Municipality of Norristown Historical Façade Improvements - 129 E Main Street

Agency: Norristown borough
State: Pennsylvania
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238910 - Site Preparation Contractors
Posted Date: Apr 10, 2026
Due Date: Apr 29, 2026
Solicitation No: 224020
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: 224020
Bid Title: Municipality of Norristown Historical Façade Improvements - 129 E Main Street
Category: BIDS
Status: Open
Bid Recipient: Municipality of Norristown - Jayne Musonye
Description:

The project consists of historical façade improvements at 129 E. Main Street in Norristown, Pennsylvania. Work includes exterior masonry repair and maintenance such as raking, repointing, and cleaning of all brick masonry elevations, along with the repair or replacement of deteriorated or cracked brick units. The intent is to restore the building façade while maintaining its historical character and structural integrity.

Publication Date/Time:
4/10/2026 12:00 AM
Closing Date/Time:
4/29/2026 4:00 PM
Pre-bid Meeting:
4/15/2026
Contact Person:
Project Architect:
Name: Amy Baade
Email: ABaade@lga-partners.com

Municipality of Norristown Planning and Development Department
Name: Jayne Musonye
Email: jmusonye@norristown.gov

Download Available:
Yes
Fee:
$10
Plan & Spec Available:
Hard copies of plan and specifications can be picked up at the Municipality of Norristown’s Department of Planning & Municipal Development for a fee.
Business Hours:
8:30am-4:30pm
Qualifications:
Bidders must be properly licensed and qualified under applicable laws governing their respective trades and demonstrate experience in performing similar masonry restoration work. Contractors shall be capable of obtaining all required insurance and must comply with all federal, state, and local regulations, including safety, labor, and nondiscrimination requirements. Evidence of the ability to complete the work in accordance with the contract documents is required
Special Requirements:
A mandatory pre-bid conference will be held at the project site, and attendance is required for all prospective bidders. Bids must be submitted in sealed envelopes on the forms provided, prior to the specified deadline, and clearly labeled per instructions. Contractors must review all contract documents, visit the site, and account for all existing conditions in their bids. All work must comply with governing regulations and project specifications, and no late submissions will be accepted.
Miscellaneous:
All project-related questions must be submitted via email to the Architect’s representative, Amy Baade, with the project name clearly indicated in the subject line. No questions will be accepted by phone, and all inquiries must be submitted prior to the stated deadline. Additional coordination may be directed through the Municipality of Norristown’s Department of Planning & Municipal Development.
Related Documents:

Attachment Preview

129 E MAIN STREET
NORRISTOWN, PA 19401
BID SET
0041//2007//22002266
DRAWING LIST
Sheet Number Sheet Name Sheet Issue Date
G-001 COVER SHEET 0014//2007//22002266
A-011 BRICK RESTORATION SPECIFICATIONS 0014//2007//22002266
A-012 BRICK CLEANING SPECIFICATIONS 0014//2007//22002266
A-201 BUILDING ELEVATIONS 0014//2007//22002266
A-202 EAST ELEVATION 0014//2007//22002266
A-203 WEST ELEVATION 0014//2007//22002266
GRANT MANAGER:
Municipality of Norristown
235 East Airy Street
Norristown, PA 19401 -5003
Contact: Ngoc Gaiser
PROJECT DESCRIPTION
THIS PROJECT ENTAILS EXTERIOR MASONRY REPAIR AND MAINTENANCE AT 129 E.
MAIN STREET, NORRISTOWN. THE WORK INCLUDES RAKING, REPOINTING, AND
CLEANING ALL BRICK MASONRY ELEVATIONS, REPAIR/REPLACEMENT OF
DETERIORATED OR CRACKED BRICK MASONRY UNITS.
PROPERTY OWNER:
129 E Main Street
Norristown, PA 19401
Contact: John George
BASE BID: RAKE, REPOINT, AND CLEAN ALL BRICK MASONRY AND PERFORM
ADDITIONAL MASONRY REPAIR WORK AS INDICATED ON THE DRAWINGS FOR ALL
FOUR BUILDING ELEVATIONS.
ARCHITECT:
Landmarks SGA, LLC
533 Greenwood Avenue
Jenkintown, PA 19046
Contact: Jessica Stuck, AIA
DEDUCT ALTERNATE: BRICK MASONRY AT NORTH AND WEST ELEVATIONS TO
REMAIN AS - IS; NO WORK PERFORMED AT THESE FACADES.
FACADE
IMPROVEMENTS
129 E MAIN STREET
NORRISTOWN, PA 19401
G - 001

PROJECT TEAM
PROJECT DESCRIPTION
THIS PROJECT ENTAILS EXTERIOR MASONRY REPAIR AND MAINTENANCE AT 129 E.
MAIN STREET, NORRISTOWN. THE WORK INCLUDES RAKING, REPOINTING, AND
CLEANING ALL BRICK MASONRY ELEVATIONS, REPAIR/REPLACEMENT OF
DETERIORATED OR CRACKED BRICK MASONRY UNITS.
ALTERNATES:
DEDUCT ALTERNATE #1: SCOPE OF WORK LIMITED TO PRIMARY ELEVATIONS
BASE BID: RAKE, REPOINT, AND CLEAN ALL BRICK MASONRY AND PERFORM
ADDITIONAL MASONRY REPAIR WORK AS INDICATED ON THE DRAWINGS FOR ALL
FOUR BUILDING ELEVATIONS.
DEDUCT ALTERNATE: BRICK MASONRY AT NORTH AND WEST ELEVATIONS TO
REMAIN AS-IS; NO WORK PERFORMED AT THESE FACADES.
ISSUE DATE:
LANDMARKS SGA PROJECT NO.
N
O
I
T
C
U
R
T
S
N
O
C
R
O
F
T
O
N
VICINITY MAP
PROJECT SITE
T
E PENN
ST
E
K
AL B S
D
REVISIONS
T
S
N
E
G
R E E PENN
ST
E MAIN
ST
T
S
B
AL
K
E
D E MAIN
ST
NOTE: DO NOT SCALE FROM DRAWINGS.
VERIFY ALL DIMENSIONS ON SITE.
T
S
MILL
tvr.dehcated_lartneC_32R_tS
niaM
E
921_NWOTSIRRON\sgniwarD
40\niaM
E
921
10\stcejorP
laudividnI
30\020422_margorP
edacaF
nwotsirroN
84542\AGS
skramdnaL\stcejorPweN\SAN-GL\\
MP
92:84:3
6202/02/1
MUNICIPALITY OF NORRISTOWN
FACADE IMPROVEMENTS
129 E MAIN STREET
NORRISTOWN, PA 19401
BID SET
DRAWING LIST
Sheet
0041//2007//22002266 Number Sheet Name Sheet Issue Date
GENERAL
G-001 COVER SHEET 0014//2007//22002266
ARCHITECTURAL
A-011 BRICK RESTORATION SPECIFICATIONS 0014//2007//22002266
A-012 BRICK CLEANING SPECIFICATIONS 0014//2007//22002266
A-201 BUILDING ELEVATIONS 0014//2007//22002266
A-202 EAST ELEVATION 0014//2007//22002266
A-203 WEST ELEVATION 0014//2007//22002266
GRANT MANAGER:
Municipality of Norristown
235 East Airy Street
Norristown, PA 19401-5003
Contact: Ngoc Gaiser
PROPERTY OWNER:
129 E Main Street
Norristown, PA 19401
Contact: John George
ARCHITECT:
Landmarks SGA, LLC
533 Greenwood Avenue
Jenkintown, PA 19046
Contact: Jessica Stuck, AIA
BID SET
0014//2007//22002266
LANDMARKS PROJECT NO. 222244002200
FACADE
IMPROVEMENTS
129 E MAIN STREET
NORRISTOWN, PA 19401
MUNICIPALITY OF NORRISTOWN
NO. DATE DESCRIPTION
COVER SHEET
G-001

