Mooresville Middle School Roof Replacement Project

Agency: State Government of North Carolina
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238160 - Roofing Contractors
Posted Date: Feb 12, 2026
Due Date: Feb 27, 2026
Solicitation No: 215-021226
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Solicitation Number: 215-021226
Project Title: Mooresville Middle School Roof Replacement Project
Description: The Mooresville Graded School District is seeking proposals from qualified, skilled, experienced contractors to replace a portion of the roof at Mooresville Middle School; located at 233 Kistler Farm Road in Mooresville, NC.
Opening Date: 2/27/2026 12:00 PM
Posted Date: 2/13/2026
Status: Open
Department: MOORESVILLE CITY SCHOOLS
Solicitation Number
*
215-021226
Department
MOORESVILLE CITY SCHOOLS
Status Reason
Open
Opening Date
2026-02-27T12:00:00.0000000
Posted Date
*
2026-02-12T18:29:25.0000000Z
Commodity Code
Roofing and siding and sheet metal services
Mandatory Conference/Site Visit
Special Instructions
Solicitation Type
*
Select RFP IFB RFI
Owner
Angela Davis
Description
The Mooresville Graded School District is seeking proposals from qualified, skilled, experienced contractors to replace a portion of the roof at Mooresville Middle School; located at 233 Kistler Farm Road in Mooresville, NC.
Attachments

