| Agency: | Housing Authority of the City of Pittsburgh |
|---|---|
| State: | Pennsylvania |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 2, 2026 |
| Due Date: | Jun 9, 2026 |
| Solicitation No: | IFB#600-08-26 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
IFB#600-08-26
OPEN
HACP is issuing this Invitation for Bids (“IFB”) for qualified and interested business firms to submit sealed bids to provide Murray Tower Comprehensive Rehabilitation Project, AMP-31.
Issue Date:
May 4, 2026 08:00 amMeeting Date:
May 27, 2026 10:00 amDeadline Date:
Jun 9, 2026 10:00 am
May 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
May 15, 2026
May 26, 2026
Jun 2, 2026
SECTION000102
PROJECTINFORMATION
PART1 GENERAL
1.01 PROJECTIDENTIFICATION
A. ProjectName: HACPMurrayTowers,locatedat2 825MurrayAve,Pittsburgh,PA15217.
B. Architect'sProject#:2338:
C. Owner'sProjectNumber:#04-AMP-31,ManagementNo.7954BPO3827.
2825MurrayAve.
Pittsburgh,Pennsylvania15217.
D. TheOwner,hereinafterreferredtoasHACP
1.02 NOTICETOPROSPECTIVEBIDDERS
A. ThesedocumentsconstituteaNoticeofIntenttoRequestProposalsandaRequestfor
QualificationsfromprospectiveDesign-Buildersforthedesignandconstructionoftheproject
describedbelow.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION-NOTUSED
ENDOFSECTION
MurrayTowersRehab 000102-2 ProjectInformation
SECTION000107
SEALSPAGE
DESIGNPROFESSIONALSOFRECORD
A.ARCHITECT:
1.FUKUIARCHITECTS
2.RA404265
3.RESPONSIBLEFORDIVISON01-49SECTIONSEXCEPTWHEREINDICATEDAS
PREPAREDBYOTHERDESIGNPROFESSIONALSOFRECORD.
B.STRUCTURALENGINEER:
1.PROVIDENCEENGINEERING.
2.PE085703.
3.RESPONSIBLEFOR033000,042200,051200,061753
B.FIRE-PROTECTIONENGINEER:
1.IAMSCONSULTING
2.PE085703
3.RESPONSIBLEFORDIVISION21
C.PLUMBINGENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION22
D.HVACENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION23
E.ELECTRICALENGINEER
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION26-28
ENDOFSECTION
MurrayTowersRehab 000107-3 SealsPage
SECTION000110
TABLEOFCONTENTS
PROCUREMENTANDCONTRACTINGREQUIREMENTS
1.01 DIVISION00--PROCUREMENTANDCONTRACTINGREQUIREMENTS
A. 000101-ProjectTitlePage
B. 000102-ProjectInformation
C. 000107-SealsPage
D. 000115-ListofDrawingSheets
SPECIFICATIONS
2.01 DIVISION01--GENERALREQUIREMENTS
A. 011000-Summary
B. 012000-PriceandPaymentProcedures
C. 012500-SubstitutionProcedures
D. 013000-AdministrativeRequirements
E. 013216-ConstructionProgressSchedule
F. 015000-TemporaryFacilitiesandControls
G. 015100-TemporaryUtilities
H. 015713-TemporaryErosionandSedimentControl
I. 016000-ProductRequirements
J. 017000-ExecutionandCloseoutRequirements
K. 017419-ConstructionWasteManagementandDisposal
L. 017800-CloseoutSubmittals
M. 017900-DemonstrationandTraining
2.02 DIVISION02--EXISTINGCONDITIONS
A. 024100-Demolition
B. 028000 # -AsbestosAbatement
2.03 DIVISION03--CONCRETE
A. 030100-MaintenanceofConcrete
B. 031000-ConcreteFormingandAccessories
C. 032000-ConcreteReinforcing
D. 033000-Cast-in-PlaceConcrete
2.04 DIVISION04--MASONRY
A. 040100-MaintenanceofMasonry
2.05 DIVISION05--METALS
A. 054000-Cold-FormedMetalFraming
B. 055213-PipeandTubeRailings
2.06 DIVISION06--WOOD,PLASTICS,ANDCOMPOSITES
A. 061053-MiscellaneousRoughCarpentry
2.07 DIVISION07--THERMALANDMOISTUREPROTECTION
A. 072100-ThermalInsulation
B. 075400-ThermoplasticMembraneRoofing
MurrayTowersRehab 000110-4 TableofContents
C. 076200-SheetMetalFlashingandTrim
D. 078400-Firestopping
E. 079200-JointSealants
