Myakka River Park Construction Phase 1

Agency: Charlotte County
State: Florida
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 541330 - Engineering Services
Posted Date: Dec 15, 2025
Due Date: Jan 7, 2026
Solicitation No: 26-117
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
File No:

26-117
Description:

Myakka River Park Construction Phase 1
Contact:

Krista.Vigne@CharlotteCountyFl.gov
File number:

20260117
Due Date:
1/7/2026 12:00:00 AM
Notice:
261171
Package:
261172
Registered Vendors Notified:
261173
Presubmittal Sign-in:
261170
Tabulation:
Recommendation:
Addendum:
261176a 261176b
261176c
Commodity Codes:

91200, 91226, 91300, 91347, 91371, 91382, 98852, 91000, 90976, 91219, 91223, 91226, 91244, 95935

Attachment Preview

PURCHASING DIVISION
Charlotte County Administration Center
18500 Murdock Circle, Suite 344
Port Charlotte, Florida 33948-1094
Phone 941.743.1378
Fax 941.743.1384
TO: PROSPECTIVE BIDDERS
DATE: DECEMBER 15, 2025
BID OPENING DATE: JANUARY 7, 2026, AT 2:00 p.m. (EST)
RE: ADDENDUM #3, BID NO. 20260117, MYAKKA RIVER PARK CONSTRUCTION PHASE 1
Bidders are hereby notified that this addendum shall be made a part of the above-named proposal and contract documents.
The following is issued to modify, and/or clarify the proposal and contract documents. These items shall have the same force and
effect as the original bid and contract documents, and bids to be submitted on the specified date shall conform with the additions,
deletions and revisions as listed herein.
ITEM #1
QUESTIONS/ANSWERS:
Q1: Is there an irrigation design forthcoming?
A1: No. Plantings are generally consistent with xeriscaping principles which reduce water consumption
while enhancing both the beauty and hardiness of Florida landscaping. All required landscaping and
buffers shall be irrigated by the contractor during the establishment period.
Q2: If not, is there a point of connection for the irrigation water source?
A2: No. Potable water is available along Gallagher Boulevard. A hydrant located at the intersection of
Gallagher Boulevard and Spire Street. Contractor shall obtain a hydrant meter for construction, if
required.
Q3: As far as the bahia sod goes, it calls for FDOT standards which would require rolls of sod, it is more cost
effective to get this installed by the piece (palletized). Please confirm if palletized sod is acceptable.
A3: Pallet sod is acceptable provided the condition and quality meet the County’s other technical
specifications and standards.
Q4: Is there an existing irrigation system?
A4: No.
Q5: How is the proposed sod to be irrigated?
A5: All required landscaping and buffers shall be irrigated by the Contractor during the establishment
period. Means and methods of irrigation are up to the Contractor.
Q6: Is there any intention of these plantings/sod to be irrigated automatically? This is a rather large landscape
package with what seems to be a lack of irrigation?
A6: Means and methods of irrigation are up to the Contractor. All required landscaping and buffers may
be served by an automatic irrigation system during the establishment period.
Q7: If the landscaping is not going to be under automatic irrigation, what is the expectation of the Contractor for
keeping these alive and well and for how long is it expected to be the Contractor’s responsibility to keep up with
BID NO. 20260117, ADDENDUM NO. 3
until it becomes the County’s responsibility?
A7: Until final acceptance of the project.
Q8: Is there a park contact we need to arrange visiting the site with?
A8: The park is open to the public and the Contractor may inspect the site at anytime.
Q9: Can we extend the completion time of March 14, 2026 with the Army Corps of Engineers permit?
A9: The USACOE permit stipulates that the construction must be completed within 12 months after the
expiration date of the permit. Therefore, completion will be 150 days after Notice to Proceed.
Q10: Will the County extend the completion time beyond the 120 days?
A10: Completion time will be 150 days after Notice to Proceed. See the correction below.
Q11: Will the Contractor be responsible to obtain the NPDES permit?
A11: Yes.
Q12: Will the Contract be responsible to obtain County permits? If so, what is the estimated wait time for a
County permit?
A12: Contractor is to obtain all building permits necessary. The Contractor may contact the Building
Construction department to inquire about permit times.
Q13: Is mulching required for this project? If so, what is the pay item for the mulch?
A13: The work shall include all labor, equipment, tools, and transportation services required to plant