PART 1 -
1.01
A.
PART 2 -
2.01
A.
RELATED DOCUMENTS
DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING G ENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION
SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
SECTION SUMMARY
EXTERIOR APPLICATIONS:
1.
2.
3.
MASONRY MATERIALS
FACE BRICK AND ACCESSORIES: PROVIDE FACE BRICK AND ACCESSORIE S, INCLUDING UNITS FOR LINTELS, ARCHES, CORNERS, AND
OTHER SPECIAL GROUND, CUT, OR SAWED SHAPES WHERE REQUIRED TO COMPLETE MASONRY RESTORATION WORK
1. PROVIDE UNITS WITH COLOR, SURFACE TEXTURE, AND PHYSICAL PRO PERTIES TO MATCH EXISTING FACE BRICK OR BLEND OF
BRICK. FACE BRICK SHALL CONFORM TO ASTM C 216, TYPE SW, GRAD
HAIRLINE CRACKING WITHIN MORTAR OR MORTAR SEPARATION AT EDGE OF A JOINT IS UNACCEPTABLE. COMPLETELY REMOVE
SUCH MORTAR AND REPOINT.
1.02
A.
3.07
A.
PATCHIN
PATCHING AND REPAIR OF MISCELLANEOUS CRACKS IN EXISTING FACAD E, INCLUDING FACE BRICK.
1. REPAIR FACADE CRACKS IN FACE BRICK UNLESS DIRECTED ON DRAW INGS TO "REBUILD" CRACKED AREAS OR "SAW CUT" CRACKED
AREAS. (ASSUME 100 LINEAR FEET OF REPAIR)
REPLACE OR REPAIR BRICKWORK IN DESIGNATED AREAS
REPOINTING OF DESIGNATED AREAS OF BRICKWORK
DISMANTLE AND REBUILD AREAS SHOWN; NEW BRICK TO MATCH EXIS TING FINISH BRICK ON EXTERIOR AND COMMON BRICK O
INTERIOR
DEFINITION
REPOINTING: THE PROCESS OF RAKING OUT (REMOVING) MORTAR ANDR EPLACING IT WITH NEW MORTAR
PATCH POINTING: THE PROCESS OF PLACING NEW MORTAR IN EXISTING JOINT SPACES, WHICH HAVE PREVIOUSLY BEEN RAKED OU
THIS TERM DOES NOT INCLUDE THE RAKING OUT PROCESS.
GROUT [TUCK] POINTING: THE PROCESS OF TOUCHING UP EXISTING MO RTAR JOINT BY FILLING IN RECESSES WITH NEW MORTAR,
WITHOUT FIRST RAKING OUT THE JOINTS.
1.
2.02
A.
MORTAR MATERIALS; PORTLAND CEMENT LIME MORTAR
PORTLAND CEMENT: ASTM C 150, TYPE I. LOW -ALKALI, NON- STAINING C EMENT
1. FOR STONEWORK PROVIDE NON -STAINING WHITE CEMENT COMPLYIN G WITH STAINING REQUIREMENT OF ASTM C 91 FOR NOT
MORE THAN 0.03% WATER SOLUBLE ALKALI.
CRACK SIZE (WIDTH)
1/64" (.39MM) OR LESS
PROCEDURE
REPOINT CRACKED MORTAR JOINTS.
NO REPAIR OR REPLACEMENT REQUIRED.
REPOINT CRACKED MORTAR JOINTS.
PRESSURE INJECT GROUT INTO CRACKS OR REPLACE MATE RIAL.
1.03
A.
B.
B.
C.
HYDRATED LIME: ASTM C 207, TYPE S
FACTORY PREPARED LIME PUTTY: ASTM C 1489.
QUICKLIME: ASTMC 5, PULVERIZED LIME
AGGREGATE FOR MORTAR: ASTM C 144, UNLESS OTHERWISE INDICATED
1. FOR POINTING MORTAR, PROVIDE SAND WITH ROUNDED EDGES.
2. MATCH SIZE, TEXTURE AND GRADATION OF EXISTING MORTAR AGGR EGATE AS CLOSELY AS POSSIBLE.
WATER: CLEAN, FREE OF OILS, ACIDS, ALKALINE AND ORGANIC MATTER.
COLORED MORTAR: AS FOLLOWS:
1.
3.08
B.
C.
D.
3.09
A.
APPLICATION OF JOINT SEALANT
REFER TO SECTION 079200 -J OINT SEALANTS.
REPLACE DETERIORATED SEALANT CRACKED SEALANT, MISSING SEALAN T, AND SEALANT NOT BONDED TO ADJACENT SURFACES.
REPLACE ENTIRE AREAS OF SEALANT WHERE INDICATED ON DRAWINGS.
MISCELLANEOUS WOR
PAINTING STEEL UNCOVERED DURING THE WORK, INSPECT STEEL EXPOS ED DURING MASONRY REMOVAL. WHERE ARCHITECT
DETERMINES THAT IT IS STRUCTURAL, OR FOR OTHER REASONS CANNOT BE TOTALLY REMOVED, PREPARE AND PAINT IT AS FOLLOWS:
1.
MATCH EXISTING: NEW MATERIALS AND PRODUCTS SHALL MATCH EXI STING IN MATERIAL, SIZE, SHAPE, PROFILE,
CONFIGURATION, COLOR, TEXTURE. TOOLING, QUALITY OF WORKMAN SHIP AND VISUAL APPEARANCE. REPLACEMENT MATERIAL
SHALL NOT BE VISUALLY DISCERNABLE FROM ADJACENT EXISTING MA
WEATHERING OR AGING.
E.
F.
WHEN ATTEMPTING TO MATCH EXISTING MORTAR, THE CONTRACTOR SHALL SUBMIT TO A TESTING LABORATORY, A SAMPL
OF THE EXISTING MORTAR TO DETERMINE ITS CONTENTS.
UPON DETERMINATION OF THE CONTENTS OF THE EXISTING MORTAR, THE CONTRACTOR WILL PRODUCE A WALL MOCK- UP
USING THE FORMULA FOR THE EXISTING MORTAR TO CREATE NEW MORT AR. THE ARCHITECT WILL THEN REVIEW THE MOCK
UP FOR APPROVAL
SALVAGE/RETAIN: CAREFULLY REMOVE MATERIALS OF COMPONENTS IN A MANNER THAT WILL PERMIT REUSE OR REINSTALLATION I
THIS PROJECT
REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF -
REMOVED AND SALVAGED OR REMOVED AND REINSTALLED.
DISASSEMBLE AND SALVAGE:
TO OWNER.
DISASSEMBLE AND REINSTALL: CAREFULLY DETACH ITEMS FROM EXISTIN G CONSTRUCTION, PREPARE FOR REUSE, AND REINSTALL
WHERE INDICATED
EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARENO
OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR R EMOVED AND REINSTALLED.
DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FR OM A SURFACE, USING GENTLE METHODS AND EQUIPMENT
PREVENT DAMAGE TO THE ITEM AND SURFACES; DISPOSING OF ITEMS UN LESS INDICATED TO BE SALVAGED
SUBMITTALS
PRODUCT DATA FOR EACH PRODUCT INDICATED INCLUDING RECOMMEND ATIONS FOR THEIR APPLICATION AND USE. INCLUDE TEST
REPORTS AND CERTIFICATIONS SUBSTANTIATING THAT PRODUCTS COMP LYWITH REQUIREMENTS.
SAMPLES FOR VERIFICATION PURPOSES, PRIOR TO ERECTING THE MOCKU P, OF THE FOLLOWING:
1. EACH NEW EXPOSED MASONRY MATERIAL TO BE USED FOR REPLACIN G EXISTING MATERIALS. INCLUDE IN EACH SET OF SAMPLE
THE FULL RANGE OF COLORS AND TEXTURES TO BE EXPECTED IN THE COMPLETED WORK.
PROVIDE STRAPS OR PANELS CONTAINING NOT LESS THAN FOUR BRICK U NITS
2. EACH TYPE OF MORTAR FOR POINTING AND MASONRY REBUILDING AN DREPAIR IN THE FORM OF SAMPLE MORTAR STRIPS 6 INC
(152MM) LONG BY 1/2 INCH (12MM) WIDE SET IN ALUMINUM OR PLAS TIC CHANNELS.
EACH TYPE OF REPAIR ANCHOR.
REMOVE PAINT, RUST, AND OTHER CONTAMINANTS ACCORDING TO SSP C- SP 2, "HAND TOOL CLEANING" AS APPLICABLE TO MEET
PAINT MANUFACTURER'S RECOMMENDED PREPARATION.
IMMEDIATELY PAINT EXPOSED STEEL WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN
INSTRUCTIONS AND WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDED RATE OF APPLICATION (DRY FILM THICKNESS PER
COAT).
IF ON INSPECTION AND RUST REMOVAL, THE CROSS SECTION OF A S TEEL MEMBER IS FOUND TO BE REDUCED FROM RUST BY
MORE THAN 1/8 INCH (3 MM) NOTIFY ARCHITECT BEFORE PROCEEDING.
CAREFULLY DETACH FROM EXISTING CONS TRUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELI
COLORED PORTLAND CEMENT -L IME MIX.
THE RIVERTON CORPORATION "RIVERTON PORTLAND CEMENT LIME C USTOM COLOR", FRONT ROYAL, VA (540)- 635 -4131
GLEN -GERY/OLDCASTLE CORPORATION "COLOR MORTAR BLEND", WYOMI SSING, PA, HYPERLINK
"HTTP://WWW.GLENGERYBRICK.COM"WWW.GLENGERYBRICK.COM (610) -3 74 - 4011
LEHIGH PORTLAND CEMENT CO. "LEHIGH CUSTOM COLOR PORTLAND/ LIME", ALLENTOWN, PA, WWW.LEHIGHCEMENT.COM
(800) -523 -5488.
MORTAR PIGMEN
SECTION 040123 .10
AFTER MORTAR HAS FULLY HARDENED, THOROUGHLY CLEAN EXPOSED MA SONRY SURFACES OF EXCESS MORTAR AND FOREIGN
MATTER; USE WOOD SCRAPERS, STIFF - NYLON OR - FIBER BRUSHES, AND CLEAN WATER, APPLIED BY LOW PRESSURE SPRAY.
1. DO NOT USE METAL SCRAPERS OR BRUSHES.
2.
CLEAN ADJACENT NON - MASONRY SURFACES. USE DETERGENT AND SOFT BRUSHES OR CLOTHS.
CLEAN MORTAR AND DEBRIS FROM ROOF; REMOVE DEBRIS FROM GUTTER S AND DOWNSPOUTS. RINSE OFF ROOF AND FLUSH GUTTERS
AND DOWNSPOUTS.
REMOVE MASKING MATERIALS, LEAVING NO RESIDUES THAT COULD TRA
DAVIS COLORS "TRUE TONE MORTAR COLORS", LOS ANGELES, CA, HY PERLINK
"HTTP://WWW.DAVISCOLORS.COM"WWW.DAVISCOLORS.COM (800)- 356 -4
SOLOMON GRIND - CHEM SERVICES, INC. "SGS MORTAR COLORS", SPR INGFIELD, IL, HYPERLINK
"HTTP://WWW.SOLOMOMCOLORS.COM"WWW.SOLOMOMCOLORS.COM (800)- 6 24 -0261
1.04
A.
B.
C.
2.03
A.
MORTAR MIXE
MEASUREMENT AND MIXING: MEASURE CEMENTITIOUS AND AGGREGATE MATERIAL IN A DRY CONDITION BY VOLUME OR EQUIVALENT
WEIGHT. DO NOT MEASURE BY SHOVEL; USE KNOWN MEASURE. MIX MA TERIALS IN A CLEAN MECHANICAL BATCH MIXER.
MIXING POINTING MORTAR: THOROUGHLY MIX CEMENTITIOUS AND AGGR EGATE MATERIALS TOGETHER BEFORE ADDING ANY WATER.
THEN MIX AGAIN, ADDING ONLY ENOUGH WATER TO PRODUCE A DAMP, U NWORKABLE MIX WHICH WILL RETAIN ITS FORM WHEN
PRESSED INTO A BALL. MAINTAIN MORTAR IN THIS DAMPENED CONDITI ON FOR 1 TO 2 HOURS. ADD REMAINING WATER IN SMALL
PORTIONS UNTIL MORTAR OF DESIRED CONSISTENCY IS REACHED. USE MORTAR WITHIN 30 MINUTES OF FINAL MIXING; DO NOT RE-
TEMPER OR USE PARTIALLY HARDENED MATERIAL.
1.
3.
QUALIFICATION DATA FOR FIRMS AND PERSONS SPECIFIED IN THE "QUAL ITY ASSURANCE" ARTICLE TO DEMONSTRATE THEIR
CAPABILITIES AND EXPERIENCE. INCLUDE A LIST OF COMPLETED PROJEC TS WITH PROJECT NAMES, ADDRESSES, NAMES OF
ARCHITECTS AND OWNERS, AND OTHER INFORMATION SPECIFIED
1.
POINTING MORTAR: ONE PART PORTLAND CEMENT, ONE PART LIME A ND SIX PARTS MORTAR AGGREGATE. COMPLY WITH ASTM
C 270, PROPORTION SPECIFICATION, TYPE N, 750 P.S.I.
REBUILDING MORTAR: COMPLY WITH ASTM C 270, PROPORTION SPEC IFICATION
RESTORATION PROGRAM FOR EACH PHASE OF THE RESTORATION PRO CESS, INCLUDING PROTECTION OF SURROUNDING
MATERIALS ON BUILDING AND SITE DURING OPERATIONS. DESCRIBE D IN DETAIL THE MATERIALS, METHODS, AND EQUIPMENT
BE USED FOR EACH PHASE OF THE RESTORATION WORK.
IF ALTERNATIVE METHODS AND MATERIALS TO THOSE INDICATED ARE
PROVIDE A WRITTEN DESCRIPTION, INCLUDING EVIDENCE OF SUCCES
TESTING PROGRAM TO DEMONSTRATE THEIR EFFECTIVENESS FOR THI S PROJECT.
A. ABOVE GRADE MORTAR: TYPE "N"
2.04
A.
MISCELLANEOUS MATERIALS
BRICK CONSOLIDATION TREATMENT: BINDER AND FIXING AGENT MADE F ROM PURE, LIQUID POTASSIUM SILICATE.
1. KEIM MINERAL COATINGS OF AMERICA, INC.; "KEIM FIXATIV" CHARLOTTE, NC, WWW.KEIM -USA.COM (704) 588 - 4811
1.05
A.
QUALITY ASSURANCE
RESTORATION SPECIALIST: ENGAGE AN EXPERIENCED MASONRY RESTOR ATION AND CLEANING FIRM THAT HAS SPECIALIZED IN TH
TYPES OF WORK REQUIRED FOR THIS PROJECT.
1.
PART 3 -
3.01
A.
GENERAL
MASONRY RESTORATION MATERIALS SHALL BE INSTALLED IN STRICT ACC ORDANCE WITH THE MANUFACTURER'S CURRENT, PRINTED
INSTRUCTIONS.
BUILDING SURVEY
CONTRACTOR SHALL SURVEY MASONRY JOINTS IN DETAIL TO DETERMINE REPAIR AND REPLACEMENT WORK NECESSARY FOR
RESTORATION.
BEFORE PROCEEDING WITH REPAIR FOR REPOINTING WORK THE CONTRA CTOR SHALL CAREFULLY EXAMINE ALL MASONRY AND STONE
WORK MUST BE PERFORMED BY A FIRM HAVING NOT LESS THAN 5 YEA
RESTORATION PROJECTS AND EMPLOYING PERSONNEL SKILLED IN TH E RESTORATION PROCESSES AND OPERATIONS INDICATED
FIELD SUPERVISION: REQUIRE RESTORATION SPECIALIST FIRM TO M AINTAIN AN EXPERIENCED FULL - TIME SUPERVISOR ON THE
JOB SITE DURING TIMES THAT CLAY MASONRY RESTORATION AND CLE ANING ARE IN PROGRESS.
FIELD -CONSTRUCTION MOCKUPS: PRIOR TO STARTING MASONRY RESTO RATION, PREPARE THE FOLLOWING SAMPLE TEST AREAS O
THE BUILDING WHERE DIRECTED BY ARCHITECT. PREPARE SAMPLE TEST A REAS USING SAME MATERIALS AND METHODS PROPOSED
FOR THE WORK, AND UNDER SAME WEATHER CONDITIONS TO BE EXPECT EDDURING THE RESTORATION. OBTAIN ARCHITECT'S
ACCEPTANCE OF VISUAL QUALITIES BEFORE PROCEEDING WITH MASONRY RESTORATION. RETAIN ACCEPTABLE TEST AREAS IN AN
UNDISTURBED CONDITION, SUITABLY MARKED, DURING CONSTRUCTION ASA STANDARD FOR JUDGING THE COMPLETED WORK.
1. NOTIFY OWNER ONE WEEK IN ADVANCE OF DATES AND TIMES WHEN S AMPLE TEST AREAS WILL BE PREPARED. PREPARE A MINIM
OF THREE TEST AREAS SHOWING VARIOUS RESTORATION METHODS.
REPOINTING: PREPARE 2 SEPARATE SAMPLE AREAS OF APPROXIMATEL
