regulations, and NIST safety and security requirements.
- ACQUISITION MANAGEMENT DIVISION 100 BUREAU DR.
- GAITHERSBURG , MD 20899
- USA
- Lauren Lopez
- lauren.lopez@nist.gov
- Travis Zoellner
- travis.zoellner@nist.gov
- Mar 13, 2026 01:26 pm MDTSources Sought (Original)
See Also
General Information Document ID IFB1-CAAA-2027000018-1 Status Open Description CTF FCF Grease Interceptor IFB1
State Government of Colorado
Due by 10/01/2026
Description: C27DM4 - CMGC Pre-Const Services: SpCk Dam Rehab Proj Department: DNR -
State Government of Colorado
Due by 6/30/2027
Follow Z1DA--554-26-106 Replace DW Valves. Active Contract Opportunity Notice ID 36C25926R0057 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/30/2026
Project ID: 26-055 Title: Roadway and Signalization Improvements - State Highway 45A (Pueblo
City of pueblo
Due by 10/14/2026