Murray Tower Comprehensive Rehabilitation Project, AMP-31
| Agency: | Housing Authority of the City of Pittsburgh |
|---|---|
| State: | Pennsylvania |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 12, 2026 |
| Due Date: | Jun 23, 2026 |
| Solicitation No: | IFB#600-08-26 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
IFB#600-08-26
OPEN
HACP is issuing this Invitation for Bids (“IFB”) for qualified and interested business firms to submit sealed bids to provide Murray Tower Comprehensive Rehabilitation Project, AMP-31.
Issue Date:
May 4, 2026 08:00 amMeeting Date:
May 27, 2026 10:00 amDeadline Date:
Jun 23, 2026 10:00 amMay 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
May 15, 2026
May 15, 2026
May 26, 2026
May 26, 2026
Jun 2, 2026
Jun 2, 2026
Jun 2, 2026
Jun 2, 2026
Jun 12, 2026
Jun 12, 2026
Jun 12, 2026
Jun 12, 2026
Jun 12, 2026
Attachment Preview
SECTION000102
PROJECTINFORMATION
PART1 GENERAL
1.01 PROJECTIDENTIFICATION
A. ProjectName: HACPMurrayTowers,locatedat2 825MurrayAve,Pittsburgh,PA15217.
B. Architect'sProject#:2338:
C. Owner'sProjectNumber:#04-AMP-31,ManagementNo.7954BPO3827.
2825MurrayAve.
Pittsburgh,Pennsylvania15217.
D. TheOwner,hereinafterreferredtoasHACP
1.02 NOTICETOPROSPECTIVEBIDDERS
A. ThesedocumentsconstituteaNoticeofIntenttoRequestProposalsandaRequestfor
QualificationsfromprospectiveDesign-Buildersforthedesignandconstructionoftheproject
describedbelow.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION-NOTUSED
ENDOFSECTION
MurrayTowersRehab 000102-2 ProjectInformation
SECTION000107
SEALSPAGE
DESIGNPROFESSIONALSOFRECORD
A.ARCHITECT:
1.FUKUIARCHITECTS
2.RA404265
3.RESPONSIBLEFORDIVISON01-49SECTIONSEXCEPTWHEREINDICATEDAS
PREPAREDBYOTHERDESIGNPROFESSIONALSOFRECORD.
B.STRUCTURALENGINEER:
1.PROVIDENCEENGINEERING.
2.PE085703.
3.RESPONSIBLEFOR033000,042200,051200,061753
B.FIRE-PROTECTIONENGINEER:
1.IAMSCONSULTING
2.PE085703
3.RESPONSIBLEFORDIVISION21
C.PLUMBINGENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION22
D.HVACENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION23
E.ELECTRICALENGINEER
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION26-28
ENDOFSECTION
MurrayTowersRehab 000107-3 SealsPage
SECTION000110
TABLEOFCONTENTS
PROCUREMENTANDCONTRACTINGREQUIREMENTS
1.01 DIVISION00--PROCUREMENTANDCONTRACTINGREQUIREMENTS
A. 000101-ProjectTitlePage
B. 000102-ProjectInformation
C. 000107-SealsPage
D. 000115-ListofDrawingSheets
SPECIFICATIONS
2.01 DIVISION01--GENERALREQUIREMENTS
A. 011000-Summary
B. 012000-PriceandPaymentProcedures
C. 012500-SubstitutionProcedures
D. 013000-AdministrativeRequirements
E. 013216-ConstructionProgressSchedule
F. 015000-TemporaryFacilitiesandControls
G. 015100-TemporaryUtilities
H. 015713-TemporaryErosionandSedimentControl
I. 016000-ProductRequirements
J. 017000-ExecutionandCloseoutRequirements
K. 017419-ConstructionWasteManagementandDisposal
L. 017800-CloseoutSubmittals
M. 017900-DemonstrationandTraining
2.02 DIVISION02--EXISTINGCONDITIONS
A. 024100-Demolition
B. 028000 # -AsbestosAbatement
2.03 DIVISION03--CONCRETE
A. 030100-MaintenanceofConcrete
B. 031000-ConcreteFormingandAccessories
C. 032000-ConcreteReinforcing
D. 033000-Cast-in-PlaceConcrete
2.04 DIVISION04--MASONRY
A. 040100-MaintenanceofMasonry
2.05 DIVISION05--METALS
A. 054000-Cold-FormedMetalFraming
B. 055213-PipeandTubeRailings
2.06 DIVISION06--WOOD,PLASTICS,ANDCOMPOSITES
A. 061053-MiscellaneousRoughCarpentry
2.07 DIVISION07--THERMALANDMOISTUREPROTECTION
A. 072100-ThermalInsulation
B. 075400-ThermoplasticMembraneRoofing
