Newell Road Bridge Replacement Project PE-12011

Agency: City of Palo Alto
State: California
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Apr 15, 2025
Due Date: May 13, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID:

Title: Newell Road Bridge Replacement Project PE-12011

Addenda: 0

Release Date: 4/15/2025

Due Date: 5/13/2025

Post Information
Posted At:Tue, Apr 15, 2025 4:54 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

Remove a 114-year-old bridge located over San Francisquito Creek spanning between Woodland Avenue (East Palo Alto) and Newell Road (Palo Alto). The existing bridge is approximate 22-ft wide and 80-ft long, and abutments are located within the creek. The proposed bridge is approximately 42.6-ft by 80-ft. Work includes design and install creek protection measure, dewatering plan, demo concrete structures, install new Caltrans standard concrete structures (bridge with reinforced pile abutments, floodwalls and retaining walls), raising the approaches (4-ft – 0) and utility appurtenances (hydrant, valves, cleanouts, laterals, mainlines, manholes, etc.) to grade. Contractor is responsible for the design of retaining walls, complying with environmental permits, preparing plans (traffic control, dewatering, logistics). Additional improvements include permanent creek protection measures, water line relocation, tree removal and new planting. Work within the creek is limited to June 15 – October 15 and all work to be completed within 1.5 years. The project is funded by Highway Bridge Program (HBP), compliance with Caltrans standards and practices is required.

The Engineer's Estimate for this Project is $12 million.

Timeline
Bid Post Date:
April 15, 2025
Pre-Bid Meeting (Non-Mandatory):
April 28, 2025, 10:00am
In-Person Meeting at the Community Meeting Room (Ground Floor Level) at City Hall - 250 Hamilton Avenue, Palo Alto, CA 94301
Question and Clarifications Due Date and Time:
May 2, 2025, 1:00pm
City's Responses to Questions:
May 7, 2025
Bid Due Date and Time:
May 13, 2025, 3:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Residential Resurfacing Project - Phase I (Concrete Improvements) - Contract Documents, Plans and

City of Azusa

Bid Due: 6/25/2026

7972R1 - 7972R1 Western Trunk Line Project - Phase 1 Status Stage Open

City of Los Angeles

Bid Due: 7/30/2026

Project ID: 2021-RFP - Roads-076 Title: Request for Proposals (RFP) for the Shark

Santa Cruz County

Bid Due: 7/22/2026

Project ID: P40172(CON) Title: SAN LORENZO WAY BRIDGE REPLACEMENT, FEDERAL PROJECT No. BRLO-5936(086)

Santa Cruz County

Bid Due: 6/25/2026