MONROE COUNTY
LAND BANK
AUTHORITY
SITE
A-1
MONROE COUNTY
LAND BANK
AUTHORITY
A-2
SECTION 024116 - STRUCTURE DEMOLITION
SECTION 01 35 43.13 - ENVIRONMENTAL PROCEDURES FOR HAZARDOUS MATERIALS SECTION 024116 - STRUCTURE DEMOLITION (CONTINUED)
PART 1 - GENERAL 3.5 DEMOLITION
PART 1 - GENERAL
A. GENERAL: DEMOLISH INDICATED BUILDINGS AND SITE IMPROVEMENTS COMPLETELY. USE METHODS REQUIRED TO COMPLETE THE
WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AND AS FOLLOWS:
1.01 SUMMARY
1.1 SUMMARY
1. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. MAINTAIN PORTABLE FIRE-
A. SECTION INCLUDES SPECIAL PROCEDURES FOR HANDLING HAZARDOUS MATERIALS.
A. SECTION INCLUDES:
SUPPRESSION DEVICES DURING FLAME-CUTTING OPERATIONS.
B. RELATED REQUIREMENTS:
1. DEMOLITION AND REMOVAL OF BUILDINGS.
2. MAINTAIN FIRE WATCH DURING AND AFTER FLAME CUTTING OPERATIONS
1. REQUIREMENTS OF THIS SECTION APPLY TO, AND ARE A COMPONENT PART OF, EACH
2. ABANDONING IN-PLACE AND REMOVING BELOW GRADE CONSTRUCTION
3. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.
3. DISCONNECTING, CAPPING OR SEALING, AND REMOVING SITE UTILITIES
4. LOCATE BUILDING DEMOLITION EQUIPMENT AND REMOVE DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON
1.02 REGULATORY REQUIREMENTS
SUPPORTING WALLS, FLOORS, OR FRAMING.
A. COMPLY WITH APPLICABLE LAWS, CODES AND REGULATIONS WHEN HAZARDOUS MATERIALS ARE
1.2 MATERIALS OWNERSHIP B. SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT BUILDING DEMOLITION AND DEBRIS-REMOVAL OPERATIONS TO ENSURE
DISCOVERED.
A. UNLESS OTHERWISE INDICATED, DEMOLITION WASTE BECOMES PROPERTY OF CONTRACTOR. MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES.
B. HISTORIC ITEMS, RELICS, ANTIQUES, AND SIMILAR OBJECTS INCLUDING, BUT NOT LIMITED TO, CORNERSTONES AND THEIR 1. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, WALKWAYS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT
1.03 RELATED DOCUMENTS
CONTENTS, COMMEMORATIVE PLAQUES AND TABLETS, AND OTHER ITEMS OF INTEREST OR VALUE TO OWNER THAT MAY BE PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR
A. MANNIK & SMITH GROUP'S PHASE I ENVIRONMENTAL SITE ASSESSMENT.
UNCOVERED DURING DEMOLITION REMAIN THE PROPERTY OF OWNER. OBSTRUCTED TRAFFICWAYS IF REQUIRED BY AUTHORITIES HAVING JURISDICTION.
B. MANNIK & SMITH GROUP'S PHASE II ENVIRONMENTAL SITE ASSSESSMENT.
1. CAREFULLY SALVAGE IN A MANNER TO PREVENT DAMAGE AND PROMPTLY RETURN TO OWNER. 2. USE WATER MIST AND OTHER SUITABLE METHODS TO LIMIT SPREAD OF DUST AND DIRT. COMPLY WITH GOVERNING
ENVIRONMENTAL-PROTECTION REGULATIONS.