TYPE OF REPOINTING REQUIRED; ONE FOR DEMONSTRATING METHODS AN D QUALITY OF WORKMANSHIP EXPECTED IN REMOVAL
MORTAR FROM JOINTS AND THE OTHER FOR DEMONSTRATING QUALITY OF MATERIALS AND WORKMANSHIP EXPECTED IN POINTI
MORTAR JOINTS. SEPARATE SAMPLES OF EACH TYPE ARE REQUIRED F ORSTONEWORK AND FOR BRICKWORK.
MASONRY REPAIR: PREPARE SAMPLE PANELS OF SIZE INDICATED FOR
PATCHED, REBUILT OR REPLACED. ERECT MOCK - UP PANELS INTO AN
DEMONSTRATE QUALITY OF MATERIALS AND WORKMANSHIP. SEPARATE SA MPLES OF EACH TYPE ARE REQUIRED FOR STONEWOR
AND FOR BRICKWORK.
3.02
A.
SAW CUT SPALLED AREA TO SOUND MASONRY WITH
SQUARE EDGES TO 1/8" MINIMUM DEPTH AND TO DEPTH
AS SPECIFIED BY PATCHING COMPOUND MANUFACTURER,
FEATHERING OF PATCHING COMPOUND IS NOT
ACCEPTABLE, ROUGHEN EXPOSED BRICK SURFACE TO
UNIFORM DEPTH TO RECEIVE PATCHING COMPOUND
3.03
A.
PREPARATION
PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUI LDING WHOSE MASONRY SURFACES ARE RESTORED,
BUILDING SITE, AND SURROUNDING BUILDINGS FROM INJURY RESULTIN GFROM MASONRY RESTORATION WORK.
UNUSED ANCHOR REMOVAL
1.
REMOVE MASONRY ANCHORS, BRACKETS, WOOD NAILERS, AND OTHE R EXTRANEOUS ITEMS NO LONGER IN USE UNLESS
IDENTIFIED AS HISTORICALLY SIGNIFICANT OR INDICATED TO REMAI
REMOVE ITEMS CAREFULLY TO AVOID SPALLING OR CRACKING MASO NRY. WHERE DIRECTED, IF AN ITEM CANNOT BE REMOVED
WITHOUT DAMAGING SURROUNDING MATERIAL, DO THE FOLLOWING:
CUT OR GRIND OFF ITEM APPROXIMATELY 3/4 INCH (20 MM) B ENEATH SURFACE AND CORE DRILL A RECESS OF SAME DEPT
IN SURROUNDING MASONRY AS CLOSE AROUND ITEM AS PRACTICAL.
IMMEDIATELY PAINT EXPOSED END OF ITEM WITH TWO COATS OF AN TIRUST COATING, FOLLOWING COATING
MANUFACTURER'S WRITTEN INSTRUCTIONS AND WITHOUT EXCEEDING MA NUFACTURER'S RECOMMENDED DRY FILM
THICKNESS PER COAT. KEEP PAINT OFF SIDES OF RECESS.
PATCH THE HOLE WHERE EACH ITEM WAS REMOVED UNLESS DIRECTE D TO REMOVE AND REPLACE THE MASONRY UNIT
RAKE OUT EXIST. MORTAR JOINTS
1.5 TIMES THE WIDTH OF THE JOINT,
MIN. OR TO SOUND MORTAR, PLACE
NEW MORTAR SOLID TO SOUND
MORTAR, MATCH THE STRIKE STYLE
OF EXIST. ORIGINAL JOINTS
AS IDENTIFIED BY THE ARCHITEC
INSTALL STAINLESS STEEL MESH OR WIRE LATH
AT AREA OF REPAIR, SECURE WITH STAINLESS STEE
SCREWS INTO SOUND MASONRY.
PREPARE EXPOSED SURFACE AND APPLY
MORTAR PATCHING COMPOUND ACCORDING TO
MANUFACTURER'S SPECIFICATIONS, MATCH EXISTING
BRICK COLOR, TOOL SURFACE TO MATCH PROFILE AND
SURFACE TEXTURE OF THE EXISTING MATERIAL.
SAMPLE REQUIRED FOR THE REVIEW AND ACCEPTANCE
OF THE ARCHITECT AND OWNER.
REFERENCES: U.S. DEPARTMENT OF THE INTERIOR, HERITAGE CONSERVA
1. REPOINTING MORTAR JOINTS IN HISTORIC BRICK BUILDINGS.
BRICK INDUSTRY ASSOCIATION (BIA) TECHNICAL NOTES ON BRICK CONS TRUCTION
PROJECT/SITE CONDITIONS
PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUIL DING WHOSE MASONRY SURFACES ARE BEING RESTORED
BUILDING SITE, AND SURROUNDING BUILDINGS FROM INJURY RESULTING FROM MASONRY RESTORATION WORK. ERECT TEMPORAR
PROTECTION COVERS AS REQUIRES.
DO NOT REPOINT MORTAR JOINTS OR REPAIR MASONRY UNLESS AIR TEM PERATURES ARE BETWEEN 40 DEGREES F (4 DEGREES C) A
80 DEGREES F (27 DEGREES C) AND WILL REMAIN SO FOR AS LEAST 48H OURS AFTER COMPLETION OF WORK. WHEN TEMPERATURE
FALLS BELOW 32 DEGREES F (0 DEGREES C), PROVIDE A TEMPORARY ENC LOSURE WORK AREA, DAY AND NIGHT; PROVIDE TEMPORA
HEAT.
HOT WEATHER REQUIREMENTS: PROTECT RESTORATION WORK WHEN TEM PERATURE AND HUMIDITY CONDITIONS PRODUCE EXCESS
EVAPORATION OF WATER FROM MORTAR AND PATCHING MATERIALS. PRO
COOLED MATERIALS AS REQUIRED. DO NOT APPLY MORTAR TO SUBSTRAT
ABOVE.
PREVENT GROUT OR MORTAR USED IN REPOINTING AND REPAIR WORK FR OM STAINING FACE OF SURROUNDING MASONRY AND OTH
SURFACES. REMOVE IMMEDIATELY GROUT AND MORTAR IN CONTACT WIT HEXPOSED MASONRY AND OTHER SURFACES.
PROTECT SILLS, LEDGES AND PROJECTIONS FROM MORTAR DROPPINGS.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING HARDNESSO
TAKE GREAT CARE TO PREVENT DAMAGE TO EXISTING MATERIALS. USET HE GENTLEST MEANS AND METHODS AVAILABLE TO CARRY
OUT THE WORK INDICATED AND SPECIFIED. TEST AND PRACTICE MEANS
DETERMINED THAT THEY CAN BE CARRIED OUT WITHOUT DAMAGE TO MA TERIALS SCHEDULED TO REMAIN.
PRECONSTRUCTION TESTING
PRECONSTRUCTION MORTAR TESTING: ANALYSIS OF EXISTING BEDDING
MORTAR FROM WITHIN JOINTS AT FIVE [5] LOCATIONS DESIGNATED BY P ROFESSIONAL OR TESTING SERVICE.
TEMPORARY PATCH: AS DIRECTED BY PROFESSIONAL, PROVIDE TEMPORA
LOCATIONS FROM WHICH EXISTING SAMPLES WERE TAKEN.
PROVIDE RECOMMENDED REPLICATION MIX TO MATCH COLOR AND TEXTU RE OF ORIGINAL MORTAR FOR EACH TYPE OF REPOINTING
MORTAR.
TEST ACCORDING TO ASTM 295, MODIFIED AS AGREED BY TESTING SERV ICE AND PROFESSIONAL FOR PROJECT REQUIREMENTS, TO
DETERMINE PROPORTIONAL COMPOSITION OF ORIGINAL INGREDIENTS, S
STRENGTH. USE X - RAY DIFFRACTION, INFRARED SPECTROSCOPY AND DIF FERENTIAL THERMAL ANALYSIS TO SUPPLEMENT
MICROSCOPICAL METHODS. ANALYSIS TO INCLUDE:
1.
2.
3.
4. 5.
3.
BRICK REMOVAL AND REBUILDING
3.04
A.
B.
D.
1.06
A.
CAREFULLY REMOVE BY HAND ANY UNITS WHICH ARE DAMAGED, SPALLED , SHIFTED OR DAMAGED. CUT OUT FULL UNITS FROM JOINT
TO JOINT AND IN MANNER TO PERMIT REPLACEMENT WITH FULL SIZE UNI TS WITHOUT DAMAGING SURROUNDING MASONRY.
FACE BRICK: REMOVE DAMAGED FACE BRICK AND REPLACE WITH NEW FA CE BRICK TO MATCH.
MAINTAIN FLASHING, REINFORCEMENT, LINTELS AND ADJOINING CONST RUCTION IN UNDAMAGED CONDITION.
SUPPORT AND PROTECT UNITS TO REMAIN WHICH SURROUNDS REMOVAL AREA.
1. REMOVE LOOSE PARTICLES, SOIL, DEBRIS, OIL AND OTHER CONTAMI NANTS FROM EXISTING UNITS BY CLEANING WITH STIFF
BRUSH
C.
D.
E.
0014//2007//22002266
INSTALL NEW OR SALVAGED BRICK TO REPLACE REMOVED BRICK. FITRE PLACEMENT UNITS INTO BONDING AND COURSING PATTERN
OF EXISTING BRICK. IF CUTTING IS REQUIRED, USE A MOTOR -D RIVENS AW DESIGNED TO CUT MASONRY WITH CLEAN, SHARP,
UNCHIPPED EDGES.
LAY REPLACEMENT BRICK WITH COMPLETELY FILLED BED, HEAD, AND CO
FILL HEAD JOINTS AND SHOVE INTO PLACE. WET CLAY BRICKS THAT HAV E ASTM C 67 INITIAL RATES OF ABSORPTION (SUCTION) OF
MORE THAN 30 GRAMS PER 30 SQ. IN. PER MINUTE. USE WETTING METH
SURFACE DRY WHEN LAID. MAINTAIN JOINT WIDTH FOR REPLACEMENT U NITS TO MATCH EXITING UNITS.
TOOL EXPOSED MORTAR JOINTS IN REPAIRED AREAS TO MATCH JOINTSO F SURROUNDING EXISTING BRICKWORK.
BRICK CONSOLIDATION TREATMENT
APPLY TREATMENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. AP PLY TREATMENT AFTER REMOVAL OF EXISTING MORTAR BUT
PRIOR TO REPOINTIN
APPLY TWO COATS.
PROTECT TREATED SURFACES AFTER APPLICATION PER MANUFACTURER'S INSTRUCTIONS
REPOINTING MASONRY
REPLACEMENT OF DETERIORATED MORTAR JOINTS, CRACKED MORTAR JO
TO FACE BRICK, ADJACENT STONE.
JOINT RAKING: RAKE OUT MORTAR FROM JOINTS TO DEPTHS EQUAL TO2 -1/2 TIMES THEIR WIDTHS BUT NOT LESS THAN 1/2 INCH
(12MM) NOR LESS THAN THAT REQUIRED TO EXPOSE SOUND, UN -WEATH ERED MORTAR.
1. REMOVE MORTAR FROM MASONRY SURFACES WITHIN RAKED -OUT JOI NTSTO PROVIDE REVEALS WITH SQUARE BACKS AND EDGES
AND TO EXPOSE MASONRY FOR CONTACT WITH POINTING MORTAR. B
LOOSE DEBRIS.
DO NOT SPALL EDGES OF MASONRY UNITS OR WIDEN JOINTS. REPLA CE ANY MASONRY UNITS WHICH BECOME DAMAGED
CUT OUT OLD MORTAR BY HAND WITH CHISEL AND MALLET, UNLESS OTHERWISE INDICATED.
POWER -OPERATED ROTARY HAND SAWS AND GRINDERS WILL NOT BE PERMITTED UNLESS IT CAN BE DEMONSTRATED TO
ARCHITECT TO WORK SUCCESSFULLY WITHOUT DAMAGING CLAY MASONRY O N HORIZONTAL JOINTS ONLY. POWER - OPERATED
E.
F.
G.
H.
3.05
A.
B.
C.
3.06
A.
1.07
A.
1/2" MIN. DEPTH
SEALANT, MA TCH CUT WI DTH
2.
3.
4.
POLYURETHANE SEALANT, COLOR
MATCH TO BRICK, COLOR SELECTED
BY ARCHITECT FROM
ACID DIGESTION AND GRAVIMETRIC ANALYSIS OF SAMPLE TO DETERM
PARTICLE SIZE ANALYSIS OF AGGREGATE AND RECOMMENDATION OF COMPATIBLE AGGREGATE FOR NEW MORTAR.
RECOMMENDATION FOR NEW BEDDING AND POINTING MIXES COMPAT
SAMPLES OF EACH RECOMMENDED MORTAR IN 1/2-INCH BY 6-INCH (1 DELIVER TO THE TESTING LABORATORY SAMPLES OF THE EXISTING PO
EXISTING POINTING MORTAR.
6. SUBMIT TO THE PROFESSIONAL COPIES OF ALL TEST PROCEDURES, RE
FIRMS AND CONSERVATION TESTING LABORATORIES, WHICH POSSESS Q UALIFICATIONS FOR ANALYSIS AND FOR PROVIDING
REPLICATION MIXES INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:
1. BUILDING CONSERVATION ASSOCIATES, INC, PHILADELPHIA PA 215-9 23-2834 (ATTN: DOROTHY KROTZER)
2. MATERIALS CONSERVATION CO, LLC, PHILADELPHIA PA 215 - 763 - 8090 (ATTN: JOHN CARR)
SEQUENCING/SCHEDULING
PERFORM MASONRY AND STONE RESTORATION WORK IN THE FOLLOWING SEQUENCE:
1. INSPECT FOR OPEN MORTAR JOINTS AND REPAIR BEFORE CLEANING T O PREVENT INTRUSION OF WATER INTO BUILDING.
2. MASONRY AND STONE REMOVAL AND REBUILDING.
3. RAKING OUT MORTAR JOINTS.
4. REPOINTING.
5. PATCHING.
UNIT PRICE FOR FACE BRICK REPLACEMENT
UNIT PRICE PER EACH BRICK OF FACE - BRICK REPLACEMENT, INCLUDING A LL MATERIAL AND LABOR COSTS.
1. UNIT PRICE INCLUDES REMOVAL AND REPLACEMENT OF ONE FACE BRI CK PER TAG " BR - UR" ON DRAWINGS.
2. AREAS INDICATED ON DRAWINGS FOR FACE BRICK REPLACEMENT ARE PART OF THE BASE BID.
JOINT V.I.F.
WIDTH
- MOON CUTS AT
129 E MAIN STREET
NORRISTOWN, PA 19401
JOINT POINTING: RINSE MASONRY JOINT SURFACES WITH WATER TO RE APPLICATION OF RINSING SO THAT, AT TIME OF POINTING, EXCESS WAT
DAMP BUT FREE OF STANDING WATER.
1.
SAW CUT CRACKS TO 1/4" MIN.
WIDTH WITH SQUARE PARALLEL
EDGES
APPLY FIRST LAYER OF POINTING MORTAR TO AREAS WHERE EXISTIN G MORTAR WAS REMOVED TO DEPTHS GREATER THAN
SURROUNDING AREAS. APPLY IN LAYERS NOT GREATER THAN 3/8 INC
EACH LAYER THOROUGHLY AND ALLOW TO BECOME THUMBPRINT-HAR D BEFO RE APPLYING NEXT LAYER.
TAKE CARE NOT TO SPREAD MORTAR OVER EDGES ONTO EXPOSED MA
WHEN MORTAR IS THUMBPRINT -HARD, TOOL JOINTS TO MATCH APPR OVED SAMPLE. REMOVE EXCESS MORTAR FROM EDGE OF
JOINT BY BRUSHING.
CURE MORTAR BY MAINTAINING IN A DAMP CONDITION FOR NOT LES STHAN 72 HOURS.
WHERE REPOINTING WORK PRECEDES CLEANING OF EXISTING MASO
BEFORE BEGINNING CLEANING WORK.
CURE HYDRAULIC LIME MORTAR ACCORDING TO MANUFACTURER'S RE
BE DAMPENED REGULARLY WITH THE FOLLOWING CURING METHODS:
ACCEPTABLE CURING METHODS INCLUDE COVERING WITH WET BURLAP A ND POLYETHYLENE SHEETED PANELS, PERIODIC HAND
MISTING, AND PERIODIC MIST SPRAYING USING SYSTEM OF PIPES, MIST HEADS, AND TIMERS
ADJUST CURING METHODS TO ENSURE THAT POINTING MORTAR IS DAMP
MORTAR.
7.
REMOVE EXISTING SEALANTS,
ADHESIVES, AND OTHER MATERIALS
FROM JOINTS TO PREPARE SURFACES
TO RECEIVE NEW SEALANT PER
2.
3.
DATE
1.08
A.
4.
5.
1.09
A.
FOR HYDRAULIC LIMES, RETENTION OF MOISTURE WITHIN THE MORT AR FOR THE FIRST SEVERAL DAYS [MINIMUM OF 96 HOURS] I
CRITICAL TO ENSURE THAT THE HYDRAULIC SET TAKES PLACE BECAU SEITS HYDRAULIC CONSTITUENTS REACT WITH WATER
ITSELF. THEREAFTER, THE REMAINING CARBONATION SET REQUIRES CYCLICAL LIGHT DAMPING AND SLOW DRYING. FOLLOW
MANUFACTURER' S INSTRUCTIONS REGARDING THE TREATMENT OF THE MORTAR JOINTS THRO UGHOUT THE DURATION OF THE
CURING PROCES
SPECIFICATIONS
A - 011

