MORGAN CREEK AERIAL REPLACEMENTS PROGRESSIVE DESIGN-BUILD PROJECT
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 19, 2025 |
| Due Date: | Apr 17, 2025 |
| Solicitation No: | 460-376-05 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 460-376-05 |
| Project Title: | MORGAN CREEK AERIAL REPLACEMENTS PROGRESSIVE DESIGN-BUILD PROJECT |
| Description: | This Request for Proposals (RFQ) for Progressive Design-Build Services for the design and construction of the Morgan Creek Aerial Replacement (Project) is issued by Orange Water and Sewer Authority (Owner) to invite the submittal of Proposals according to the requirements set forth in this RFQ. The Owner is planning improvements to seven (7) gravity sanitary sewer aerial crossings located along Morgan Creek. In 2023 a condition assessment of these aerial crossings was completed after multiple failures occurred over the last several years. These seven (7) crossings were reported as critical for immediate action to avoid future failures and sanitary sewer overflows within Morgan Creek. Defects identified in the report include but are not limited to manholes partially or nearly exposed in the creek bank, significantly deteriorated pipe walls, and exposed pier bases. The Project will include the planning, design, and construction necessary to place the Project in full operation according to requirements contained herein. The Project is to be delivered in two phases, using the progressive design-build delivery method, as follows: · Phase 1 Services (preconstruction phase): Prepare design to 60-percent complete, as described in Draft Progressive Design-Build Agreement (Agreement) (Scope of Design-Builder Services), and prepare a Phase 2 Services Proposal including a Guaranteed Maximum Price (GMP) for consideration by the Owner; and · Phase 2 Services (final design and construction phase): Complete design, construction, and post-construction tasks, including required testing, and any applicable operator training and support. |
| Opening Date: | 4/17/2025 2:00 PM |
| Posted Date: | 3/19/2025 |
| Status: | Open |
| Department: | ORANGE WATER & SEWER AUTHORITY |
|
Solicitation Number
*
460-376-05
|
Department
ORANGE WATER & SEWER AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2025-04-17T14:00:00.0000000
|
Posted Date
*
2025-03-19T11:13:04.0000000Z
|
Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
This Request for Proposals (RFQ) for Progressive Design-Build Services for the design and construction of the Morgan Creek Aerial Replacement (Project) is issued by Orange Water and Sewer Authority (Owner) to invite the submittal of Proposals according to the requirements set forth in this RFQ. The Owner is planning improvements to seven (7) gravity sanitary sewer aerial crossings located along Morgan Creek. In 2023 a condition assessment of these aerial crossings was completed after multiple failures occurred over the last several years. These seven (7) crossings were reported as critical for immediate action to avoid future failures and sanitary sewer overflows within Morgan Creek. Defects identified in the report include but are not limited to manholes partially or nearly exposed in the creek bank, significantly deteriorated pipe walls, and exposed pier bases. The Project will include the planning, design, and construction necessary to place the Project in full operation according to requirements contained herein. The Project is to be delivered in two phases, using the progressive design-build delivery method, as follows: · Phase 1 Services (preconstruction phase): Prepare design to 60-percent complete, as described in Draft Progressive Design-Build Agreement (Agreement) (Scope of Design-Builder Services), and prepare a Phase 2 Services Proposal including a Guaranteed Maximum Price (GMP) for consideration by the Owner; and · Phase 2 Services (final design and construction phase): Complete design, construction, and post-construction tasks, including required testing, and any applicable operator training and support.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
MK00207 POC ID/IQ TREE AND BRUSH REMOVAL PRIMARY AND SECONDARY ROUTES WITHIN ASHE
Division of Highways
Due by 10/01/2026
MK00206 POC ID/IQ TREE AND BRUSH REMOVAL PRIMARY AND SECONDARY ROUTES WITHIN AVERY,
Division of Highways
Due by 10/01/2026
MK00205 POC ID/IQ TREE AND BRUSH REMOVAL PRIMARY/INTERSTATE AND SECONDARY ROUTES WITHIN ALLEGHANY,
Division of Highways
Due by 10/01/2026
MK00207 POC ID/IQ TREE AND BRUSH REMOVAL PRIMARY AND SECONDARY ROUTES WITHIN ASHE
Division of Highways
Due by 10/01/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.