Attachment Preview

MOORESVILLE GRADED SCHOOL DISTRICT
REQUEST FOR PROPOSALS
MOORESVILLE MIDDLE SCHOOL ROOF
REPLACEMENT PROJECT
QUESTION DEADLINE:​ ​
2:00PM EST, FEBRUARY 24, 2026
QUALIFICATIONS/BID DEADLINE:​ 12:00PM EST, FEBRUARY 27, 2026
1
Contact Information
Direct Inquiries To:​
​​​​
​​​​
​​​​
Todd Neel
MGSD Director of Maintenance
tneel@mgsd.k12.nc.us
704.658.2632
Submittals
Send Proposals To:​​
​​​​
​​​​
​​​​
Todd Neel
MGSD Director of Maintenance
tneel@mgsd.k12.nc.us
Important Notes:
Proposals containing changes to any terms and conditions listed within this
solicitation may render the proposal as unacceptable and unresponsive for reward.
All inquiries are to be made in writing and submitted to the individual listed above.
Any attempt to contact any elected local officials or school system administration
may result in disqualification of the proposal.
It is the sole responsibility of the Firm to assure all addenda have been received
prior to submission.
Mooresville Graded School District assumes no liability for any costs associated
with preparation or submission of proposals. Additionally, Mooresville Graded
School District reserves the right to accept or reject any or all proposals, to accept a
portion of any proposal or to cancel this RFP in its entirety.
2
I.​ INTRODUCTION
The Mooresville Graded School District (MGSD) is seeking proposals from qualified, skilled,
experienced contractors to replace a portion of the roof at Mooresville Middle School; located at
233 Kistler Farm Road in Mooresville, NC.
II.​ SCOPE OF WORK
This Scope of Work (SOW) outlines the requirements for a turn-key replacement of
approximately 4,800 square feet of modified bitumen roofing, including mechanical adjustments,
facade repairs, and site management.
Project Overview
The contractor shall provide all labor, materials, equipment (including cranes), and specialized
subcontractors (MEP and Roofing) to perform a complete “rip and replace” of the designated
roof area (see Attachment A). The goal is a fully warranted, watertight system with all
integrated mechanical and structural components in peak condition.
General Requirements & Site Preparation
Permitting: Obtain all necessary local building and trade permits
Safety: Adhere to OSHA standards, including fall protection and pedestrian barricades
Project Management: Provide a single point of contact to coordinate all trades (Roofing,
Mechanical, Electrical, Plumbing)
Equipment: Provide a crane and licensed operator for the lifting of RTUs (roof top units)
and materials.
Demolition & Disposal
Tear-off: Remove the existing modified bitumen membrane, insulation, and flashing
down to the structural deck (approx. 4,800 sq ft)
Inspection: Inspect the underlying deck for rot or structural damage. Note: Replacement
of damaged decking to be handled via a pre-negotiated change order rate.
Waste: Provide dumpsters and haul away all debris to an approved, legal landfill site.
Roofing Installation (Modified Bitumen)
Insulation: Install a new thermal insulation layer (R-value per local code) and tapered
insulation where necessary to ensure positive drainage.
3
Membrane: Install a high-performance 2-ply Modified Bitumen system (Base sheet and
Granulated Cap sheet) using the manufacturer’s recommended method.
Flashing: Install new base flashings at all walls, curbs, and penetrations.
Edge Metal: Install new pre-finished gravel stops or coping caps to match existing
aesthetics.
Mechanical, Electrical, & Plumbing (RTU support)
Disconnection: Have licensed MEP subcontractors disconnect electrical, gas lines, and
condensate drains for all RTUs in the work area.
Crane Ops: Lift RTUs to allow for curb modification/repair.
Curb Repair: Repair or replace RTU curbs to ensure they meet the minimum 8” height
requirement above the new roof surface.
Reconnection: Reset RTUs, reconnect all utilities, and test for proper operation.
Facade & Drainage
Facade Repair: Inspect and repair the building facade/parapet walls adjacent to the roof.
This includes tuck-pointing masonry, sealing cracks, or replacing damaged siding
to prevent moisture migration behind the new flashing.
Drainage System: **Perform a water test on all existing roof drains to ensure they are
free flowing.**
Clear any minor blockages.
Install new clamping rings and cast-iron strainers
Replace any rusted or damaged primary drain components within the
scope area.
Closeout & Warranty
Cleanup: Perform a final “magnetic sweep” of the grounds to remove nails and metal
debris.
Warranty: Provide a minimum 20-year Manufacturer’s NDL (No Dollar Limit)
Warranty and a 2-year Contractor Workmanship Warranty.
Walkthrough: Conduct a final inspection with the owner’s representative.
III.​ FORMAL DOCUMENTATION
Reference Attachment A for an aerial view of the location of the section of roof (approximately
4,800 square feet) that is referenced in the Project. The section of roof is outlined and marked in
ORANGE.
4
IV.​ SELECTION PROCESS
MGSD will review the proposals and may request interviews. If contacted, the Firm should
make themselves available and be ready to provide a presentation of the proposal submitted. All
costs associated with the proposal and presentation shall be at no cost to MGSD. MGSD
reserves the right to reject any or all proposals.
A Master Agreement will be sent to the selected firm. If no agreement can be reached, MGSD
will contact another qualified firm.
V.​ RFP QUESTIONS
Questions are to be submitted via email to the individual listed on page two of this solicitation
document. Subject line shall be: RFP- Mooresville MS. Only emailed questions will be
addressed and answered. Written response is the only official method by which interpretation,
clarification, or additional information will be given. Oral interpretations or clarifications will be
without legal effect. No personal inquiry or marketing meetings will be conducted or allowed.
MGSD will not entertain any questions after the deadline date provided on page one of this
solicitation document.
VI.​ PROPOSAL SUBMITTAL FORMAT AND CONTENTS
The instructions below provide guidance and information to prepare concise responses to this
RFP. The purpose is to establish the format and contents of the proposal so responses are
complete, contain all essential information and can be easily evaluated.
VII.​ PROPOSAL FORMAT
Proposals are not to exceed 20 pages, and must be presented in a well-organized and concise
manner. A single volume booklet is preferred. Cover page, Certificate of Insurance, resumes,
and blank pages are not counted towards the limit. A page is defined as an 8.5” x 11” or 11” x
17” sheet that contains text, graphics, or other printed material.
VIII.​ PROPOSAL CONTENT
The following items must be addressed in your package:
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

DN01118 (WBS DF18314.2045332) POC DN01118 (WBS DF18314.2045332) GRADING, DRAINAGE, PAVING, AND STRUCTURE AT

Division of Highways

Bid Due: 6/09/2026

REQUEST FOR QUOTATION (RFQ): Northwest Elementary School Auditorium Rooftop Heat Pump HVAC System

Lenoir County Public Schools

Bid Due: 7/09/2026

Solicitation Number: 487-VCW DER Phase 2 Project Title: Valerie C Woodard Building Deep

State Government of North Carolina

Bid Due: 6/24/2026

Project: Bonlyn Storm Drainage Improvement Project Ref. #: FY27-ITBCON-05 Department: Charlotte Water Type:

City of Charlotte

Bid Due: 6/16/2026