POLYURETHANE BACKER ROD,
COMPRESSION FIT
SAW CUT CRACKS TO 1/4" MIN.
WIDTH WITH SQUARE PARALLEL
EDGES
POLYURETHANE SEALANT, COLOR
MATCH TO BRICK, SAMPLES REQUIRED
FOR REVIEW AND APPROVAL
.NIM
"4/1
EXISTING BRICK VENEER
RAKE OUT EXIST. MORTAR JOINTS
1.5 TIMES THE WIDTH OF THE JOINT,
MIN. OR TO SOUND MORTAR, PLACE
NEW MORTAR SOLID TO SOUND
MORTAR, MATCH THE STRIKE STYLE
OF EXIST. ORIGINAL JOINTS
AS IDENTIFIED BY THE ARCHITECT
JOINT ENDS TO BE CHISELED OUT TO
POLYURETHANE SEALANT, COLOR SQUARE, CLEAN, PERPENDICULAR
MATCH TO BRICK, COLOR SELECTED OPENINGS, HALF-MOON CUTS AT
BY ARCHITECT FROM JOINT ENDS ARE NOT ACCEPTABLE.
MANUFACTURER'S STOCK RANGE,
SAMPLES REQUIRED FOR APPROVAL.
1/2" MIN. DEPTH
REMOVE EXISTING SEALANTS,
ADHESIVES, AND OTHER MATERIALS JOINT WIDTH V.I.F.
FROM JOINTS TO PREPARE SURFACES
TO RECEIVE NEW SEALANT PER
MANUFACTURER'S SPECIFICATIONS. SEALANT, MATCH CUT WIDTH
COMPRESSION FIT
POLYETHYLENE BACKER ROD
W
EXIST. MASONRY
SAW CUT SPALLED AREA TO SOUND MASONRY WITH
SQUARE EDGES TO 1/8" MINIMUM DEPTH AND TO DEPTH
W x 1.5 MIN. AS SPECIFIED BY PATCHING COMPOUND MANUFACTURER,
FEATHERING OF PATCHING COMPOUND IS NOT
ACCEPTABLE, ROUGHEN EXPOSED BRICK SURFACE TO
UNIFORM DEPTH TO RECEIVE PATCHING COMPOUND
INSTALL STAINLESS STEEL MESH OR WIRE LATH
AT AREA OF REPAIR, SECURE WITH STAINLESS STEEL
SCREWS INTO SOUND MASONRY.
PREPARE EXPOSED SURFACE AND APPLY
MORTAR PATCHING COMPOUND ACCORDING TO
MANUFACTURER'S SPECIFICATIONS, MATCH EXISTING
BRICK COLOR, TOOL SURFACE TO MATCH PROFILE AND
SURFACE TEXTURE OF THE EXISTING MATERIAL.
SAMPLE REQUIRED FOR THE REVIEW AND ACCEPTANCE
OF THE ARCHITECT AND OWNER.
ISSUE DATE:
LANDMARKS SGA PROJECT NO.
N
O
I
T C
U
R
T
S
N
O
C
R
O
F
T
O
N
REVISIONS
NOTE: DO NOT SCALE FROM DRAWINGS.
VERIFY ALL DIMENSIONS ON SITE.
tvr.dehcated_lartneC_32R_tS
niaM
E
921_NWOTSIRRON\sgniwarD
40\niaM
E
921
10\stcejorP
laudividnI
30\020422_margorP
edacaF
nwotsirroN
84542\AGS
skramdnaL\stcejorPweN\SAN-GL\\
MP
92:84:3
6202/02/1
SECTION 040121
BRICK RESTORATION
PART 1 - GENERAL PART 2 - PRODUCTS
1.01 RELATED DOCUMENTS 2.01 MASONRY MATERIALS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 A. FACE BRICK AND ACCESSORIES: PROVIDE FACE BRICK AND ACCESSORIES, INCLUDING UNITS FOR LINTELS, ARCHES, CORNERS, AND 8. HAIRLINE CRACKING WITHIN MORTAR OR MORTAR SEPARATION AT EDGE OF A JOINT IS UNACCEPTABLE. COMPLETELY REMOVE
SPECIFICATION SECTIONS, APPLY TO THIS SECTION. OTHER SPECIAL GROUND, CUT, OR SAWED SHAPES WHERE REQUIRED TO COMPLETE MASONRY RESTORATION WORK. SUCH MORTAR AND REPOINT.
1.02 SECTION SUMMARY 1. PROVIDE UNITS WITH COLOR, SURFACE TEXTURE, AND PHYSICAL PROPERTIES TO MATCH EXISTING FACE BRICK OR BLEND OF 3.07 PATCHING
A. EXTERIOR APPLICATIONS: BRICK. FACE BRICK SHALL CONFORM TO ASTM C 216, TYPE SW, GRADEA. A. PATCHING AND REPAIR OF MISCELLANEOUS CRACKS IN EXISTING FACADE, INCLUDING FACE BRICK.
1. REPLACE OR REPAIR BRICKWORK IN DESIGNATED AREAS 2.02 MORTAR MATERIALS; PORTLAND CEMENT LIME MORTAR 1. REPAIR FACADE CRACKS IN FACE BRICK UNLESS DIRECTED ON DRAWINGS TO "REBUILD" CRACKED AREAS OR "SAW CUT" CRACKED
2. REPOINTING OF DESIGNATED AREAS OF BRICKWORK A. PORTLAND CEMENT: ASTM C 150, TYPE I. LOW-ALKALI, NON-STAINING CEMENT. AREAS. (ASSUME 100 LINEAR FEET OF REPAIR)
3. DISMANTLE AND REBUILD AREAS SHOWN; NEW BRICK TO MATCH EXISTING FINISH BRICK ON EXTERIOR AND COMMON BRICK ON 1. FOR STONEWORK PROVIDE NON-STAINING WHITE CEMENT COMPLYING WITH STAINING REQUIREMENT OF ASTM C 91 FOR NOT B. FACADE CRACKS: AS FOLLOWS, UNLESS OTHERWISE INDICATED.
INTERIOR MORE THAN 0.03% WATER SOLUBLE ALKALI. CRACK SIZE (WIDTH) PROCEDURE
1.03 DEFINITIONS B. HYDRATED LIME: ASTM C 207, TYPE S. 1/64" (.39MM) OR LESS REPOINT CRACKED MORTAR JOINTS.
A. REPOINTING: THE PROCESS OF RAKING OUT (REMOVING) MORTAR ANDREPLACING IT WITH NEW MORTAR. C. FACTORY PREPARED LIME PUTTY: ASTM C 1489. NO REPAIR OR REPLACEMENT REQUIRED.
B. PATCH POINTING: THE PROCESS OF PLACING NEW MORTAR IN EXISTING JOINT SPACES, WHICH HAVE PREVIOUSLY BEEN RAKED OUT. QUICKLIME: ASTMC5, PULVERIZED LIME. 1/64" (.39MM) TO 1/16"(1.5MM) REPOINT CRACKED MORTAR JOINTS.
THIS TERM DOES NOT INCLUDE THE RAKING OUT PROCESS. D. AGGREGATE FOR MORTAR: ASTM C 144, UNLESS OTHERWISE INDICATED. PRESSURE INJECT GROUT INTO CRACKS OR REPLACE MATERIAL.
C. GROUT [TUCK] POINTING: THE PROCESS OF TOUCHING UP EXISTING MORTAR JOINT BY FILLING IN RECESSES WITH NEW MORTAR, 1. FOR POINTING MORTAR, PROVIDE SAND WITH ROUNDED EDGES. 3.08 APPLICATION OF JOINT SEALANT
WITHOUT FIRST RAKING OUT THE JOINTS. 2. MATCH SIZE, TEXTURE AND GRADATION OF EXISTING MORTAR AGGREGATE AS CLOSELY AS POSSIBLE. B. REFER TO SECTION 079200 -JOINT SEALANTS.
1. MATCH EXISTING: NEW MATERIALS AND PRODUCTS SHALL MATCH EXISTING IN MATERIAL, SIZE, SHAPE, PROFILE, E. WATER: CLEAN, FREE OF OILS, ACIDS, ALKALINE AND ORGANIC MATTER. C. REPLACE DETERIORATED SEALANT CRACKED SEALANT, MISSING SEALANT, AND SEALANT NOT BONDED TO ADJACENT SURFACES.
CONFIGURATION, COLOR, TEXTURE. TOOLING, QUALITY OF WORKMANSHIP AND VISUAL APPEARANCE. REPLACEMENT MATERIALS F. COLORED MORTAR: AS FOLLOWS: D. REPLACE ENTIRE AREAS OF SEALANT WHERE INDICATED ON DRAWINGS.
SHALL NOT BE VISUALLY DISCERNABLE FROM ADJACENT EXISTING MATERIALS, EXCEPT FOR MINOR DIFFERENCE RELATING TO 1. MATCH EXISTING MORTAR COLOR, AFTER CLEANING. 3.09 MISCELLANEOUS WORK
WEATHERING OR AGING. A. WHEN ATTEMPTING TO MATCH EXISTING MORTAR, THE CONTRACTOR SHALL SUBMIT TO A TESTING LABORATORY, A SAMPLE A. PAINTING STEEL UNCOVERED DURING THE WORK, INSPECT STEEL EXPOSED DURING MASONRY REMOVAL. WHERE ARCHITECT
D. SALVAGE/RETAIN: CAREFULLY REMOVE MATERIALS OF COMPONENTS IN A MANNER THAT WILL PERMIT REUSE OR REINSTALLATION IN OF THE EXISTING MORTAR TO DETERMINE ITS CONTENTS. DETERMINES THAT IT IS STRUCTURAL, OR FOR OTHER REASONS CANNOT BE TOTALLY REMOVED, PREPARE AND PAINT IT AS FOLLOWS:
THIS PROJECT. B. UPON DETERMINATION OF THE CONTENTS OF THE EXISTING MORTAR,THE CONTRACTOR WILL PRODUCE A WALL MOCK-UP 1. REMOVE PAINT, RUST, AND OTHER CONTAMINANTS ACCORDING TO SSPC-SP2, "HAND TOOL CLEANING" AS APPLICABLE TO MEET
E. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLYDISPOSE OF THEM OFF-SITE UNLESS INDICATED TO BE USING THE FORMULA FOR THE EXISTING MORTAR TO CREATE NEW MORTAR. THE ARCHITECT WILL THEN REVIEW THE MOCK- PAINT MANUFACTURER'S RECOMMENDED PREPARATION.
REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. UP FOR APPROVAL. 2. IMMEDIATELY PAINT EXPOSED STEEL WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN
F. DISASSEMBLE AND SALVAGE: CAREFULLY DETACH FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELIVER 2. COLORED PORTLAND CEMENT-LIME MIX. INSTRUCTIONS AND WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDEDRATE OF APPLICATION (DRY FILM THICKNESS PER
TO OWNER. A. THE RIVERTON CORPORATION "RIVERTON PORTLAND CEMENT LIME CUSTOM COLOR", FRONT ROYAL, VA (540)-635-4131. COAT).
G. DISASSEMBLE AND REINSTALL: CAREFULLY DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE FOR REUSE, AND REINSTALL C. GLEN-GERY/OLDCASTLE CORPORATION "COLOR MORTAR BLEND", WYOMISSING, PA, HYPERLINK 3. IF ON INSPECTION AND RUST REMOVAL, THE CROSS SECTION OF A STEEL MEMBER IS FOUND TO BE REDUCED FROM RUST BY
WHERE INDICATED. "HTTP://WWW.GLENGERYBRICK.COM"WWW.GLENGERYBRICK.COM (610)-374-4011 MORE THAN 1/8 INCH (3 MM) NOTIFY ARCHITECT BEFORE PROCEEDING.
H. EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARENOT TO BE PERMANENTLY REMOVED AND THAT ARE NOT D. LEHIGH PORTLAND CEMENT CO. "LEHIGH CUSTOM COLOR PORTLAND/LIME", ALLENTOWN, PA, WWW.LEHIGHCEMENT.COM
OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. (800)-523-5488. SECTION 040123.10 FINAL CLEANING
I. DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FROM A SURFACE, USING GENTLE METHODS AND EQUIPMENT TO 3. MORTAR PIGMENTS A. AFTER MORTAR HAS FULLY HARDENED, THOROUGHLY CLEAN EXPOSED MASONRY SURFACES OF EXCESS MORTAR AND FOREIGN
PREVENT DAMAGE TO THE ITEM AND SURFACES; DISPOSING OF ITEMS UNLESS INDICATED TO BE SALVAGED A. DAVIS COLORS "TRUE TONE MORTAR COLORS", LOS ANGELES, CA, HYPERLINK MATTER; USE WOOD SCRAPERS, STIFF-NYLON OR -FIBER BRUSHES, AND CLEAN WATER, APPLIED BY LOW PRESSURE SPRAY.
1.04 SUBMITTALS "HTTP://WWW.DAVISCOLORS.COM"WWW.DAVISCOLORS.COM (800)-356-4848. 1. DO NOT USE METAL SCRAPERS OR BRUSHES.