MurrayTowersRehab 000110-4 TableofContents
C. 076200-SheetMetalFlashingandTrim
D. 078400-Firestopping
E. 079200-JointSealants
2.08 DIVISION08--OPENINGS
A. 081113-HollowMetalDoorsandFrames
B. 081416-FlushWoodDoors
C. 083100-AccessDoorsandPanels
D. 084126-All-GlassEntrancesandStorefronts
E. 084229-AutomaticEntrances
F. 087100-DoorHardware
2.09 DIVISION09--FINISHES
A. 090561-CommonWorkResultsforFlooringPreparation
B. 092116-GypsumBoardAssemblies
C. 093000-Tiling
D. 095100-AcousticalCeilings
E. 096500-ResilientFlooring
F. 099123-InteriorPainting
2.10 DIVISION10--SPECIALTIES
A. 101419-DimensionalLetterSignage
B. 102600-WallandDoorProtection
C. 102800-Toilet,Bath,andLaundryAccessories
D. 102819-TubandShowerEnclosures
E. 104300-EmergencyAidSpecialties
F. 104400-FireProtectionSpecialties
G. 105613-MetalStorageShelving
H. 108213-ExteriorGrillesandScreens
2.11 DIVISION11--EQUIPMENT
2.12 DIVISION12--FURNISHINGS
A. 122113-HorizontalLouverBlinds
B. 123530-ResidentialCasework
C. 123600-Countertops
2.13 DIVISION13--SPECIALCONSTRUCTION
2.14 DIVISION14--CONVEYINGEQUIPMENT
2.15 DIVISION21--FIRESUPPRESSION
A. 210500-CommonWorkResultsforFireSuppression
B. 211300-Fire-SuppressionSprinklerSystems
2.16 DIVISION22--PLUMBING
A. 220517-SleevesandSleeveSealsforPlumbingPiping
B. 220719-PlumbingPipingInsulation
C. 221005-PlumbingPiping
D. 221006-PlumbingPipingSpecialties
MurrayTowersRehab 000110-5 TableofContents
E. 224000-PlumbingFixtures
F. 224017-BathtubsandShowers
2.17 DIVISION23--HEATING,VENTILATING,ANDAIR-CONDITIONING(HVAC)
A. 230513-CommonMotorRequirementsforHVACEquipment
B. 230529-HangersandSupportsforHVACPipingandEquipment
C. 230593-Testing,Adjusting,andBalancingforHVAC
D. 230713-DuctInsulation
E. 230800-CommissioningofHVAC
F. 232300-RefrigerantPiping
G. 233100-HVACDuctsandCasings
H. 233423-HVACPowerVentilators
I. 237313-ModularIndoorCentral-StationAir-HandlingUnits
J. 238113-PackagedTerminalAir-Conditioners
K. 238119-Self-ContainedAir-Conditioners
L. 238126.13-Small-CapacitySplit-SystemAirConditioners
2.18 DIVISION25--INTEGRATEDAUTOMATION
2.19 DIVISION26--ELECTRICAL
A. 260505-SelectiveDemolitionforElectrical
B. 260519-Low-VoltageElectricalPowerConductorsandCables
C. 260526-GroundingandBondingforElectricalSystems
D. 260583-WiringConnections
E. 260923-LightingControlDevices
F. 262413-Switchboards
G. 262416-Panelboards
H. 262726-WiringDevices
I. 265100-InteriorLighting
J. 265600-ExteriorLighting
2.20 DIVISION27--COMMUNICATIONS
2.21 DIVISION28--ELECTRONICSAFETYANDSECURITY
A. 284600-FireDetectionandAlarm
2.22 DIVISION31--EARTHWORK
A. 311000-SiteClearing
B. 312200-Grading
C. 312316.13-Trenching
2.23 DIVISION32--EXTERIORIMPROVEMENTS
A. 321216-AsphaltPaving
B. 321313-ConcretePaving
C. 321710-ParkingBumpersandManufacturedTraffic-CalmingDevices
D. 321723-PavementMarkings
E. 321731-SteelGuardrail
F. 323113-ChainLinkFencesandGates
MurrayTowersRehab 000110-6 TableofContents
G. 323119-DecorativeMetalFencesandGates
H. 323223-SegmentalRetainingWalls
I. 323300-SiteFurnishings
J. 329219-Seeding
K. 329300-Plants
2.24 DIVISION33--UTILITIES
2.25 DIVISION34--TRANSPORTATION
2.26 DIVISION40--PROCESSINTEGRATION
2.27 DIVISION46--WATERANDWASTEWATEREQUIPMENT
MurrayTowersRehab 000110-7 TableofContents
MurrayTowersRehab 000115-8 ListofDrawingSheets
SECTION 000115
LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
1.01
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Drawing
Index Page of the separately bound drawing set titled Murray Towers Rehab, dated April
24,2026, as modified by subsequent Addenda and Contract Modifications.