2.08 DIVISION08--OPENINGS
A. 081113-HollowMetalDoorsandFrames
B. 081416-FlushWoodDoors
C. 083100-AccessDoorsandPanels
D. 084126-All-GlassEntrancesandStorefronts
E. 084229-AutomaticEntrances
F. 087100-DoorHardware
2.09 DIVISION09--FINISHES
A. 090561-CommonWorkResultsforFlooringPreparation
B. 092116-GypsumBoardAssemblies
C. 093000-Tiling
D. 095100-AcousticalCeilings
E. 096500-ResilientFlooring
F. 099123-InteriorPainting
2.10 DIVISION10--SPECIALTIES
A. 101419-DimensionalLetterSignage
B. 102600-WallandDoorProtection
C. 102800-Toilet,Bath,andLaundryAccessories
D. 102819-TubandShowerEnclosures
E. 104300-EmergencyAidSpecialties
F. 104400-FireProtectionSpecialties
G. 105613-MetalStorageShelving
H. 108213-ExteriorGrillesandScreens
2.11 DIVISION11--EQUIPMENT
2.12 DIVISION12--FURNISHINGS
A. 122113-HorizontalLouverBlinds
B. 123530-ResidentialCasework
C. 123600-Countertops
2.13 DIVISION13--SPECIALCONSTRUCTION
2.14 DIVISION14--CONVEYINGEQUIPMENT
2.15 DIVISION21--FIRESUPPRESSION
A. 210500-CommonWorkResultsforFireSuppression
B. 211300-Fire-SuppressionSprinklerSystems
2.16 DIVISION22--PLUMBING
A. 220517-SleevesandSleeveSealsforPlumbingPiping
B. 220719-PlumbingPipingInsulation
C. 221005-PlumbingPiping
D. 221006-PlumbingPipingSpecialties
MurrayTowersRehab 000110-5 TableofContents
E. 224000-PlumbingFixtures
F. 224017-BathtubsandShowers
2.17 DIVISION23--HEATING,VENTILATING,ANDAIR-CONDITIONING(HVAC)
A. 230513-CommonMotorRequirementsforHVACEquipment
B. 230529-HangersandSupportsforHVACPipingandEquipment
C. 230593-Testing,Adjusting,andBalancingforHVAC
D. 230713-DuctInsulation
E. 230800-CommissioningofHVAC
F. 232300-RefrigerantPiping
G. 233100-HVACDuctsandCasings
H. 233423-HVACPowerVentilators
I. 237313-ModularIndoorCentral-StationAir-HandlingUnits
J. 238113-PackagedTerminalAir-Conditioners
K. 238119-Self-ContainedAir-Conditioners
L. 238126.13-Small-CapacitySplit-SystemAirConditioners
2.18 DIVISION25--INTEGRATEDAUTOMATION
2.19 DIVISION26--ELECTRICAL
A. 260505-SelectiveDemolitionforElectrical
B. 260519-Low-VoltageElectricalPowerConductorsandCables
C. 260526-GroundingandBondingforElectricalSystems
D. 260583-WiringConnections
E. 260923-LightingControlDevices
F. 262413-Switchboards
G. 262416-Panelboards
H. 262726-WiringDevices
I. 265100-InteriorLighting
J. 265600-ExteriorLighting
2.20 DIVISION27--COMMUNICATIONS
2.21 DIVISION28--ELECTRONICSAFETYANDSECURITY
A. 284600-FireDetectionandAlarm
2.22 DIVISION31--EARTHWORK
A. 311000-SiteClearing
B. 312200-Grading
C. 312316.13-Trenching
2.23 DIVISION32--EXTERIORIMPROVEMENTS
A. 321216-AsphaltPaving
B. 321313-ConcretePaving
C. 321710-ParkingBumpersandManufacturedTraffic-CalmingDevices
D. 321723-PavementMarkings
E. 321731-SteelGuardrail
F. 323113-ChainLinkFencesandGates
MurrayTowersRehab 000110-6 TableofContents
G. 323119-DecorativeMetalFencesandGates
H. 323223-SegmentalRetainingWalls
I. 323300-SiteFurnishings
J. 329219-Seeding
K. 329300-Plants
2.24 DIVISION33--UTILITIES
2.25 DIVISION34--TRANSPORTATION
2.26 DIVISION40--PROCESSINTEGRATION
2.27 DIVISION46--WATERANDWASTEWATEREQUIPMENT
MurrayTowersRehab 000110-7 TableofContents
MurrayTowersRehab 000115-8 ListofDrawingSheets
SECTION 000115
LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
1.01
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Drawing
Index Page of the separately bound drawing set titled Murray Towers Rehab, dated April
24,2026, as modified by subsequent Addenda and Contract Modifications.
