N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Maryland |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Nov 14, 2025 |
| Due Date: | Dec 3, 2025 |
| Solicitation No: | 36C24526Q0118 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Nov 14, 2025 02:03 pm EST
- Original Date Offers Due: Dec 03, 2025 11:00 am EST
- Inactive Policy: Manual
- Original Inactive Date: Feb 01, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: N045 - INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Department of Veterans Affairs Loch Raven VAMC Baltimore , MD 21201USA
SCOPE OF WORK
LR Bldg 6 Boiler Replacement
Project: 512-25-052 GENERAL SCOPE OF WORK:
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation.
Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH).
Provide disposal receipts to VA.
Provide and install CSD-1 compliant Boiler sized to match existing boiler.
Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed.
Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.
- 8849 International Drive Suite 215
- LINTHICUM , MD 21090
- USA
- William Chris Galletta
- William.Galletta@va.gov
- Phone Number 410-637-1506
- Nov 14, 2025 02:03 pm ESTCombined Synopsis/Solicitation (Original)
See Also
Follow 1174459 - ARS - Electronic Security Systems at The Beltsville Agricultural Research
AGRICULTURE, DEPARTMENT OF
Due by 9/25/2026
ID: BPM058412 Title: Decals and Striping for City Vehicles and Equipment Status: Open
State Government of Maryland
Due by 9/16/2026
ID: BPM058412 Title: Decals and Striping for City Vehicles and Equipment Status: Open
State Government of Maryland
Due by 10/07/2026
ID: BPM058831 Title: SBY Air Traffic Control Tower Interior Re-Hab Status: Open Due
State Government of Maryland
Due by 10/22/2026