New Pre-engineered Metal Building Gym & Remodel of a Portion of the Existing Gym to include two New Classrooms

Agency: State Government of Utah
State: Utah
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Jun 29, 2026
Due Date: Jul 21, 2026
Solicitation No: VAAC2603
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: New Pre-engineered Metal Building Gym & Remodel of a Portion of the Existing Gym to include two New Classrooms
Ref. #: VAAC2603
Department: CHARTER SCHOOLS - Venture Academy
Type: RFP
Status:
Open
Open Date: Jun 29th 2026, 4:00 PM MDT
Questions Due Date: Jul 16th 2026, 11:00 AM MDT
Close Date: Jul 21st 2026, 12:00 PM MDT

Project Description: Purpose
Venture Academy is adding an approximately 12,000 square foot pre-engineered metal building Gym adjacent to the existing High School building as well as remodeling a portion of the existing gym to create 2 new classrooms. The project should reach substantial completion by August, 2027. New Gym construction will begin while school is in session, the interior classroom remodel will begin on or around May 2027.
Project Description
Location
- 508 N 1500 W, Marriott-Slaterville, UT 84404
Gym Addition
The gym addition will be approximately 14,000 sq ft (100’ x 120’ large space, and 20’ x 100’ attached lower ceiling space) and will include:
- One full-size regulation basketball court
- 6–8 rows of retractable bleachers along one side
- An attached lower-height add-on (approximately 20’ x 100’) including:
- Entry vestibule
- Approximately three (3) restrooms
- Custodial closet
- Three (3) large storage rooms accessible from the gym (one of these rooms could be converted to dressing room stalls, no showers).
Existing Gym Remodel (Classrooms)
A portion of the existing gym (CMU construction) will be remodeled to create two (2) classrooms:
- Approximately 33’ x 55’ area on the south end of the existing gym
- Classrooms will be vertically stacked (two-story configuration)
- Access to the second-floor classroom will utilize existing upper-level walkways and elevator.
- A new exterior egress stair is required on the west side of the building
- The remaining north portion of the gym (approx. 60’ x 55’) will remain in use as an auxiliary gym space


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project: NS27-109 Tooele County School District - Copper Canyon Elementary Fencing Upgrades Ref.

State Government of Utah

Due by 9/29/2026

Project: DFCM Construction - Prequalified General Stage II - General- New Storage Building

State Government of Utah

Due by 10/08/2026

Project: General Contractor/Construction Services for Taylorsville High School and West Kearns Elementary Ref.

State Government of Utah

Due by 9/29/2026

Project: Supporting Voices of Survivors- Construction Service Ref. #: RA27-101 Department: Division of

State Government of Utah

Due by 9/21/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.