trees, shrubs and groundcover, supply and install staking and guying, watering, and mulch.
Q14: Should the underdrain be removed from the plan documents?
A14: This item is no longer required and is not a bid item.
Q15: Is rip rap required? If so, is there a pay item for the rip rap?
A15: Include all rip rap in pay item 25. The quantity of rip rap as shown on the bid form is approximate
and is given only as a basis of calculation for award of the contract. The actual quantities may vary
substantially from the estimated amount; however, the Contractor shall not exceed bid quantity without
written approval from the County. The quantity to be paid for in this specification shall be paid for per
square yard once satisfactorily completed and accepted.
Q16: Are environmental signs required for the project? If so, is there a pay item for the signs?
A16: No. Environmental signage is not a bid item. County will provide and install this signage after the
project is complete.
Q17: What is the anticipated start date for the project?
A17: The County anticipates this project to go to the Board of County Commissioners during one of the
February board meetings. Once approved, then the project may begin immediately after.
Q18: On pages 05 of 16 on the plans, the legend is blank and no scale is provided. Please explain.
A18: Scales are shown by the north arrow on the appropriate sheets (1” = 30’) for full size prints.
Q19: On pages 07, 08, 11, and 12 of 16 on the plans, is no legend is provided?
A19: See below:
Legend for the surface material is shown on Sheet 05 of 16 and applies to all sheets where
shown.
Sheet 07 and 08 are for paving, grading, and drainage.
Sheet 12 has call outs for the best management practices (erosion control).
Sheet 16 show trees to be removed. Trees that are struck through on the table are to be removed.
Q20: On pages 14 and 15 of 16 on the plans, the legend does not correlate the various surface textures used on
plans. Please explain.
A20: Legend for the various textures used on the plans is shown on Sheet 05 of 16 and applies to all
sheets where shown.
Q21: No scale provided. Please explain.
A21: Scales are shown by the north arrow on the appropriate sheets (1” = 30’) for full size prints.
BID NO. 20260117, ADDENDUM NO. 3
ITEM #2
ITEM #3
ITEM #4
Q22: Item 2, erosion and water pollution control, is currently lump sum. With no scales on the drawings it is
impossible to determine the extent of this work. Could quantities please be provided for each item required for
this bid item?
A22: Scales are shown by the north arrow on the appropriate sheets (1” = 30’) for full size prints.
Q23: Can you please confirm in irrigation is required for all landscaping? There is a note on the plans saying that
it is. However, there is no water source or electricity. If irrigation is required, we will need either plans showing a
connection to the water main or a local well. Power will also be required; this may be a new service to the
property that will require electrical plans. Please advise.
A23: There is no permanent irrigation required. Plantings are generally consistent with xeriscaping
principles which at its purpose reduces water consumption while enhancing both the beauty and
hardiness of Florida landscaping. All required landscaping and buffers shall be irrigated by the
contractor during the establishment period.
CORRECTION: On page 19 of the SP-06 CONTRACT TIME, ‘The Contractor shall use no more than 120
calendar days from the date specified in the Notice to Proceed, being the Contract Time, to complete all phases
of this project’. Please strikethrough the 120 calendar days and replace with 150 calendar days.
CORRECTION: On page 20 of the SP-09 LIQUIDATED DAMAGES, ‘The work shall be completed in 120
calendar days.’ Please strikethrough the 120 calendar days and replace with 150 calendar days.
CORRECTION: On page 41 of the BID FORM, ‘Completion Time: 120 calendar days.’ Please strikethrough
the 120 calendar days and replace with 150 calendar days.
This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20260117. Bidders
are required to acknowledge receipt of this addendum on their bid forms.
Kimberly A. Corbett, C.P.M., CPPB
Senior Division Manager - Purchasing
KAC/kv
BID NO. 20260117, ADDENDUM NO. 3
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:

City of St. Petersburg

Bid Due: 6/09/2026

RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View

City of Tampa

Bid Due: 6/11/2026

Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to

Orange County

Bid Due: 6/04/2026

Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract

DEPT OF DEFENSE

Bid Due: 6/09/2026