A. PRODUCT DATA FOR EACH PRODUCT INDICATED INCLUDING RECOMMENDATIONS FOR THEIR APPLICATION AND USE. INCLUDE TEST B. SOLOMON GRIND-CHEM SERVICES, INC. "SGS MORTAR COLORS", SPRINGFIELD, IL, HYPERLINK 2. DO NOT USE ACIDIC OR ALKALINE CLEANERS.
REPORTS AND CERTIFICATIONS SUBSTANTIATING THAT PRODUCTS COMPLYWITH REQUIREMENTS. "HTTP://WWW.SOLOMOMCOLORS.COM"WWW.SOLOMOMCOLORS.COM (800)-624-0261. B. CLEAN ADJACENT NON-MASONRY SURFACES. USE DETERGENT AND SOFT BRUSHES OR CLOTHS.
B. SAMPLES FOR VERIFICATION PURPOSES, PRIOR TO ERECTING THE MOCKUP, OF THE FOLLOWING: 2.03 MORTAR MIXES C. CLEAN MORTAR AND DEBRIS FROM ROOF; REMOVE DEBRIS FROM GUTTERS AND DOWNSPOUTS. RINSE OFF ROOF AND FLUSH GUTTERS
1. EACH NEW EXPOSED MASONRY MATERIAL TO BE USED FOR REPLACING EXISTING MATERIALS. INCLUDE IN EACH SET OF SAMPLES A. MEASUREMENT AND MIXING: MEASURE CEMENTITIOUS AND AGGREGATE MATERIAL IN A DRY CONDITION BY VOLUME OR EQUIVALENT AND DOWNSPOUTS.
THE FULL RANGE OF COLORS AND TEXTURES TO BE EXPECTED IN THE COMPLETED WORK. WEIGHT. DO NOT MEASURE BY SHOVEL; USE KNOWN MEASURE. MIX MATERIALS IN A CLEAN MECHANICAL BATCH MIXER. D. REMOVE MASKING MATERIALS, LEAVING NO RESIDUES THAT COULD TRAP DIRT.
A. PROVIDE STRAPS OR PANELS CONTAINING NOT LESS THAN FOUR BRICK UNITS. B. MIXING POINTING MORTAR: THOROUGHLY MIX CEMENTITIOUS AND AGGREGATE MATERIALS TOGETHER BEFORE ADDING ANY WATER.
2. EACH TYPE OF MORTAR FOR POINTING AND MASONRY REBUILDING ANDREPAIR IN THE FORM OF SAMPLE MORTAR STRIPS 6 INCHES THEN MIX AGAIN, ADDING ONLY ENOUGH WATER TO PRODUCE A DAMP, UNWORKABLE MIX WHICH WILL RETAIN ITS FORM WHEN END OF SECTION
(152MM) LONG BY 1/2 INCH (12MM) WIDE SET IN ALUMINUM OR PLASTIC CHANNELS. PRESSED INTO A BALL. MAINTAIN MORTAR IN THIS DAMPENED CONDITION FOR 1 TO 2 HOURS. ADD REMAINING WATER IN SMALL
3. EACH TYPE OF REPAIR ANCHOR. PORTIONS UNTIL MORTAR OF DESIRED CONSISTENCY IS REACHED. USE MORTAR WITHIN 30 MINUTES OF FINAL MIXING; DO NOT RE-
C. QUALIFICATION DATA FOR FIRMS AND PERSONS SPECIFIED IN THE "QUALITY ASSURANCE" ARTICLE TO DEMONSTRATE THEIR TEMPER OR USE PARTIALLY HARDENED MATERIAL.
CAPABILITIES AND EXPERIENCE. INCLUDE A LIST OF COMPLETED PROJECTS WITH PROJECT NAMES, ADDRESSES, NAMES OF 1. POINTING MORTAR: ONE PART PORTLAND CEMENT, ONE PART LIME AND SIX PARTS MORTAR AGGREGATE. COMPLY WITH ASTM
ARCHITECTS AND OWNERS, AND OTHER INFORMATION SPECIFIED. C 270, PROPORTION SPECIFICATION, TYPE N, 750 P.S.I.
1. RESTORATION PROGRAM FOR EACH PHASE OF THE RESTORATION PROCESS, INCLUDING PROTECTION OF SURROUNDING 2. REBUILDING MORTAR: COMPLY WITH ASTM C 270, PROPORTION SPECIFICATION.
MATERIALS ON BUILDING AND SITE DURING OPERATIONS. DESCRIBED IN DETAIL THE MATERIALS, METHODS, AND EQUIPMENT TO A. ABOVE GRADE MORTAR: TYPE "N"
BE USED FOR EACH PHASE OF THE RESTORATION WORK. 2.04 MISCELLANEOUS MATERIALS
2. IF ALTERNATIVE METHODS AND MATERIALS TO THOSE INDICATED AREPROPOSED FOR ANY PHASE OF RESTORATION WORK, A. BRICK CONSOLIDATION TREATMENT: BINDER AND FIXING AGENT MADE FROM PURE, LIQUID POTASSIUM SILICATE.
PROVIDE A WRITTEN DESCRIPTION, INCLUDING EVIDENCE OF SUCCESSFUL USE ON OTHER COMPARABLE PROJECTS, AND A 1. KEIM MINERAL COATINGS OF AMERICA, INC.; "KEIM FIXATIV"CHARLOTTE, NC, WWW.KEIM-USA.COM (704) 588-4811
TESTING PROGRAM TO DEMONSTRATE THEIR EFFECTIVENESS FOR THIS PROJECT.
1.05 QUALITY ASSURANCE PART 3 - EXECUTION
A. RESTORATION SPECIALIST: ENGAGE AN EXPERIENCED MASONRY RESTORATION AND CLEANING FIRM THAT HAS SPECIALIZED IN THE 3.01 GENERAL
TYPES OF WORK REQUIRED FOR THIS PROJECT. A. MASONRY RESTORATION MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S CURRENT, PRINTED
1. WORK MUST BE PERFORMED BY A FIRM HAVING NOT LESS THAN 5 YEARS SUCCESSFUL EXPERIENCE IN COMPARABLE MASONRY INSTRUCTIONS.
RESTORATION PROJECTS AND EMPLOYING PERSONNEL SKILLED IN THE RESTORATION PROCESSES AND OPERATIONS INDICATED. 3.02 BUILDING SURVEY
2. FIELD SUPERVISION: REQUIRE RESTORATION SPECIALIST FIRM TO MAINTAIN AN EXPERIENCED FULL-TIME SUPERVISOR ON THE A. CONTRACTOR SHALL SURVEY MASONRY JOINTS IN DETAIL TO DETERMINE REPAIR AND REPLACEMENT WORK NECESSARY FOR
JOB SITE DURING TIMES THAT CLAY MASONRY RESTORATION AND CLEANING ARE IN PROGRESS. RESTORATION.
B. FIELD-CONSTRUCTION MOCKUPS: PRIOR TO STARTING MASONRY RESTORATION, PREPARE THE FOLLOWING SAMPLE TEST AREAS ON B. BEFORE PROCEEDING WITH REPAIR FOR REPOINTING WORK THE CONTRACTOR SHALL CAREFULLY EXAMINE ALL MASONRY AND STONE
THE BUILDING WHERE DIRECTED BY ARCHITECT. PREPARE SAMPLE TEST AREAS USING SAME MATERIALS AND METHODS PROPOSED MORTAR JOINTS FOR SOUNDNESS AND EXTENT OF DETERIORATION.
FOR THE WORK, AND UNDER SAME WEATHER CONDITIONS TO BE EXPECTEDDURING THE RESTORATION. OBTAIN ARCHITECT'S 3.03 PREPARATION
ACCEPTANCE OF VISUAL QUALITIES BEFORE PROCEEDING WITH MASONRY RESTORATION. RETAIN ACCEPTABLE TEST AREAS IN AN A. PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUILDING WHOSE MASONRY SURFACES ARE RESTORED,
UNDISTURBED CONDITION, SUITABLY MARKED, DURING CONSTRUCTION ASA STANDARD FOR JUDGING THE COMPLETED WORK. BUILDING SITE, AND SURROUNDING BUILDINGS FROM INJURY RESULTINGFROM MASONRY RESTORATION WORK.
1. NOTIFY OWNER ONE WEEK IN ADVANCE OF DATES AND TIMES WHEN SAMPLE TEST AREAS WILL BE PREPARED. PREPARE A MINIMUM B. UNUSED ANCHOR REMOVAL
OF THREE TEST AREAS SHOWING VARIOUS RESTORATION METHODS. 1. REMOVE MASONRY ANCHORS, BRACKETS, WOOD NAILERS, AND OTHER EXTRANEOUS ITEMS NO LONGER IN USE UNLESS
2. REPOINTING: PREPARE 2 SEPARATE SAMPLE AREAS OF APPROXIMATELY 3 FT. (900MM) HIGH BY 3 FT. (900MM) WIDE FOR EACH IDENTIFIED AS HISTORICALLY SIGNIFICANT OR INDICATED TO REMAIN.
TYPE OF REPOINTING REQUIRED; ONE FOR DEMONSTRATING METHODS AND QUALITY OF WORKMANSHIP EXPECTED IN REMOVAL OF 2. REMOVE ITEMS CAREFULLY TO AVOID SPALLING OR CRACKING MASONRY. WHERE DIRECTED, IF AN ITEM CANNOT BE REMOVED
MORTAR FROM JOINTS AND THE OTHER FOR DEMONSTRATING QUALITY OFMATERIALS AND WORKMANSHIP EXPECTED IN POINTING WITHOUT DAMAGING SURROUNDING MATERIAL, DO THE FOLLOWING:
MORTAR JOINTS. SEPARATE SAMPLES OF EACH TYPE ARE REQUIRED FORSTONEWORK AND FOR BRICKWORK. A. CUT OR GRIND OFF ITEM APPROXIMATELY 3/4 INCH (20 MM) BENEATH SURFACE AND CORE DRILL A RECESS OF SAME DEPTH
3. MASONRY REPAIR: PREPARE SAMPLE PANELS OF SIZE INDICATED FOR EACH TYPE OF MASONRY MATERIAL INDICATED TO BE IN SURROUNDING MASONRY AS CLOSE AROUND ITEM AS PRACTICAL.
PATCHED, REBUILT OR REPLACED. ERECT MOCK-UP PANELS INTO AN EXISTING WALL, UNLESS OTHERWISE INDICATED, TO B. IMMEDIATELY PAINT EXPOSED END OF ITEM WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING
DEMONSTRATE QUALITY OF MATERIALS AND WORKMANSHIP. SEPARATE SAMPLES OF EACH TYPE ARE REQUIRED FOR STONEWORK MANUFACTURER'S WRITTEN INSTRUCTIONS AND WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDED DRY FILM
AND FOR BRICKWORK. THICKNESS PER COAT. KEEP PAINT OFF SIDES OF RECESS.
C. REFERENCES: U.S. DEPARTMENT OF THE INTERIOR, HERITAGE CONSERVATION AND RECREATION SERVICE PRESERVATION BRIEFS 3. PATCH THE HOLE WHERE EACH ITEM WAS REMOVED UNLESS DIRECTED TO REMOVE AND REPLACE THE MASONRY UNIT.
1. REPOINTING MORTAR JOINTS IN HISTORIC BRICK BUILDINGS. 3.04 BRICK REMOVAL AND REBUILDING
D. BRICK INDUSTRY ASSOCIATION (BIA) TECHNICAL NOTES ON BRICK CONSTRUCTION A. REMOVE BRICK AND REBUILD AREAS INDICATED ON THE DRAWINGS.
1.06 PROJECT/SITE CONDITIONS B. CAREFULLY REMOVE BY HAND ANY UNITS WHICH ARE DAMAGED, SPALLED, SHIFTED OR DAMAGED. CUT OUT FULL UNITS FROM JOINT
A. PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUILDING WHOSE MASONRY SURFACES ARE BEING RESTORED, TO JOINT AND IN MANNER TO PERMIT REPLACEMENT WITH FULL SIZE UNITS WITHOUT DAMAGING SURROUNDING MASONRY.
BUILDING SITE, AND SURROUNDING BUILDINGS FROM INJURY RESULTINGFROM MASONRY RESTORATION WORK. ERECT TEMPORARY C. FACE BRICK: REMOVE DAMAGED FACE BRICK AND REPLACE WITH NEW FACE BRICK TO MATCH.
PROTECTION COVERS AS REQUIRES. D. MAINTAIN FLASHING, REINFORCEMENT, LINTELS AND ADJOINING CONSTRUCTION IN UNDAMAGED CONDITION.
B. DO NOT REPOINT MORTAR JOINTS OR REPAIR MASONRY UNLESS AIR TEMPERATURES ARE BETWEEN 40 DEGREES F (4 DEGREES C) AND E. SUPPORT AND PROTECT UNITS TO REMAIN WHICH SURROUNDS REMOVAL AREA.
