Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Jan 28, 2026 06:26 pm EST
- Original Published Date: Jan 27, 2026 06:37 pm EST
- Updated Date Offers Due: Feb 27, 2026 04:00 pm EST
- Original Date Offers Due: Feb 24, 2026 04:00 pm EST
- Inactive Policy: Manual
- Updated Inactive Date: Mar 28, 2026
- Original Inactive Date: Mar 28, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: Y1EZ - CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Princeton , NJ 08543USA
There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump
House/D45 Rad Waste Handling Facility) which are past their useful life requiring costly
maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,
and flashing. Portions of existing metal coping have pulled away during storm events causing
large sections of membrane to separate from the substrate. A catastrophic failure to one of
these roofs would negatively impact the ability to conduct the top priority experimental
operations in the Laboratory.
1.2. SCOPE
1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise
required replace the noted roofs and specified components per the associated contract
documents. Construction scope includes the following:
1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:
1.2.1.1.1. C50 – ESAT Building
1.2.1.1.2. C52 – PLT Power Building
1.2.1.1.3. C60 – C Site Pump House
1.2.1.1.4. D45 – Rad Waste Handling Facility
1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,
flashing, coping and any other miscellaneous roofing material accessories.
1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be
provided to PPPL.
1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within
this SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,
and metal/concrete roof panels.
1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof
installation. Any equipment that should be temporarily relocated so roof replacement
work can be completed shall be the responsibility of the roofing contractor.
1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.
1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.
1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered
to coverboard.
1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other
roofing components as required for manufacturer’s warranty.
Page 3 of 21
1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,
cover board, and insulation.
1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing
building envelope are required to accommodate additional insulation.
1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations
and as necessary to meet manufacturer’s requirements.
1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all
manufacturer specifications to obtain a minimum manufacturer system warranty of
30 years along with a 2-year installers warranty. The warranty coverage shall
include incidental membrane punctures, damage from hail and a minimum of 72-
mph peak gust wind speeds.
1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet
for details.
1.2.1.12. New and higher curbs as required due to the new roof installation work.
1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.
1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT
building roof.
1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.
1.2.1.16. Contractor to replace all existing roof scuppers with new.
1.2.1.17. Contractor to replace all existing roof drains with new.
1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof
membrane system and provide written confirmation the systems are compatible.
1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems
identified on roof sections.
1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT
building roof.
1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to
assist the abatement contractor to bring the sealed roofing material down from roof area
to grade with lift equipment. Coordination of this work shall be completed in concert with
all other construction activities. The subcontractor to follow directly after PPPL
abatement contractor to install new roofing system. The construction subcontractor shall
be responsible to coordinate all work with PPPL.
1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a
minimum of 72 hours prior. All equipment that will be out of service shall be minimized.
1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.
THERE ARE (5) COVER LETTER SECTIONS TO THE RFP. THERE ARE FILES ATTACHED TO EACH COVER LETTER. TO VIEW THE ATTACHMENTS YOU MUST
(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.
(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)
YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN. BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES
- 100 Stellarator Rd.
- Princeton , NJ 08540
- USA
- Jimmy Russell
- jrussell@pppl.gov
- Phone Number 6092433963
- Jan 28, 2026 06:26 pm ESTSolicitation (Updated)
- Jan 27, 2026 06:37 pm EST Solicitation (Original)
Related Document
| Jan 27, 2026 | [Solicitation (Original)] Multi -Roof Replacement Project |
See Also
Bid Title: Lakeside Avenue Phase I Improvements Project Category: Construction Status: Open Publication
Pompton Lakes borough
Due by 9/23/2026
Follow Construction of the Power Generation with Microgrid at Joint Base McGuire-Dix-Lakehurst (JBMDL),
DEPT OF DEFENSE
Due by 9/28/2026
Bid # C-26-013 : Preakness Valley Golf Course Maintenance Building Phase 2 Opportunity
Passaic County
Due by 9/25/2026
COMMERCIAL FLOORING CONSTRUCTION AND INSTALLATION City of Somers Point Request for Proposal This
Somers Point city
Due by 9/21/2026