1.04 REFERENCES
C. EXPLOSIVES: USE OF EXPLOSIVES IS NOT PERMITTED.
A. DEFINITIONS: 1.3 PREINSTALLATION MEETINGS D. PROCEED WITH DEMOLITION OF STRUCTURAL FRAMING MEMBERS SYSTEMATICALLY, FROM HIGHER TO LOWER LEVEL. COMPLETE
1. HAZARDOUS MATERIALS: ANY ITEM OR AGENT (BIOLOGICAL, CHEMICAL, RADIOLOGICAL, A. PREDEMOLITION CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE. BUILDING DEMOLITION OPERATIONS ABOVE EACH FLOOR OR TIER BEFORE DISTURBING SUPPORTING MEMBERS ON THE NEXT
AND/OR PHYSICAL), WHICH HAS THE POTENTIAL TO CAUSE HARM TO HUMANS, ANIMALS, OR LOWER LEVEL.
THE ENVIRONMENT, EITHER BY ITSELF OR THROUGH INTERACTION WITH OTHER FACTORS. 1.4 INFORMATIONAL SUBMITTALS E. REMOVE DEBRIS FROM ELEVATED PORTIONS OF THE BUILDING BY CHUTE, HOIST, OR OTHER DEVICE THAT WILL CONVEY DEBRIS TO
REFER TO REGULATIONS ADMINISTERED BY THE U.S. ENVIRONMENTAL PROTECTION A. ENGINEERING SURVEY: IN THE EVENT THAT CONTRACTOR, DURING COURSE OF DEMOLITION, DISCOVERS A DANGEROUS OR HAZARDOUS GRADE LEVEL IN A CONTROLLED DESCENT.
AGENCY (EPA), THE U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), THE STRUCTURAL CONDITION WHICH WILL BE EXACERBATED TO THE POINT OF UNTIMELY COLLAPSE OR PARTIAL COLLAPSE BY CONTINUATION F. DEMOLISH FOUNDATION WALLS AND OTHER BELOW-GRADE CONSTRUCTION. RETAIN PORTIONS OF FOUNDATION WALLS AS SHOWN
U.S. DEPARTMENT OF TRANSPORTATION (DOT), AND THE U.S. NUCLEAR REGULATORY OF DEMOLITION, CONTRACTOR IS TO HALT DEMOLITION AND INFORM CITY AGENCIES HAVING JURISDICTION AS WELL AS THE ON PLANS.
COMMISSION (NRC). ARCHITECT/ENGINEER. CONTRACTOR WILL BE RESPONSIBLE FOR MONITORING COURSE OF WORK FOR ANY DANGEROUS OR HAZARDOUS 1. REMOVE BELOW-GRADE CONSTRUCTION, INCLUDING BASEMENTS, FOUNDATION WALLS, AND FOOTINGS, COMPLETELY EXCEPT
CONDITION UNFOLDING DURING COURSE OF DEMOLITION.
WHERE INDICATED ON PLANS.
1.05 INFORMATIONAL SUBMITTALS B. PROPOSED PROTECTION MEASURES: SUBMIT REPORT, INCLUDING DRAWINGS, THAT INDICATES THE MEASURES PROPOSED FOR G. EXISTING UTILITIES: DEMOLISH EXISTING UTILITIES AND BELOW-GRADE UTILITY STRUCTURES
A. PREDEMOLITION PHOTOGRAPHS OR VIDEO: SUBMIT BEFORE WORK BEGINS. PROTECTING INDIVIDUALS AND PROPERTY ENVIRONMENTAL PROTECTION, DUST CONTROL AND FOR NOISE CONTROL.
H. BELOW-GRADE AREAS: COMPLETELY FILL BELOW-GRADE AREAS AND VOIDS RESULTING FROM BUILDING DEMOLITION OPERATIONS
INDICATE PROPOSED LOCATIONS AND CONSTRUCTION OF BARRIERS. AS SHOWN ON DETAIL(S)
1.06 CLOSEOUT SUBMITTALS 1. ADJACENT BUILDINGS: DETAIL SPECIAL MEASURES PROPOSED TO PROTECT ADJACENT BUILDINGS TO REMAIN. K. SITE GRADING: UNIFORMLY ROUGH GRADE AREA OF DEMOLISHED CONSTRUCTION TO A SMOOTH SURFACE, FREE FROM
A. LANDFILL RECORDS: INDICATE RECEIPT AND ACCEPTANCE OF HAZARDOUS WASTES BY A C. SCHEDULE OF BUILDING DEMOLITION ACTIVITIES WITH STARTING AND ENDING DATES FOR EACH ACTIVITY. IRREGULAR SURFACE CHANGES. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES.
