Murray Tower Comprehensive Rehabilitation Project, AMP-31

Agency: Housing Authority of the City of Pittsburgh
State: Pennsylvania
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: May 5, 2026
Due Date: Jun 2, 2026
Solicitation No: IFB#600-08-26
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Murray Tower Comprehensive Rehabilitation Project, AMP-31

IFB#600-08-26

OPEN

HACP is issuing this Invitation for Bids (“IFB”) for qualified and interested business firms to submit sealed bids to provide Murray Tower Comprehensive Rehabilitation Project, AMP-31.

Issue Date:

May 4, 2026 08:00 am

Meeting Date:

May 19, 2026 10:00 am

Deadline Date:

Jun 2, 2026 10:00 am
Procurement Documents

Add all files


May 4, 2026


May 4, 2026


May 4, 2026


May 4, 2026


May 4, 2026


May 4, 2026


May 4, 2026


May 4, 2026

Attachment Preview

SECTION000102
PROJECTINFORMATION
PART1 GENERAL
1.01 PROJECTIDENTIFICATION
A. ProjectName: HACPMurrayTowers,locatedat2 825MurrayAve,Pittsburgh,PA15217.
B. Architect'sProject#:2338:
C. Owner'sProjectNumber:#04-AMP-31,ManagementNo.7954BPO3827.
2825MurrayAve.
Pittsburgh,Pennsylvania15217.
D. TheOwner,hereinafterreferredtoasHACP
1.02 NOTICETOPROSPECTIVEBIDDERS
A. ThesedocumentsconstituteaNoticeofIntenttoRequestProposalsandaRequestfor
QualificationsfromprospectiveDesign-Buildersforthedesignandconstructionoftheproject
describedbelow.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION-NOTUSED
ENDOFSECTION
MurrayTowersRehab 000102-2 ProjectInformation

SECTION000107
SEALSPAGE
DESIGNPROFESSIONALSOFRECORD
A.ARCHITECT:
1.FUKUIARCHITECTS
2.RA404265
3.RESPONSIBLEFORDIVISON01-49SECTIONSEXCEPTWHEREINDICATEDAS
PREPAREDBYOTHERDESIGNPROFESSIONALSOFRECORD.
B.STRUCTURALENGINEER:
1.PROVIDENCEENGINEERING.
2.PE085703.
3.RESPONSIBLEFOR033000,042200,051200,061753
B.FIRE-PROTECTIONENGINEER:
1.IAMSCONSULTING
2.PE085703
3.RESPONSIBLEFORDIVISION21
C.PLUMBINGENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION22
D.HVACENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION23
E.ELECTRICALENGINEER
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION26-28
ENDOFSECTION
MurrayTowersRehab 000107-3 SealsPage

SECTION000110
TABLEOFCONTENTS
PROCUREMENTANDCONTRACTINGREQUIREMENTS
1.01 DIVISION00--PROCUREMENTANDCONTRACTINGREQUIREMENTS
A. 000101-ProjectTitlePage
B. 000102-ProjectInformation
C. 000107-SealsPage
D. 000115-ListofDrawingSheets
SPECIFICATIONS
2.01 DIVISION01--GENERALREQUIREMENTS
A. 011000-Summary
B. 012000-PriceandPaymentProcedures
C. 012500-SubstitutionProcedures
D. 013000-AdministrativeRequirements
E. 013216-ConstructionProgressSchedule
F. 015000-TemporaryFacilitiesandControls
G. 015100-TemporaryUtilities
H. 015713-TemporaryErosionandSedimentControl
I. 016000-ProductRequirements
J. 017000-ExecutionandCloseoutRequirements
K. 017419-ConstructionWasteManagementandDisposal
L. 017800-CloseoutSubmittals
M. 017900-DemonstrationandTraining
2.02 DIVISION02--EXISTINGCONDITIONS
A. 024100-Demolition
B. 028000 # -AsbestosAbatement
2.03 DIVISION03--CONCRETE
A. 030100-MaintenanceofConcrete
B. 031000-ConcreteFormingandAccessories
C. 032000-ConcreteReinforcing
D. 033000-Cast-in-PlaceConcrete
2.04 DIVISION04--MASONRY
A. 040100-MaintenanceofMasonry
2.05 DIVISION05--METALS
A. 054000-Cold-FormedMetalFraming
B. 055213-PipeandTubeRailings
2.06 DIVISION06--WOOD,PLASTICS,ANDCOMPOSITES
A. 061053-MiscellaneousRoughCarpentry
2.07 DIVISION07--THERMALANDMOISTUREPROTECTION
A. 072100-ThermalInsulation
B. 075400-ThermoplasticMembraneRoofing
MurrayTowersRehab 000110-4 TableofContents