80 DEGREES F (27 DEGREES C) AND WILL REMAIN SO FOR AS LEAST 48HOURS AFTER COMPLETION OF WORK. WHEN TEMPERATURE 1. REMOVE LOOSE PARTICLES, SOIL, DEBRIS, OIL AND OTHER CONTAMINANTS FROM EXISTING UNITS BY CLEANING WITH STIFF BRICK REPAIR TYPE RR - RAKE AND REPOINT 3 BRICK REPAIR TYPE SP - PATCHING COMPOUND 4 BID SET
FALLS BELOW 32 DEGREES F (0 DEGREES C), PROVIDE A TEMPORARY ENCLOSURE WORK AREA, DAY AND NIGHT; PROVIDE TEMPORARY BRUSH.
6" = 1'-0" A-011 6" = 1'-0" A-011 0014//2007//22002266
HEAT. F. INSTALL NEW OR SALVAGED BRICK TO REPLACE REMOVED BRICK. FITREPLACEMENT UNITS INTO BONDING AND COURSING PATTERN
C. HOT WEATHER REQUIREMENTS: PROTECT RESTORATION WORK WHEN TEMPERATURE AND HUMIDITY CONDITIONS PRODUCE EXCESSIVE OF EXISTING BRICK. IF CUTTING IS REQUIRED, USE A MOTOR-DRIVENSAW DESIGNED TO CUT MASONRY WITH CLEAN, SHARP,
224020
EVAPORATION OF WATER FROM MORTAR AND PATCHING MATERIALS. PROVIDE ARTIFICIAL SHADE AND WIND BREAKS AND USE UNCHIPPED EDGES.
COOLED MATERIALS AS REQUIRED. DO NOT APPLY MORTAR TO SUBSTRATES WITH TEMPERATURES OF 90 DEG F (32 DEG C) AND G. LAY REPLACEMENT BRICK WITH COMPLETELY FILLED BED, HEAD, AND COLLAR JOINTS. BUTTER ENDS WITH SUFFICIENT MORTAR TO
ABOVE. FILL HEAD JOINTS AND SHOVE INTO PLACE. WET CLAY BRICKS THAT HAVE ASTM C 67 INITIAL RATES OF ABSORPTION (SUCTION) OF
D. PREVENT GROUT OR MORTAR USED IN REPOINTING AND REPAIR WORK FROM STAINING FACE OF SURROUNDING MASONRY AND OTHER MORE THAN 30 GRAMS PER 30 SQ. IN. PER MINUTE. USE WETTING METHODS THAT ENSURE UNITS ARE NEARLY SATURATED BUT
SURFACES. REMOVE IMMEDIATELY GROUT AND MORTAR IN CONTACT WITHEXPOSED MASONRY AND OTHER SURFACES. SURFACE DRY WHEN LAID. MAINTAIN JOINT WIDTH FOR REPLACEMENT UNITS TO MATCH EXITING UNITS.
E. PROTECT SILLS, LEDGES AND PROJECTIONS FROM MORTAR DROPPINGS. H. TOOL EXPOSED MORTAR JOINTS IN REPAIRED AREAS TO MATCH JOINTSOF SURROUNDING EXISTING BRICKWORK.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING HARDNESSOF EXISTING MORTAR JOINTS PRIOR TO SUBMITTING BID. 3.05 BRICK CONSOLIDATION TREATMENT
G. TAKE GREAT CARE TO PREVENT DAMAGE TO EXISTING MATERIALS. USETHE GENTLEST MEANS AND METHODS AVAILABLE TO CARRY A. APPLY TREATMENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. APPLY TREATMENT AFTER REMOVAL OF EXISTING MORTAR BUT
OUT THE WORK INDICATED AND SPECIFIED. TEST AND PRACTICE MEANS AND METHODS IN INCONSPICUOUS AREAS UNTIL IT IS PRIOR TO REPOINTING.
DETERMINED THAT THEY CAN BE CARRIED OUT WITHOUT DAMAGE TO MATERIALS SCHEDULED TO REMAIN. B. APPLY TWO COATS.
1.07 PRECONSTRUCTION TESTING C. PROTECT TREATED SURFACES AFTER APPLICATION PER MANUFACTURER'S INSTRUCTIONS.
A. PRECONSTRUCTION MORTAR TESTING: ANALYSIS OF EXISTING BEDDINGAND POINTING MORTAR; CAREFULLY REMOVE EXISTING 3.06 REPOINTING MASONRY
MORTAR FROM WITHIN JOINTS AT FIVE [5] LOCATIONS DESIGNATED BY PROFESSIONAL OR TESTING SERVICE. A. REPLACEMENT OF DETERIORATED MORTAR JOINTS, CRACKED MORTAR JOINTS, MISSING MORTAR JOINTS, AND JOINTS NOT BONDED
B. TEMPORARY PATCH: AS DIRECTED BY PROFESSIONAL, PROVIDE TEMPORARY MATERIALS FOLLOWED BY PERMANENT REPAIRS AT TO FACE BRICK, ADJACENT STONE.
LOCATIONS FROM WHICH EXISTING SAMPLES WERE TAKEN. B. JOINT RAKING: RAKE OUT MORTAR FROM JOINTS TO DEPTHS EQUAL TO2-1/2 TIMES THEIR WIDTHS BUT NOT LESS THAN 1/2 INCH
C. PROVIDE RECOMMENDED REPLICATION MIX TO MATCH COLOR AND TEXTURE OF ORIGINAL MORTAR FOR EACH TYPE OF REPOINTING (12MM) NOR LESS THAN THAT REQUIRED TO EXPOSE SOUND, UN-WEATHERED MORTAR.
MORTAR. 1. REMOVE MORTAR FROM MASONRY SURFACES WITHIN RAKED-OUT JOINTSTO PROVIDE REVEALS WITH SQUARE BACKS AND EDGES
D. TEST ACCORDING TO ASTM 295, MODIFIED AS AGREED BY TESTING SERVICE AND PROFESSIONAL FOR PROJECT REQUIREMENTS, TO AND TO EXPOSE MASONRY FOR CONTACT WITH POINTING MORTAR. BRUSH, VACUUM, OR FINISH JOINTS TO REMOVE DIRT AND
FACADE
DETERMINE PROPORTIONAL COMPOSITION OF ORIGINAL INGREDIENTS, SIZES AND COLORS OF AGGREGATES, AND APPROXIMATE LOOSE DEBRIS.
STRENGTH. USE X-RAY DIFFRACTION, INFRARED SPECTROSCOPY AND DIFFERENTIAL THERMAL ANALYSIS TO SUPPLEMENT 2. DO NOT SPALL EDGES OF MASONRY UNITS OR WIDEN JOINTS. REPLACE ANY MASONRY UNITS WHICH BECOME DAMAGED.
IMPROVEMENTS MICROSCOPICAL METHODS. ANALYSIS TO INCLUDE: 3. CUT OUT OLD MORTAR BY HAND WITH CHISEL AND MALLET, UNLESS OTHERWISE INDICATED.
1. ACID DIGESTION AND GRAVIMETRIC ANALYSIS OF SAMPLE TO DETERMINE THE CONSTITUENTS AND RATIOS OF SAMPLE. 4. POWER-OPERATED ROTARY HAND SAWS AND GRINDERS WILL NOT BE PERMITTED UNLESS IT CAN BE DEMONSTRATED TO
2. PARTICLE SIZE ANALYSIS OF AGGREGATE AND RECOMMENDATION OF COMPATIBLE AGGREGATE FOR NEW MORTAR. ARCHITECT TO WORK SUCCESSFULLY WITHOUT DAMAGING CLAY MASONRY ON HORIZONTAL JOINTS ONLY. POWER-OPERATED 129 E MAIN STREET
3. RECOMMENDATION FOR NEW BEDDING AND POINTING MIXES COMPATIBLE WITH EXISTING MASONRY AND MORTAR. GRINDERS ON VERTICAL JOINTS ARE PROHIBITED. NORRISTOWN, PA 19401
4. SAMPLES OF EACH RECOMMENDED MORTAR IN 1/2-INCH BY 6-INCH (13MM BY 150 MM) CHANNELS. C. JOINT POINTING: RINSE MASONRY JOINT SURFACES WITH WATER TO REMOVE ANY DUST AND MORTAR PARTICLES. TIME
5. DELIVER TO THE TESTING LABORATORY SAMPLES OF THE EXISTING POINTING MORTAR FOR ANALYSIS AND VERIFICATION OF APPLICATION OF RINSING SO THAT, AT TIME OF POINTING, EXCESS WATER HAS EVAPORATED OR RUN OFF AND JOINT SURFACES ARE
EXISTING POINTING MORTAR. DAMP BUT FREE OF STANDING WATER. MUNICIPALITY OF NORRISTOWN
6. SUBMIT TO THE PROFESSIONAL COPIES OF ALL TEST PROCEDURES, RESULTS AND REPOINTING MORTAR MIXES FOR REVIEW. 1. APPLY FIRST LAYER OF POINTING MORTAR TO AREAS WHERE EXISTING MORTAR WAS REMOVED TO DEPTHS GREATER THAN
E. FIRMS AND CONSERVATION TESTING LABORATORIES, WHICH POSSESS QUALIFICATIONS FOR ANALYSIS AND FOR PROVIDING SURROUNDING AREAS. APPLY IN LAYERS NOT GREATER THAN 3/8 INCH (9.5MM) UNTIL A UNIFORM DEPTH IS FORMED. COMPACT
REPLICATION MIXES INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: EACH LAYER THOROUGHLY AND ALLOW TO BECOME THUMBPRINT-HARD BEFORE APPLYING NEXT LAYER.
1. BUILDING CONSERVATION ASSOCIATES, INC, PHILADELPHIA PA 215-923-2834 (ATTN: DOROTHY KROTZER) 2. TAKE CARE NOT TO SPREAD MORTAR OVER EDGES ONTO EXPOSED MASONRY SURFACES, OR TO FEATHEREDGE MORTAR.
NO. DATE DESCRIPTION 2. MATERIALS CONSERVATION CO, LLC, PHILADELPHIA PA 215-763-8090 (ATTN: JOHN CARR) 3. WHEN MORTAR IS THUMBPRINT-HARD, TOOL JOINTS TO MATCH APPROVED SAMPLE. REMOVE EXCESS MORTAR FROM EDGE OF
1.08 SEQUENCING/SCHEDULING JOINT BY BRUSHING.
A. PERFORM MASONRY AND STONE RESTORATION WORK IN THE FOLLOWING SEQUENCE: 4. CURE MORTAR BY MAINTAINING IN A DAMP CONDITION FOR NOT LESSTHAN 72 HOURS.
1. INSPECT FOR OPEN MORTAR JOINTS AND REPAIR BEFORE CLEANING TO PREVENT INTRUSION OF WATER INTO BUILDING. 5. WHERE REPOINTING WORK PRECEDES CLEANING OF EXISTING MASONRY, ALLOW MORTAR TO HARDEN NOT LESS THAN 30 DAYS
2. MASONRY AND STONE REMOVAL AND REBUILDING. BEFORE BEGINNING CLEANING WORK.
3. RAKING OUT MORTAR JOINTS. 6. CURE HYDRAULIC LIME MORTAR ACCORDING TO MANUFACTURER'S REQUIREMENTS. NEW LIME POINTING MORTAR WILL NEED TO
4. REPOINTING. BE DAMPENED REGULARLY WITH THE FOLLOWING CURING METHODS:
5. PATCHING. E. ACCEPTABLE CURING METHODS INCLUDE COVERING WITH WET BURLAP AND POLYETHYLENE SHEETED PANELS, PERIODIC HAND
1.09 UNIT PRICE FOR FACE BRICK REPLACEMENT MISTING, AND PERIODIC MIST SPRAYING USING SYSTEM OF PIPES, MISTHEADS, AND TIMERS.
A. UNIT PRICE PER EACH BRICK OF FACE-BRICK REPLACEMENT, INCLUDING ALL MATERIAL AND LABOR COSTS. F. ADJUST CURING METHODS TO ENSURE THAT POINTING MORTAR IS DAMP THROUGHOUT ITS DEPTH WITHOUT ERODING SURFACE
1. UNIT PRICE INCLUDES REMOVAL AND REPLACEMENT OF ONE FACE BRICK PER TAG "BR-UR"ON DRAWINGS. MORTAR.
2. AREAS INDICATED ON DRAWINGS FOR FACE BRICK REPLACEMENT ARE PART OF THE BASE BID. 7. FOR HYDRAULIC LIMES, RETENTION OF MOISTURE WITHIN THE MORTAR FOR THE FIRST SEVERAL DAYS [MINIMUM OF 96 HOURS] IS BRICK RESTORATION
BRICK REPAIR TYPE RC - JOINT SEALANT 2 BRICK REPAIR TYPE CR - CRACK REPAIR 1
CRITICAL TO ENSURE THAT THE HYDRAULIC SET TAKES PLACE BECAUSEITS HYDRAULIC CONSTITUENTS REACT WITH WATER
ITSELF. THEREAFTER, THE REMAINING CARBONATION SET REQUIRES CYCLICAL LIGHT DAMPING AND SLOW DRYING. FOLLOW 6" = 1'-0" A-011 6" = 1'-0" A-011 SPECIFICATIONS
MANUFACTURER'S INSTRUCTIONS REGARDING THE TREATMENT OF THE MORTAR JOINTS THROUGHOUT THE DURATION OF THE A-011
CURING PROCESS.

