New Pre-engineered Metal Building Gym & Remodel of a Portion of the Existing Gym to include two New Classrooms

Agency: State Government of Utah
State: Utah
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Jun 29, 2026
Due Date: Jul 21, 2026
Solicitation No: VAAC2603
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Project: New Pre-engineered Metal Building Gym & Remodel of a Portion of the Existing Gym to include two New Classrooms
Ref. #: VAAC2603
Department: CHARTER SCHOOLS - Venture Academy
Type: RFP
Status:
Open
Open Date: Jun 29th 2026, 4:00 PM MDT
Questions Due Date: Jul 16th 2026, 11:00 AM MDT
Close Date: Jul 21st 2026, 12:00 PM MDT

Project Description: Purpose
Venture Academy is adding an approximately 12,000 square foot pre-engineered metal building Gym adjacent to the existing High School building as well as remodeling a portion of the existing gym to create 2 new classrooms. The project should reach substantial completion by August, 2027. New Gym construction will begin while school is in session, the interior classroom remodel will begin on or around May 2027.
Project Description
Location
- 508 N 1500 W, Marriott-Slaterville, UT 84404
Gym Addition
The gym addition will be approximately 14,000 sq ft (100’ x 120’ large space, and 20’ x 100’ attached lower ceiling space) and will include:
- One full-size regulation basketball court
- 6–8 rows of retractable bleachers along one side
- An attached lower-height add-on (approximately 20’ x 100’) including:
- Entry vestibule
- Approximately three (3) restrooms
- Custodial closet
- Three (3) large storage rooms accessible from the gym (one of these rooms could be converted to dressing room stalls, no showers).
Existing Gym Remodel (Classrooms)
A portion of the existing gym (CMU construction) will be remodeled to create two (2) classrooms:
- Approximately 33’ x 55’ area on the south end of the existing gym
- Classrooms will be vertically stacked (two-story configuration)
- Access to the second-floor classroom will utilize existing upper-level walkways and elevator.
- A new exterior egress stair is required on the west side of the building
- The remaining north portion of the gym (approx. 60’ x 55’) will remain in use as an auxiliary gym space


* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number: 26-07 Bid Title: Pack Creek Pedestrian Bridge Replacement and Channel Restoration

City of Moab

Bid Due: 9/01/2026

Follow UT NP DINO PMS(1), Pavement Preservation DINO Active Contract Opportunity Notice ID

TRANSPORTATION, DEPARTMENT OF

Project: Center Park Dr. - 6200 S Trail Construction Ref. #: WJPW26070801 Department:

State Government of Utah

Bid Due: 8/06/2026

Follow Escalante Basement Flood Repairs - Dixie National Forests Active Contract Opportunity Notice

AGRICULTURE, DEPARTMENT OF

Bid Due: 8/14/2026