ND FLAP SDN 7NE(1) Hoffer Lake Access
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | North Dakota |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jul 11, 2025 |
| Due Date: | Jul 25, 2025 |
| Solicitation No: | 6982AF-25-SS-000013 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Jul 11, 2025 05:39 am MDT
- Original Response Date: Jul 25, 2025 02:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Sep 24, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
McClusky , ND 58463USA
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Stephanie Navarro) for receipt by close of business (2 p.m. local Denver time) on July 25, 2025:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the ND FLAP SDN 7NE(1) Hoffer Lake Access. Provide a list of roadway construction projects in which you performed (as the prime contractor) work within a federal land such as national refuge area, national forest, national park, national monument and/or natural resource sensitive areas. Experience in construction phasing, temporary traffic control, and timely completion of construction is required. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
Project Details: ND FLAP SDN 7NE(1) Hoffer Lake Access
The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following:
- Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone.
- Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations.
- With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts.
- Remove reconditioning due to the project being 4R with earthwork.
PRINCIPAL WORK ITEMS:
- 20401-0000 Roadway Excavation: 6,000 CUYD
- 20441-0000 Waste: 3,952 CUYD
- 30101-0000 Aggregate Base: 6,000 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON
- 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE
- 63501-0000 Temporary Traffic Control: LPSM
ANTICIPATED SCHEDULE:
Advertisement – September 2025
Award – November 2025
Contract Completion – September 2026
ESTIMATED COST RANGE:
Total estimated cost between $2,000,000 and $5,000,000
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Stephanie Navarro
- cflacquisitions@dot.gov
- Kelly Palmer
- cflacquisitions@dot.gov
- Jul 11, 2025 05:39 am MDTSources Sought (Original)
See Also
Follow REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS Active
AGRICULTURE, DEPARTMENT OF
Due by 9/23/2026
Follow Minot Air Force Base Multiple Award Construction Contract (MACC) IDIQ Active Contract
DEPT OF DEFENSE
Due by 9/28/2026
Follow I Field Project Active Contract Opportunity Notice ID 127EAX26Q0103 Related Notice Department/Ind.
AGRICULTURE, DEPARTMENT OF
Due by 9/23/2026
Follow Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for
DEPT OF DEFENSE
Due by 9/23/2026