PART 1 -
1.01
A.
RELATED DOCUMENT
DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GE NERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1
SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
SECTION SUMMARY
SECTION INCLUDES THE FOLLOWING MASONRY CLEANING, WHERE INDICA TED OR ENCOUNTERED, OR AS DIRECTED:
1. CLEANING OF BRICK AND STONE MASONR
RELATED SECTIONS
ACIDIC FERROUS STAIN REMOVER: MANUFACTURER'
SOLUTION AND SURFACTANTS FOR THE REMOVAL OF FERROUS STAINS FROM MASONRY SURFACES.
1.
A. COMPLY WITH REQUIREMENTS IN "PAINT REMOVAL" ARTICLE.
B. REPEAT APPLICATION UP TO TWO TIMES IF NEEDED.
1.02
A.
PRODUCTS : SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF THE FOLLOWING BASIS - OF -
STAIN REMOVERS, BASED ON PRE-
REMOVE ASPHALT AND TAR WITH SOLVENT - TYPE PASTE PAINT REMOVE R.
A. PROSOCO, INC.; FERROUS STAIN REMOVE
B. CHEMIQUE; ARTISAN LIGHT DUTY RUST REMOVER
C. CATHEDRAL STONE PRODUCTS, INC.; MASONRRE LIGHT DUTY RUS T REMOVER
A. COMPLY WITH REQUIREMENTS IN "PAINT REMOVAL" ARTICLE.
B. APPLY PAINT REMOVER ONLY TO ASPHALT AND TAR BY BRUSH WITHO UT PRE - WETTING.
C. ALLOW PAINT REMOVER TO REMAIN ON SURFACE FOR 10 TO 30 MINU TES.
D. REPEAT APPLICATION IF NEEDED.
1.03
A.
1. SECTION 040120 - MASONRY AND STONE RESTORATION (WHEN APPLIC
DEFINITIONS
REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLYD ISPOSE OF THEM OFF- SITE UNLESS INDICATED TO BE
REMOVED AND SALVAGED OR REMOVED AND REINSTALLED.
ACIDIC EFFLORESCENCE REMOVER: MANUFACTURER' S STANDARD CLEANER CONTAINING HYDROCHLORIC ACID AND SURFACTANTS
FOR THE REMOVAL OF EFFLORESCENCE FROM MASONRY SURFACES.
1.
1.04
A.
3.05
A.
B.
C.
3.06
A.
FINAL CLEANING
CLEAN ADJACENT NON - MASONRY SURFACES OF SPILLAGE AND DEBRIS. USE DETERGENT AND SOFT BRUSHES OR CLOTHS.
REMOVE DEBRIS FROM GUTTERS AND DOWNSPOUTS. RINSE OFF ROOF AND FLUSH GUTTERS AND DOWNSPOUTS.
REMOVE MASKING MATERIALS, LEAVING NO RESIDUES THAT COULD TRA P DIRT.
FIELD QUALITY CONTROL
PROJECT REPRESENTATIVES: THE OWNER WILL ASSIGN PROJECT REPRE SENTATIVES TO OBSERVE PROGRESS AND QUALITY OF
PORTION AS THE WORK IS COMPLETED. PROVIDE PROJECT REPRESENTATIV ES FULL ACCESS TO THE WORK, INCLUDING USE OF LIFT
DEVICES AND SCAFFOLDING, AS NEEDED, TO OBSERVE PROGRESS AND QU ALITY OF ALL PORTIONS OF THE WORK
NOTIFY OWNER IN ADVANCE OF TIMES WHEN CLEANING PROCESSES WI LL OCCUR. DO NOT PROCEED UNTIL OWNER HAS HAD
REASONABLE OPPORTUNITY TO BE AVAILABLE TO MAKE INSPECTIONS AND OBSERVATIONS OF WORK AREAS AND PROCESSES.
NOTIFY OWNER IN ADVANCE OF TIMES WHEN LIFT DEVICES AND SCAFFO LDING WILL BE RELOCATED. DO NOT RELOCATE LIFT DEVICES
AND SCAFFOLDING UNTIL OWNER HAS HAD REASONABLE OPPORTUNITY TO MAKE INSPECTIONS AND OBSERVATIONS OF WORK AREAS
AT LIFT DEVICE OR SCAFFOLD LOCATION.
MANUFACTURER'S FIELD SERVICE: ENGAGE CHEMICAL - CLEANER MANUF ACTURER'S FACTORY - AUTHORIZED SERVICE REPRESENTATIVES
FOR CONSULTATION AND PROJECT - SITE INSPECTION, TO PERFORM PRECO NSTRUCTION PRODUCT TESTING, AND PROVIDE ON- SITE
ASSISTANCE WHEN REQUESTED BY ARCHITECT. HAVE PAINT - REMOVER MA NUFACTURER'S AND CHEMICAL - CLEANER MANUFACTURER'S
FACTORY -AUTHORIZED SERVICE REPRESENTATIVES VISIT PROJECT SITE NOT LESS THAN FOUR TIMES TO OBSERVE PROGRESS AND
QUALITY OF THE WORK.
PRODUCTS : SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF THE FOLLOWING BASIS - OF - DESIGN
EFFLORESCENCE REMOVERS, BASED ON PRE - CONSTRUCTION CLEANING T
CAREFULLY DETACH FROM EXISTING CONST RUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELIVE
A. CHEMIQUE; EFFLORESCENCE REMOVER.
B.
C. CATHEDRAL STONE PRODUCTS, INC.; MASONRE LIGHT DUTY RUST REMOVER.
D. DUMOND CHEMICALS, INC.; SAFE ' N EASY EFFLORESCENCE REMOV
E. PROSOCO " SURE KLEAN 600
TO OWNER
DISASSEMBLE AND REINSTALL: CAREFULLY DETACH ITEMS FROM EXISTIN G CONSTRUCTION, PREPARE FOR REUSE, AND REINSTALL
WHERE INDICATED.
EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARENO T TO BE PERMANENTLY REMOVED AND THAT ARE NOT
OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR R EMOVED AND REINSTALLED.
DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FRO M A SURFACE, USING GENTLE METHODS AND EQUIPMENT TO
PREVENT DAMAGE TO THE ITEM AND SURFACES; DISPOSING OF ITEMS UN
SEQUENCE AND SCHEDULIN
WORK SEQUENCE: PERFORM MASONRY CLEANING WORK IN THE FOLLOWIN
AND OTHER SECTIONS:
1.
2.
3.
2.02
A.
ACCESSORY MATERIALS
LIQUID STRIPPABLE MASKING AGENT: MANUFACTURER'S STANDARD LIQUID, FILM-FORMING, STRIPPABLE MASKING MATERIAL FOR
PROTECTING GLASS, METAL, GLAZED MASONRY, AND POLISHED STONE S
ALKALINE MASONRY CLEANERS.
PRODUCTS : BASIS -OF -DESIGN LIQUID STRIPPABLE MASKING AGENT, BASED ON DES IGN -PHASE TESTING:
1.05
A.
A. PROSOCO, INC.; SURE KLEAN STRIPPABLE MASKING.
B.
C. PRICE RESEARCH, LTD; PRICE MASK.
D. OR EQUAL WITH ADVANCE WRITTEN APPROVAL OF THE ARCHITECT
OTHER PRODUCTS: SELECT MATERIALS AND METHODS OF USE BASED ONTH E FOLLOWING, SUBJECT TO APPROVAL OF A MOCKUP:
1.
2.
3.
4.
5.
MEANS OF ACCESSING AREAS OF WORK (SCAFFOLDING, SWING, LIFT, ETC.) ARE THE RESPONSIBILITY OF THE CONTRACTOR
REMOVE PLANT GROWTH.
CLEAN MASONRY ACCORDING TO THIS SECTION. THIS ENTAILS THE RE MOVAL OF DIRT, ATMOSPHERIC STAINS, AND OTHER
DISCOLORATION FROM BRICK AND STONE MASONRY.
NEUTRALIZE THE BRICK AND STONE SURFACES.
WHEN APPLICABLE FOLLOW PROCEDURES CALLED FOR IN SECTION 040 120 -MASONRY AND STONE RESTORATION.
4.
5.
SUBMITTALS
PRODUCT DATA: FOR EACH TYPE OF PRODUCT
1. INCLUDE MATERIAL DESCRIPTIONS AND APPLICATION INSTRUCTIONS.
2. INCLUDE TEST DATA SUBSTANTIATING THAT PRODUCTS COMPLY WITH REQUIREMENTS
QUALIFICATION DATA: FOR SITE PERSONNEL AND CHEMICAL CLEANINGPR ODUCT MANUFACTURERS.
CLEANING PROGRAM: DETAIL THE SEQUENCING AND SCHEDULING OF THE WORK, INCLUDING THE TIME REQUIRED FOR THE
NEUTRALIZATION OF THE SURFACES OF THE BRICK AND STONE. INCLUDE THE DETAILING OF ALL OF THE REQUIRED SITE ACCESS AND
PROTECTIONS REQUIRED FOR THE SITE AND ALL AREAS AND MATERIALS O
THIS SECTION.
QUALITY ASSURANCE
MASONRY CLEANING SPECIALIST QUALIFICATIONS: ENGAGE AN EXPERIEN CED MASONRY CLEANING FIRM TO PERFORM WORK OF THIS
SECTION. FIRM SHALL HAVE COMPLETED WORK SIMILAR IN MATERIAL, DE
WITH A RECORD OF SUCCESSFUL IN -SERVICE PERFORMANCE.
TREATMENT WORKER QUALIFICATIONS: WHEN MASONRY IS BEING CLEANE D OR PAINT BEING REMOVED, ASSIGN AT LEAST ONE
WORKER PER CREW WHO IS TRAINED AND CERTIFIED BY MANUFACTURER OF CLEANING PRODUCTS TO APPLY ITS PRODUCTS.
WORKMEN SHALL HAVE AT LEAST FIVE (5) YEARS' EXPERIENCE WITH THE PRODUCT BEING USED OR AN EQUAL PRODUCT.
INSTALLED CLEANING TEST PANELS: PROVIDE ONE SAMPLE AREA OF EACH CLEANING METHOD TO BE USED IN A LIMITED VISIBILITY
LOCATION WHERE DIRECTED BY THE ARCHITECT. REQUIRED MASONRY CLE ANING SHALL MATCH INSTALLED CLEANING TEST PANELS
ON THE BUILDING. DO NOT DISTURB EXISTING CLEANING TEST PANELSU NTIL COMPLETION OF MASONRY CLEANING OPERATIONS.
CLEANING TEST PANELS SHALL SERVE AS A QUALITY STANDARD FOR ALLM ASONRY CLEANING. THE INTENT OF THE CLEANING
PROGRAM IS TO CLEAN THE MASONRY EFFECTIVELY WITHOUT DAMAGING THE MASONRY, USING THE LEAST AGGRESSIVE CLEANING
METHOD.
QUALITY-C ONTROL PROGRAM: PREPARE A WRITTEN QUALITY- CONTROL PR OGRAM FOR THIS PROJECT TO SYSTEMATICALLY
DEMONSTRATE THE ABILITY OF PERSONNEL TO PROPERLY FOLLOW METHO DS AND USE MATERIALS AND TOOLS WITHOUT DAMAGING
MASONRY. INCLUDE PROVISIONS FOR SUPERVISING PERFORMANCE AND P REVENTING DAMAGE.
CLEANING PROGRAM: PREPARE A WRITTEN CLEANING PROGRAM THAT DES
MATERIALS, METHODS, SEQUENCE, AND EQUIPMENT TO BE USED; PROTEC TION OF SURROUNDING MATERIALS; AND CONTROL O
RUNOFF DURING OPERATIONS.
1.
MINIMAL POSSIBILITY OF DAMAGING EXPOSED SURFACES.
CONSISTENCY OF EACH APPLICATION.
UNIFORMITY OF THE RESULTING OVERALL APPEARANCE.
1.06
A.
REMOVE, ALTER, OR HARM THE PRESENT CONDITION OR FUTURE P
SURROUNDING SURFACES NOT IN CONTRACT.
LEAVE RESIDUE ON SURFACES.
B.
C.
PART 3 -
3.01
A.
1.07
A.
CLEANING LEVEL DESCRIPTIONS
LEVEL 1: CLEAN WATER WASH EXTERIOR MASONRY IN IT' S ENTIRETY WITH LOW PRESSURE SPRAY, 100 PSI MAXIMUM, WITH CLEAN
POTABLE WATER.
LEVEL 2: APPLY MILD ACIDIC BIOLOGICAL SOIL REMOVER, APPROVEDPRODU CT, ACCORDING TO MANUFACTURER' S INSTRUCTIONS,
RINSE THOROUGHLY WITH CLEAN POTABLE WATER. PROVIDE TEST AREA FOR
RESTORATION SPECIALIST, SPRAY PRESSURE TO BE AT 100 TO 200 PSIOR A S DIRECTED BY THE ARCHITECT BASED ON THE
CONDITION OF THE MASONRY AND TEST AREA RESULTS. UTILIZE MEASURES TO REDUCE WASH - DOWN STREAKING OF AREAS OUTS
THE SPECIFIC CLEANING AREA.
LEVEL 3: AT MORE HEAVILY DISCOLORED AREAS, PERFORM LEVEL 2 CLEANIN
DETERMINED BY THE ARCHITECT OR RESTORATION SPECIALIST, PROVIDEA N EW TEST AREA USING A MORE AGGRESSIVE APPROVE
CLEANING PRODUCT ACCORDING TO MANUFACTURER 'S SPECIFICATIONS. RINSE THOROUGHLY WITH CLEAN POTABLE WATER, SPRA
PRESSURE TO BE SET AS DIRECTED BY THE ARCHITECT BASED ON THE COND
UTILIZE MEASURES TO REDUCE WASH- DOWN STREAKING OF AREAS OUTSIDE
PROTECTION
REMOVE GUTTERS AND DOWNSPOUTS AND ASSOCIATED HARDWARE ADJACE
MASONRY CLEANING. REINSTALL WHEN REPAIRS ARE COMPLETE
1. PROVIDE TEMPORARY RAIN DRAINAGE DURING WORK TO DIRECT WATER AWAY FROM BUILDING.
COMPLY WITH EACH MANUFACTURER'S WRITTEN INSTRUCTIONS FOR PROTEC TING BUILDING AND OTHER SURFACES AGAINST DAMA
FROM EXPOSURE TO ITS PRODUCTS. PREVENT PAINT REMOVERS AND CHEMIC AL CLEANING SOLUTIONS FROM COMING INTO CONTA
WITH PEOPLE, MOTOR VEHICLES, LANDSCAPING, BUILDINGS, AND OTHERSU RFACES THAT COULD BE HARMED BY SUCH CONTACT.
1. COVER ADJACENT SURFACES WITH MATERIALS THAT ARE PROVEN TO RES IST PAINT REMOVERS AND CHEMICAL CLEANERS USED
UNLESS PRODUCTS BEING USED WILL NOT DAMAGE ADJACENT SURFACES .USE PROTECTIVE MATERIALS THAT ARE WATERPROO
AND UV RESISTANT. APPLY MASKING AGENTS ACCORDING TO MANUFACT URER'S WRITTEN INSTRUCTIONS. DO NOT APPLY LIQUI
STRIPPABLE MASKING AGENT TO PAINTED OR POROUS SURFACES. WHEN NO LONGER NEEDED, PROMPTLY REMOVE MASKING TO
PREVENT ADHESIVE STAINING.
KEEP WALL WET BELOW AREA BEING CLEANED TO PREVENT STREAKINGF