END OF SECTION
SECTION011000
SUMMARY
PART1 GENERAL
1.01 PROJECT
A. ProjectName: MurrayTowersRehab
B. Owner'sName: HACP.
C. Architect'sName: FukuiArchitects.
D. AdditionalProjectcontactinformationisspecifiedinSection000103-ProjectDirectory.
1.02 CONTRACTDESCRIPTION
A. ContractType: Multipleprimecontracts,eachbasedonaStipulatedPriceasdescribedin
Document005000-ContractingFormsandSupplements.
1.03 DESCRIPTIONOFALTERATIONSWORK
A. ScopeofdemolitionandremovalworkisindicatedondrawingsandspecifiedinSection
024100.
B. Scopeofalterationsworkisindicatedondrawings.
1.04 WORKBYOWNER
A. OwnerhasawardedacontractforsupplyandinstallationofAccessControls,Environmental
Sensors,andSecurityCameraswhichw illcommenceonduringprojectconstruction.
B. ItemsnotedNIC(NotinContract)willbesuppliedandinstalledbyOwnerafterDateof
SubstantialCompletion. Someitemsinclude:
1. Unitrefrigeratorsandstoves
C. OwnerwillsupplythefollowingforinstallationbyContractor:
1.05 OWNEROCCUPANCY
A. OwnerintendstooccupytheProjectuponSubstantialCompletion.
B. CooperatewithOwnertominimizeconflictandtofacilitateOwner'soperations.
C. ScheduletheWorktoaccommodateOwneroccupancy.
1.06 CONTRACTORUSEOFSITEANDPREMISES
A. ProvideaccesstoandfromsiteasrequiredbylawandbyOwner:
1. EmergencyBuildingExitsDuringConstruction: Keepallexitsrequiredbycodeopen
duringconstructionperiod;providetemporaryexitsignsifexitroutesaretemporarily
altered.
2. Donotobstructroadways,sidewalks,orotherpublicwayswithoutpermit.
1.07 WORKSEQUENCE
A. ConstructWorkinstagesduringtheconstructionperiod:
1. Stage1: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase1".
2. Stage2: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase2".
3. Stage3:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase3".
4. Stage4:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase4".
B. CoordinateconstructionscheduleandoperationswithOwnerandArchitect.
1.08 SPECIFICATIONSECTIONSAPPLICABLETOEVERYCONTRACT
A. Unlessotherwisenoted,provisionsofthesectionslistedbelowapplytoeverycontract.
Specificitemsofworklistedunderindividualcontractdescriptionsconstituteexceptions.
B. Section000103-ProjectDirectory.
C. Section012500-SubstitutionProcedures.
MurrayTowersRehab 011000-9 Summary
D. Section013000-AdministrativeRequirements.
E. Section013216-ConstructionProgressSchedule.
F. Section015000-TemporaryFacilitiesandControls.
G. Section017000-ExecutionandCloseoutRequirements.
H. Section017800-CloseoutSubmittals.
ENDOFSECTION
MurrayTowersRehab 011000-10 Summary
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
General Information Department for this solicitation: Procurement Date Prepared: 07/16/26 Types: IFB Advertisement
State Government of Pennsylvania
Bid Due: 7/30/2026
PW Bid 6716 - PHL 1991.26 Terminal D Holdroom Improvements - Mechanical(Federally Funded)
City of Philadelphia
Bid Due: 7/28/2026
Follow CSS 90331 - Asphalt Repairs - Lock Haven, PA (PA060) Active Contract
DEPT OF DEFENSE
Bid Due: 8/14/2026
Project: 2025 CDBG South Street Improvements Ref. #: Borough of Slatington, Lehigh County
PennBid
Bid Due: 8/07/2026