END OF SECTION
SECTION011000
SUMMARY
PART1 GENERAL
1.01 PROJECT
A. ProjectName: MurrayTowersRehab
B. Owner'sName: HACP.
C. Architect'sName: FukuiArchitects.
D. AdditionalProjectcontactinformationisspecifiedinSection000103-ProjectDirectory.
1.02 CONTRACTDESCRIPTION
A. ContractType: Multipleprimecontracts,eachbasedonaStipulatedPriceasdescribedin
Document005000-ContractingFormsandSupplements.
1.03 DESCRIPTIONOFALTERATIONSWORK
A. ScopeofdemolitionandremovalworkisindicatedondrawingsandspecifiedinSection
024100.
B. Scopeofalterationsworkisindicatedondrawings.
1.04 WORKBYOWNER
A. OwnerhasawardedacontractforsupplyandinstallationofAccessControls,Environmental
Sensors,andSecurityCameraswhichw illcommenceonduringprojectconstruction.
B. ItemsnotedNIC(NotinContract)willbesuppliedandinstalledbyOwnerafterDateof
SubstantialCompletion. Someitemsinclude:
1. Unitrefrigeratorsandstoves
C. OwnerwillsupplythefollowingforinstallationbyContractor:
1.05 OWNEROCCUPANCY
A. OwnerintendstooccupytheProjectuponSubstantialCompletion.
B. CooperatewithOwnertominimizeconflictandtofacilitateOwner'soperations.
C. ScheduletheWorktoaccommodateOwneroccupancy.
1.06 CONTRACTORUSEOFSITEANDPREMISES
A. ProvideaccesstoandfromsiteasrequiredbylawandbyOwner:
1. EmergencyBuildingExitsDuringConstruction: Keepallexitsrequiredbycodeopen
duringconstructionperiod;providetemporaryexitsignsifexitroutesaretemporarily
altered.
2. Donotobstructroadways,sidewalks,orotherpublicwayswithoutpermit.
1.07 WORKSEQUENCE
A. ConstructWorkinstagesduringtheconstructionperiod:
1. Stage1: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase1".
2. Stage2: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase2".
3. Stage3:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase3".
4. Stage4:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase4".
B. CoordinateconstructionscheduleandoperationswithOwnerandArchitect.
1.08 SPECIFICATIONSECTIONSAPPLICABLETOEVERYCONTRACT
A. Unlessotherwisenoted,provisionsofthesectionslistedbelowapplytoeverycontract.
Specificitemsofworklistedunderindividualcontractdescriptionsconstituteexceptions.
B. Section000103-ProjectDirectory.
C. Section012500-SubstitutionProcedures.
MurrayTowersRehab 011000-9 Summary
D. Section013000-AdministrativeRequirements.
E. Section013216-ConstructionProgressSchedule.
F. Section015000-TemporaryFacilitiesandControls.
G. Section017000-ExecutionandCloseoutRequirements.
H. Section017800-CloseoutSubmittals.
ENDOFSECTION
MurrayTowersRehab 011000-10 Summary
See Also
Project: Lingle Park - Pickleball Court Improvements Ref. #: Lower Paxton Township, Dauphin
PennBid
Due by 11/20/2026
Project: Mihalik-Thompson Stadium DHW Replacement Project Ref. #: Slippery Rock University, Butler County
PennBid
Due by 11/19/2026
413 N. 6th Street RFP Job Title: 413 N. 6th Street RFP County
City of Altoona
Due by 11/13/2026
Follow JP Martha Float Mooring Bitts Retrofit Active Contract Opportunity Notice ID W911WN26CA015
DEPT OF DEFENSE