| Agency: | City of Sanford |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| Posted Date: | Feb 25, 2026 |
| Due Date: | Mar 5, 2026 |
| Solicitation No: | IFB 24/25-31R |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Date | Time | Mandatory | Location |
| 2/4/2026 | 10:00 AM | No |
1st Stop at 1201 W. Seminole Blvd. Sanford, FL 32771;
2nd Stop at 540 Cameron Avenue Sanford, Fl 32773 |
| Date | Time | Location |
| Question | Date Asked | Answer | Date Answered |
| Will there be any plans or specs released for this project? | 1/29/2026 3:13:39 PM | The specifications for this project are included in the contract bid package. | 2/19/2026 10:40:16 AM |
|
ection 15100 Article J (GBT) & Section 15150 Article G (BFP)
"All logic will be performed via Allen Bradley CompactLogix L16ER programmable logic controller (PLC), with NO network communication capabilities." - The "ER" designation means "Ethernet Redundant" and it comes with 2 ethernet ports. Networking is required for OIT (HMI) connection. Would a more robust CompactLogix L30ER be acceptable? |
2/16/2026 3:12:26 PM | We will consider/review alternate compliant units in the shop drawing process. Approved substitutions, if allowed, shall be at no additional contract cost. Bids shall be prepared based on the specified unit. | 2/19/2026 10:40:05 AM |
| What are the Plant operating hours? Will weekend work be permitted? | 2/16/2026 3:47:40 PM | The NWRF & SWRC operating hours are 7:00 AM – 5:00 PM Monday – Friday, no weekend work permitted. However, on Friday’s we have a limited crew in case of any emergencies. | 2/17/2026 6:39:44 AM |
| Will the Plants provide dumpster for disposing of old machine components? | 2/16/2026 3:48:44 PM | The vendor will need to provide their own dumpster for disposal. | 2/17/2026 6:40:22 AM |
|
Reference Bid Form Section 00410 Page 39 Article 1.02 paragraph 4: Per this section, the work to be substantial completed within 120 days and final completion 150 days. To complete the specified work, this timing needs to be increased from 120/150 days to 238-280 days as indicated below.
Agreement review: 2-3 weeks Submittals: 4-6 weeks Eng Submittal Review: 3-4 weeks Part Fabrication after receipt of approved submittal: 20-22 weeks Field service work: 4-5 weeks Total: 34 -40 weeks (238/280 days) |
2/17/2026 10:04:45 AM | Substantial completion shall be required in 240 calendar days and final completion in 270 calendar days. | 2/19/2026 10:40:39 AM |
| The work on this project does not require any construction work, only repair to existing equipment. Alfa Laval does not have a contractor’s license but is authorized to perform work in the State of Florida. Does Contractor’s license apply on this project? | 2/17/2026 10:06:37 AM | The project is maintenance work and a contractor’s license is not required. | 2/19/2026 10:41:00 AM |
| Will the Plants off load shipments at the job sites? | 2/17/2026 10:07:59 AM | Yes | 2/19/2026 10:46:51 AM |
|
Ref Section 15100 subsection 1.2.B & C (page 125) and 15150 subsection 1.2.B & C (page 134):
In both sections it states the City will provide means to dispose of packing and old parts and the City will offload shipments. Please confirm since below answer states that vendor will need to provide their own dumpster for disposal. |
2/18/2026 2:19:07 PM | The city is not providing a dumpster for all construction materials. The winning vendor is to provide their own. | 2/19/2026 10:56:18 AM |
|
Ref Section 15100 Subsection 2.2 New Rollers paragraphs A and C. In section A it states to replace all rollers with new rollers. In section C it states to recoat the rollers.
Section C needs to be revised to reflex new roller coatings. |
2/18/2026 2:43:10 PM | Existing rollers shall be recoated or the rollers replaced with new coated rollers at the discretion of the vendor at no additional contract cost. | 2/19/2026 10:48:20 AM |
|
Ref Section 15150 Subsection 2.2 New Rollers paragraphs A and B. In section A it states to replace all rollers with new rollers. In section C it states to recoat the rollers.
Section B needs to be revised to reflex new roller coatings. |
2/18/2026 2:44:05 PM | Existing rollers shall be recoated or the rollers replaced with new coated rollers at the discretion of the vendor at no additional contract cost. | 2/19/2026 10:48:43 AM |
|
Will the City of Sanford consider bids that cover installation of brand new equipment, preassembled, instead of rebuilding / repairing the existing BFP and GBT?
We would like to submit Charter Machine as an approved equal for the BFP and GBT with their respective control panels. |
2/19/2026 11:14:19 AM | No. | 2/19/2026 12:07:42 PM |
| Code | Description |
| [913-59] | Construction and Upgrades, Wastewater Treatment Plant |
| [913-91] | Maintenance and Repair, Wastewater Treatment Plant |
| [890-65] | Sewage and Waste Treating Equipment and Supplies |
| [890-77] | Waste Water Reclamation Systems And Parts |
| Publication | Date |
| Orland Sentinel | 1/29/2026 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Advertisement Detail Department of Transportation Invitation to Bid ORLANDO DATA CENTER UNINTERRUPTED POWER
State Government of Florida
Bid Due: 10/11/2080
Advertisement Detail Department of Transportation Invitation to Bid Inspections, Maintenance, Repair, Replacement and
State Government of Florida
Bid Due: 9/10/2080
Main Agency Pinellas County School Board Status Active Fiscal Year 2026 Primary Contact
Pinellas County School Board
Bid Due: 6/12/2026
Main Agency Pinellas County School Board Status Active Fiscal Year 2026 Primary Contact
Polk County Public Schools Facilities and Operations
Bid Due: 6/12/2026