C. 076200-SheetMetalFlashingandTrim
D. 078400-Firestopping
E. 079200-JointSealants
2.08 DIVISION08--OPENINGS
A. 081113-HollowMetalDoorsandFrames
B. 081416-FlushWoodDoors
C. 083100-AccessDoorsandPanels
D. 084126-All-GlassEntrancesandStorefronts
E. 084229-AutomaticEntrances
F. 087100-DoorHardware
2.09 DIVISION09--FINISHES
A. 090561-CommonWorkResultsforFlooringPreparation
B. 092116-GypsumBoardAssemblies
C. 093000-Tiling
D. 095100-AcousticalCeilings
E. 096500-ResilientFlooring
F. 099123-InteriorPainting
2.10 DIVISION10--SPECIALTIES
A. 101419-DimensionalLetterSignage
B. 102600-WallandDoorProtection
C. 102800-Toilet,Bath,andLaundryAccessories
D. 102819-TubandShowerEnclosures
E. 104300-EmergencyAidSpecialties
F. 104400-FireProtectionSpecialties
G. 105613-MetalStorageShelving
H. 108213-ExteriorGrillesandScreens
2.11 DIVISION11--EQUIPMENT
2.12 DIVISION12--FURNISHINGS
A. 122113-HorizontalLouverBlinds
B. 123530-ResidentialCasework
C. 123600-Countertops
2.13 DIVISION13--SPECIALCONSTRUCTION
2.14 DIVISION14--CONVEYINGEQUIPMENT
2.15 DIVISION21--FIRESUPPRESSION
A. 210500-CommonWorkResultsforFireSuppression
B. 211300-Fire-SuppressionSprinklerSystems
2.16 DIVISION22--PLUMBING
A. 220517-SleevesandSleeveSealsforPlumbingPiping
B. 220719-PlumbingPipingInsulation
C. 221005-PlumbingPiping
D. 221006-PlumbingPipingSpecialties
MurrayTowersRehab 000110-5 TableofContents

E. 224000-PlumbingFixtures
F. 224017-BathtubsandShowers
2.17 DIVISION23--HEATING,VENTILATING,ANDAIR-CONDITIONING(HVAC)
A. 230513-CommonMotorRequirementsforHVACEquipment
B. 230529-HangersandSupportsforHVACPipingandEquipment
C. 230593-Testing,Adjusting,andBalancingforHVAC
D. 230713-DuctInsulation
E. 230800-CommissioningofHVAC
F. 232300-RefrigerantPiping
G. 233100-HVACDuctsandCasings
H. 233423-HVACPowerVentilators
I. 237313-ModularIndoorCentral-StationAir-HandlingUnits
J. 238113-PackagedTerminalAir-Conditioners
K. 238119-Self-ContainedAir-Conditioners
L. 238126.13-Small-CapacitySplit-SystemAirConditioners
2.18 DIVISION25--INTEGRATEDAUTOMATION
2.19 DIVISION26--ELECTRICAL
A. 260505-SelectiveDemolitionforElectrical
B. 260519-Low-VoltageElectricalPowerConductorsandCables
C. 260526-GroundingandBondingforElectricalSystems
D. 260583-WiringConnections
E. 260923-LightingControlDevices
F. 262413-Switchboards
G. 262416-Panelboards
H. 262726-WiringDevices
I. 265100-InteriorLighting
J. 265600-ExteriorLighting
2.20 DIVISION27--COMMUNICATIONS
2.21 DIVISION28--ELECTRONICSAFETYANDSECURITY
A. 284600-FireDetectionandAlarm
2.22 DIVISION31--EARTHWORK
A. 311000-SiteClearing
B. 312200-Grading
C. 312316.13-Trenching
2.23 DIVISION32--EXTERIORIMPROVEMENTS
A. 321216-AsphaltPaving
B. 321313-ConcretePaving
C. 321710-ParkingBumpersandManufacturedTraffic-CalmingDevices
D. 321723-PavementMarkings
E. 321731-SteelGuardrail
F. 323113-ChainLinkFencesandGates
MurrayTowersRehab 000110-6 TableofContents

