N045--Loch Raven VAMC Bldg 6 Boiler Replacement 512-26-1-444-0006
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Maryland |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Oct 17, 2025 |
| Due Date: | Oct 31, 2025 |
| Solicitation No: | 36C24526Q0071 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Oct 17, 2025 11:40 am EDT
- Original Response Date: Oct 31, 2025 11:00 am EDT
- Inactive Policy: Manual
- Original Inactive Date: Dec 30, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: N045 - INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Department of Veterans Affairs Loch Raven VAMC Baltimore , MD 21218USA
Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven VA Medical Center.
Please respond to this RFI/Sources Sought 36C24526Q0071 with your:
1. Business name (including Unique Entity ID (SAM.gov)
2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned,
Disadvantaged Small Business, 8(a), etc.), and
3. Person of contact (including telephone number & email address).
4. Capability statement and summary of previous experience providing these types of
services for the Veterans Health Administration or other similar facilities.
5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include
applicable NAICS)
6. Brief Summary of categories of services that your company can/cannot provide.
7. Certification(s) / Licenses for meeting the local requirements to provide these
services at the Huntington VAMC (if applicable)
8. Confirmation that your organization has the capability & expertise to meet the
performance requirements while complying with applicable limitations in
subcontracting by responding to the questions below with your response:
a. Do you intend to self-perform this effort?
b. If you are located outside the immediate area, how will you self-perform?
c. Or do you intend to subcontract work under this contract?
d. If you intend to subcontract work under this contract, how will you ensure
compliance with the limitations on subcontracting?
Response Instructions:
Responses must be received by Friday 10/31/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov
SCOPE OF WORK
LR Bldg 6 Boiler Replacement
Project: 512-25-052 GENERAL SCOPE OF WORK:
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation.
Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH).
Provide disposal receipts to VA.
Provide and install CSD-1 compliant Boiler sized to match existing boiler.
Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed.
Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.
- 8849 International Drive Suite 215
- LINTHICUM , MD 21090
- USA
- William Chris Galletta
- William.Galletta@va.gov
- Phone Number 410-637-1506
- Oct 17, 2025 11:40 am EDTSources Sought (Original)
See Also
Follow 1174459 - ARS - Electronic Security Systems at The Beltsville Agricultural Research
AGRICULTURE, DEPARTMENT OF
Due by 9/25/2026
ID: BPM058412 Title: Decals and Striping for City Vehicles and Equipment Status: Open
State Government of Maryland
Due by 9/16/2026
ID: BPM058412 Title: Decals and Striping for City Vehicles and Equipment Status: Open
State Government of Maryland
Due by 10/07/2026
ID: BPM058831 Title: SBY Air Traffic Control Tower Interior Re-Hab Status: Open Due
State Government of Maryland
Due by 10/22/2026