DO NOT CLEAN MASONRY DURING WINDS OF SUFFICIENT FORCE TO SPRE AD CLEANING SOLUTIONS TO UNPROTECTED SURFACE
NEUTRALIZE AND COLLECT ALKALINE AND ACID WASTES FOR DISPOSAL O FF OWNER' S PROPERTY.
DISPOSE OF RUNOFF FROM CLEANING OPERATIONS BY LEGAL MEANS AND IN A MANNER THAT PREVENTS SOIL EROSION,
UNDERMINING OF PAVING AND FOUNDATIONS, DAMAGE TO LANDSCAPIN G,AND WATER PENETRATION INTO BUILDING INTERIO
3.02
A.
IF MATERIALS AND METHODS OTHER THAN THOSE INDICATED ARE PRO POSED FOR ANY PHASE OF CLEANING WORK, ADD TO THE
QUALI TY- CONTROL PROGRAM A WRITTEN DESCRIPTION OF SUCH MATE RIALS AND METHODS, INCLUDING EVIDENCE OF
SUCCESSFUL USE ON COMPARABLE PROJECTS, AND DEMONSTRATIONS TO SHOW THEIR EFFECTIVENESS FOR THIS PROJECT.
CLEANING APPEARANCE STANDARD: CLEANED SURFACES ARE TO HAVE A UNIFORM APPEARANCE AS VIEWED FROM 15 FEET (4.6 M)
AWAY BY ARCHITECT. PERFORM ADDITIONAL DIRT AND STAIN REMOVAL,
THAT ARE NOTICEABLY DIFFERENT, SO THAT THE SURFACE BLENDS SMOO THLY INTO SURROUNDING AREAS
LARGE - SCALE MOCK -UP S: PREPARE TWO (2) MOCKUPS OF CLEANING ON E XISTING SURFACES. THE PURPOSE OF THE MOCK -UPS IS TO
DEMONSTRATE AESTHETIC EFFECTS, SET QUALITY STANDARDS FOR MATER IALS AND EXECUTION, AND CONFIRM CONDITION OF
UNDERLYING MASONRY
1.
2.
3.
4.
5.
CLEAN AN AREA APPROXIMATELY 10 FT. WIDE AND 10 FT. HIGH FOREA CH MOCKUP, TO INCLUDE BRICK, STONE FOUNDATIONS,
AND STONE SILLS AND LINTELS. MOCKUPS WILL BE LOCATED WHERE IDENTIFIED BY THE ARCHITECT AND READILY ACCESSIBLE
FOR REVIEW BY THE ARCHITECT AND OWNER.
COORDINATE WITH ARCHITECT TO PROVIDE REVIEW OF COMPLETED LA RGE-SCALE MOCKUPS
APPROVAL OF MOC K-UPS DOES NOT CONSTITUTE APPROVAL OF DEVIA
MOCK- UPS UNLESS ARCHITECT SPECIFICALLY APPROVES SUCH DEVIAT IONS IN WRITING.
3.03
A.
CLEANING MASONRY, GENERAL
PROVIDE CONTAINMENT SYSTEM TO COLLECT ALL CHEMICAL AND WATERRU
CHEMICAL CLEANERS OR RINSE WATER TO RUN DOWN THE FACE OF THE BUI LDING BELOW THE AREA BEING CLEANED.
1. LEGALLY DISPOSE OF ALL CHEMICALS AND WATER OF F- SITE.
CONTRACTOR SHALL MONITOR THE CONDITIONS INTERIOR AND EXTERIOR O F THE BUILDING DURING THE APPLICATION OF WATER
ASSURE THAT CLEANING DOES NOT CAUSE WATER ENTRY TO THE INTERIOR AS WELL AS PROPER CONTROL OF RUNOFF WATER TO T
EXTERIOR. IF UNDESIRABLE CONDITIONS OCCUR DURING CLEANING, WATER APPLICATION SHALL BE STOPPED UNTIL THE CONDITI
IS RESOLVED.
PROCEED WITH CLEANING IN AN ORDERLY MANNER; WORK FROM TOP TOBO TTOM OF EACH SCAFFOLD WIDTH AND FROM ONE END
EACH ELEVATION TO THE OTHER. ENSURE THAT DIRTY RESIDUES AND RINSE WATER DO NOT WASH OVER DRY, CLEANED SURFACES
USE ONLY THOSE CLEANING METHODS INDICATED FOR EACH MASONRY MATE RIAL AND LOCATION.
1. BRUSHES: USE NATURAL - FIBER BRISTLE BRUSHES. DO NOT USE WIRE BR
CHEMICAL CLEANER BEING USED. DO NOT USE PLASTIC- BRISTLE BRUSH ES IF NATURAL- FIBER BRUSHES WILL RESIST CHEMICA
CLEANER BEING USED
SPRAY EQUIPMENT: USE SPRAY EQUIPMENT THAT PROVIDES CONTROLLED APPLICATION AT VOLUME AND PRESSURE INDICATED,
MEASURED AT SPRAY TIP. ADJUST PRESSURE AND VOLUME TO ENSURE TH AT CLEANING METHODS DO NOT DAMAGE MASONRY.
2.
3.
APPROVED MOC K-UPS MAY BECOME PART OF THE COMPLETED WORK I F UNDISTURBED AT TIME OF SUBSTANTIAL
COMPLETION.
PROJECT/SITE CONDITIONS
PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUIL
BUILDING SITE, AND SURROUNDING BUILDINGS FROM INJURY RESULTING FROM MASONRY CLEANING WORK. ERECT TEMPORAR
PROTECTION COVERS AS REQUIRES
WEATHER LIMITATIONS: PROCEED WITH INSTALLATION ONLY WHEN EXIST ING AND FORECASTED WEATHER CONDITIONS PERMIT
REPAIR WORK TO BE PERFORMED ACCORDING TO PRODUCT MANUFACTURE RS' WRITTEN INSTRUCTIONS AND SPECIFIED
REQUIREMENTS AND WITHIN TEMPERATURE LIMITS AS DEFINED BELOW:
1. TEMPERATURE LIMITS, GENERAL: CLEAN MASONRY, INCLUDING STUCC O, BRICK AND STONE UNITS ONLY WHEN AIR TEMPERATURE
IS BETWEEN 45 AND 90 DEG F (7 AND 32 DEG C) AND IS PREDICTED T O REMAIN SO FOR AT LEAST SEVEN DAYS AFTER
COMPLETION OF THE WORK
NO MASONRY CLEANING SHALL BE COMPLETED WHEN AIR TEMPERATUR EIS BELOW 45 DEG F (7 DEG C) OR ABOVE 90 DEG F (32
DEG C) FOR AT LEAST SEVEN DAYS AFTER COMPLETION OF THE WORK.
1.08
A.
0014//2007//22002266
A.
B.
EQUIP UNITS WITH PRESSURE GAGES
FOR CHEMICAL -CLEANER SPRAY APPLICATION, USE LOW- PRESSUR E TANK OR CHEMICAL PUMP SUITABLE FOR CHEMICAL
CLEANER INDICATED, EQUIPPED WITH NOZZLE HAVING A CONE-S HAPEDSPRAY.
FAN -SP RAY ANGLE IN FIRST SUBPARAGRAPH BELOW IS CONSIDER ED EFFICIENT FOR LOW AND MEDIUM PRESSURE AND
LESS HARMFUL THAN SPRAYS WITH NARROWER ANGLES. NEVER U
DEGREES.
FOR WATER -SPRAY APPLICATION, USE FAN -SHAPED SPRAY THAT D ISPERSES WATER AT AN ANGLE OF 25 TO 50 DEGREES
FOR MEDIU M-P RESSURE WATER -SPRAY APPLICATION, USE FAN-SH APED SPRAY THAT DISPERSES WATER AT AN ANGLE OF
LEAST 40 DEGREES.
FOR HEATED WATER - SPRAY APPLICATION, USE EQUIPMENT CAPAB LE OF MAINTAINING TEMPERATURE BETWEEN 140 AND
160 DE GF AT FLOW RATES INDICATED.
FOR STEAM APPLICATION, USE STEAM GENERATOR CAPABLE OF D ELIVERING LIVE STEAM AT NOZZLE.
PERFORM EACH CLEANING METHOD INDICATED IN A MANNER THA T RESULTS IN UNIFORM COVERAGE OF ALL SURFACES,
INCLUDING CORNERS, MOLDINGS, AND INTERSTICES, AND THAT P RODUCES AN EVEN EFFECT WITHOUT STREAKING OR
DAMAGING MASONRY SURFACES. KEEP WALL WET BELOW AREA BE ING CLEANED TO PREVENT STREAKING FROM RUNOFF.
PERFORM ADDITIONAL GENERAL CLEANING, PAINT AND STAIN REM OVAL, AND SPOT CLEANING OF SMALL AREAS THAT A
NOTICEABLY DIFFERENT WHEN VIEWED ACCORDING TO THE "CLEA
QUALITY ASSURANCE ARTICLE, SO THAT CLEANED SURFACES BLEN D SMOOTHLY INTO SURROUNDING AREAS.
WATER -SPRAY APPLICATION METHODS:
WATER- SOAK APPLICATION: SOAK MASONRY SURFACES BY APPLYING WATER CONTINUOUSLY AND UNIFORMLY TO
LIMITED AREA FOR TIME INDICATED. APPLY WATER AT LOW
SPRAYS USING PERFORATED HOSES OR MULTIPLE SPRAY NOZZLES. ERECT A PROTECTIVE ENCLOSURE
CONSTRUCTED OF POLYETHYLENE SHEETING TO COVER AREA BEING S PRAYED.
UNLESS OTHERWISE INDICATED, HOLD SPRAY NOZZLE AT LEAST 6 INCHES FROM MASONRY SURFACE AND APPLY
WATER IN HORIZONTAL BACK - AND- FORTH SWEEPING MOTION, OVERL
UNIFORM COVERAGE
PART 2 -
2.01
A.
CLEANING MATERIAL
GENERAL: PRODUCTS NAMED BELOW HAVE BEEN SELECTED BASED ON LA BORATORY TESTING.
1.
PROVIDE ADDITIONAL MOC K-UPS AT CONTRACTOR' S EXPENSE TO DEMONSTRATE THAT PROPOSED PRODUCT MEETS THE
REQUIREMENT OF THE CONTRACT DOCUMENTS. INSTALL MOCK - UPS IN THE PRESENCE OF THE ARCHITECT.
D.
E.
B.
C.
D.
DETERGENT SOLUTION, JOB MIXED: SOLUTION PREPARED BY MIXING 2CU PS (0.5L) OF TETRASODIUM PYROPHOSPHATE (TSPP), 1/2
CUP (125 ML) OF LAUNDRY DETERGENT, AND 20 QUARTS (20 L) OF HOTW ATER FOR EVERY 5 GAL. (20 L) OF SOLUTION REQUIRE
MOLD, MILDEW, AND ALGAE REMOVER, JOB MIXED: SOLUTION PREPARED BY MIXING 2 CUPS (0.5 L) OF TETRASODIUM
PYROPHOSPHATE (TSPP), 5 QUARTS (5 L) OF 5 PERCENT SODIUM HYPOCHL ORITE (BLEACH), AND 15 QUARTS (15 L) OF HOT WATER FOR
EVERY 5 GAL. (20 L) OF SOLUTION REQUIRED.
ANTIMICROBIAL CLEANER: MANUFACTURER'S STANDARD LIQUID CLEANER FORMULATION CONTAINING QUATERNARY COMPOUNDS OR
QUATERNARY AMMONIA, WETTING AGENTS, SURFACTANTS, AND BUFFERS
ORGANIC SOILING FROM ORDINARY BUILDING MATERIALS, INCLUDING PO
BIODEGRADABLE PH 5. 5 - 9.5, SAFE FOR LANDSCAPING PLANTS AND GRAS
1.
G.
E.
FACADE
IMPROVEMENTS
PRODUCTS : SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF THE FOL LOWING BASIS- OF- DESIGN ANTIMICROBIAL
CLEANERS, BASED ON PRE- CONSTRUCTION CLEANING TESTS
A. B. C.
D.
129 E MAIN STREET
NORRISTOWN, PA 19401
NON - ACIDIC CLEANER: MANUFACTURER' S STANDARD NEUTRAL OR MILDLY ALKALINE CLEANER CONTAINING DETERGE NTS WITH
ALCOHOL ETHOXYLATES OR 2-B UTOXYETHANOL FOR REMOVING LIGHT TO MODERATE SOILING INCLUDING BLACK CARBON AND
ATMOSPHERIC STAINING FROM MASONRY.
1.
CHEMICAL- CLEANER APPLICATION METHODS: APPLY CHEMICAL CL
CHEMICAL- CLEANER MANUFACTURER'S WRITTEN INSTRUCTIONS; USE BRUSH OR SPRAY APPLICATION. DO NOT SPRAY AP
AT PRESSURES EXCEEDING 50 PSI. DO NOT ALLOW CHEMICALS TO
THOSE INDICATED OR RECOMMENDED IN WRITING BY MANUFACTU
RINSE OFF CHEMICAL RESIDUE AND SOIL BY WORKING UPWARD F ROM BOTTOM TO TOP OF EACH TREATED AREA AT EAC
STAGE OR SCAFFOLD SETTING. PERIODICALLY DURING EACH RINS E, TEST PH OF RINSE WATER RUNNING OFF OF CLEANE
AREA TO DETERMINE THAT CHEMICAL CLEANER IS COMPLETELY RE
1. APPLY NEUTRALIZING AGENT AND REPEAT RINSE IF NECES SARY TO PRODUCE TESTED PH OF BETWEEN 6.7 AND 7.
AFTER CLEANING IS COMPLETE, REMOVE PROTECTION NO LONGER
PRODUCTS : SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF THE FO LLOWING BASIS -OF -DESIGN NON- ACIDIC
CLEANERS:
A. B. C.
D.
E.
ACIDIC CLEANER: MANUFACTURER' S STANDARD ACIDIC MASONRY CLEANER COMPOSED OF HYDROFLUORIC ACID OR AMMONIUM
BIFLUORIDE BLENDED WITH OTHER ACIDS, DETERGENTS, WETTING AGENT
STAINING FROM MASONRY.
1.
3.04
A.
PRELIMINARY CLEANING
REMOVING PLANT GROWTH: COMPLETELY REMOVE VISIBLE PLANT, MOSS, AN D SHRUB GROWTH FROM MASONRY SURFACES.
CAREFULLY REMOVE PLANTS, CREEPERS, AND VEGETATION BY CUTTING AT R OOTS AND ALLOWING REMAINING GROWTH TO DRY AS
LONG AS POSSIBLE BEFORE REMOVAL. REMOVE LOOSE SOIL AND PLANT DEB
OCCUR
PRELIMINARY CLEANING: BEFORE BEGINNING GENERAL CLEANING, REMOVE
PLANNED CLEANING METHODS. EXTRANEOUS SUBSTANCES INCLUDE PAINT,
1. CAREFULLY REMOVE HEAVY ACCUMULATIONS OF RIGID MATERIALS FROM
SCRATCH OR CHIP MASONRY SURFACE.
PRODUCTS : SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF THE FO LLOWING BASIS -OF
CLEANERS:
A. B. C.
D.
BRICK CLEANING
SPECIFICATIONS
A - 012
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project: Police Station Renovations - Phase 1 Ref. #: Colwyn Borough, Delaware County

PennBid

Bid Due: 7/30/2026

Project: Lebanon County Municipal Building - Phase II Renovations, 400 South 8th Street,

PennBid

Bid Due: 8/06/2026

Project: CD 50-7.5c - Brentwood ADA Curb Ramps Project Ref. #: South Hills

PennBid

Bid Due: 7/30/2026

Project: IN-1260 Work Order Construction Contracts Ref. #: Indiana University of PA, Indiana,

PennBid

Bid Due: 8/18/2026