G. 323119-DecorativeMetalFencesandGates
H. 323223-SegmentalRetainingWalls
I. 323300-SiteFurnishings
J. 329219-Seeding
K. 329300-Plants
2.24 DIVISION33--UTILITIES
2.25 DIVISION34--TRANSPORTATION
2.26 DIVISION40--PROCESSINTEGRATION
2.27 DIVISION46--WATERANDWASTEWATEREQUIPMENT
MurrayTowersRehab 000110-7 TableofContents


MurrayTowersRehab 000115-8 ListofDrawingSheets
SECTION 000115
LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
1.01
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Drawing
Index Page of the separately bound drawing set titled Murray Towers Rehab, dated April
24,2026, as modified by subsequent Addenda and Contract Modifications.
END OF SECTION

SECTION011000
SUMMARY
PART1 GENERAL
1.01 PROJECT
A. ProjectName: MurrayTowersRehab
B. Owner'sName: HACP.
C. Architect'sName: FukuiArchitects.
D. AdditionalProjectcontactinformationisspecifiedinSection000103-ProjectDirectory.
1.02 CONTRACTDESCRIPTION
A. ContractType: Multipleprimecontracts,eachbasedonaStipulatedPriceasdescribedin
Document005000-ContractingFormsandSupplements.
1.03 DESCRIPTIONOFALTERATIONSWORK
A. ScopeofdemolitionandremovalworkisindicatedondrawingsandspecifiedinSection
024100.
B. Scopeofalterationsworkisindicatedondrawings.
1.04 WORKBYOWNER
A. OwnerhasawardedacontractforsupplyandinstallationofAccessControls,Environmental
Sensors,andSecurityCameraswhichw illcommenceonduringprojectconstruction.
B. ItemsnotedNIC(NotinContract)willbesuppliedandinstalledbyOwnerafterDateof
SubstantialCompletion. Someitemsinclude:
1. Unitrefrigeratorsandstoves
C. OwnerwillsupplythefollowingforinstallationbyContractor:
1.05 OWNEROCCUPANCY
A. OwnerintendstooccupytheProjectuponSubstantialCompletion.
B. CooperatewithOwnertominimizeconflictandtofacilitateOwner'soperations.
C. ScheduletheWorktoaccommodateOwneroccupancy.
1.06 CONTRACTORUSEOFSITEANDPREMISES
A. ProvideaccesstoandfromsiteasrequiredbylawandbyOwner:
1. EmergencyBuildingExitsDuringConstruction: Keepallexitsrequiredbycodeopen
duringconstructionperiod;providetemporaryexitsignsifexitroutesaretemporarily
altered.
2. Donotobstructroadways,sidewalks,orotherpublicwayswithoutpermit.
1.07 WORKSEQUENCE
A. ConstructWorkinstagesduringtheconstructionperiod:
1. Stage1: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase1".
2. Stage2: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase2".
3. Stage3:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase3".
4. Stage4:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase4".
B. CoordinateconstructionscheduleandoperationswithOwnerandArchitect.
1.08 SPECIFICATIONSECTIONSAPPLICABLETOEVERYCONTRACT
A. Unlessotherwisenoted,provisionsofthesectionslistedbelowapplytoeverycontract.
Specificitemsofworklistedunderindividualcontractdescriptionsconstituteexceptions.
B. Section000103-ProjectDirectory.
C. Section012500-SubstitutionProcedures.
MurrayTowersRehab 011000-9 Summary

D. Section013000-AdministrativeRequirements.
E. Section013216-ConstructionProgressSchedule.
F. Section015000-TemporaryFacilitiesandControls.
G. Section017000-ExecutionandCloseoutRequirements.
H. Section017800-CloseoutSubmittals.
ENDOFSECTION
MurrayTowersRehab 011000-10 Summary

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

General Information Department for this solicitation: Procurement Date Prepared: 07/16/26 Types: IFB Advertisement

State Government of Pennsylvania

Bid Due: 7/30/2026

PW Bid 6716 - PHL 1991.26 Terminal D Holdroom Improvements - Mechanical(Federally Funded)

City of Philadelphia

Bid Due: 7/28/2026

Follow CSS 90331 - Asphalt Repairs - Lock Haven, PA (PA060) Active Contract

DEPT OF DEFENSE

Bid Due: 8/14/2026

Project: 2025 CDBG South Street Improvements Ref. #: Borough of Slatington, Lehigh County

PennBid

Bid Due: 8/07/2026