LANDFILL FACILITY LICENSED TO ACCEPT HAZARDOUS WASTES. D. PREDEMOLITION PHOTOGRAPHS OR VIDEO. L. PROMPTLY REPAIR DAMAGE TO ADJACENT BUILDINGS CAUSED BY DEMOLITION OPERATIONS.
1.07 FIELD CONDITIONS 1.5 CLOSEOUT SUBMITTALS
A. HAZARDOUS MATERIALS: HAZARDOUS MATERIALS ARE PRESENT IN BUILDINGS AND STRUCTURES. A. ENGINEERING REPORTS, IF ANY. 3.6 CLEANING
1. A REPORT ON THE PRESENCE OF HAZARDOUS MATERIALS IS ON FILE FOR REVIEW AND USE. B. RECEIPTS FROM MATERIAL SUPPLIERS (BACKFILL, ETC.) A. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND DISPOSE OF THEM IN A EPA APPROVED CONSTRUCTION AND
EXAMINE REPORT TO BECOME AWARE OF LOCATIONS WHERE HAZARDOUS MATERIALS ARE C. COPIES OF FORMS, REPORTS, ETC. TO EPA AND OTHER AGENCIES AS MANDATED BY GOVERNING AGENCIES AND AUTHORITIES DEMOLITION WASTE LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
KNOWN TO BE PRESENT. HAVING JURSIDICTION. B. DO NOT BURN DEMOLISHED MATERIALS.
2. HAZARDOUS MATERIALS KNOWN TO BE PRESENT WILL BE REMOVED BY OWNER UNDER A C. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED BY BUILDING DEMOLITION OPERATIONS.
SEPARATE CONTRACT BEFORE START OF THE WORK. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE BUILDING DEMOLITION OPERATIONS BEGAN.
3. IF ADDITIONAL SUSPECTED HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB;
IMMEDIATELY NOTIFY ARCHITECT AND OWNER. HAZARDOUS MATERIALS WILL BE REMOVED 1.6 FIELD CONDITIONS END OF SECTION 024116
BY OWNER UNDER A SEPARATE CONTRACT. A. BUILDINGS TO BE DEMOLISHED WILL BE VACATED AND THEIR USE DISCONTINUED BEFORE START OF THE WORK.
A. IN THE CASE OF ASBESTOS, STOP WORK IN THE AREA OF POTENTIAL HAZARD, SHUT B. BUILDINGS IMMEDIATELY ADJACENT TO DEMOLITION AREA WILL BE OCCUPIED. CONDUCT BUILDING DEMOLITION SO OPERATIONS
OFF FANS AND OTHER AIR HANDLERS VENTILATING THE AREA, AND ROPE OFF AREA OF OCCUPIED BUILDINGS WILL NOT BE DISRUPTED.
UNTIL THE QUESTIONABLE MATERIAL IS IDENTIFLED. 1. PROVIDE NOT LESS THAN 72 HOURS' NOTICE OF ACTIVITIES THAT WILL AFFECT OPERATIONS OF ADJACENT
OCCUPIED BUILDINGS.
REASSIGN WORKERS TO CONTINUE WORK IN UNAFFECTED AREAS. RESUME WORK IN
2. MAINTAIN ACCESS TO EXISTING WALKWAYS, EXITS, AND OTHER FACILITIES USED BY OCCUPANTS OF ADJACENT BUILDINGS.
THE AREA OF CONCERN AFTER SAFE WORKING CONDITIONS ARE VERIFIED.
A. DO NOT CLOSE OR OBSTRUCT WALKWAYS, EXITS, OR OTHER FACILITIES USED BY OCCUPANTS OF ADJACENT BUILDINGS
WITHOUT WRITTEN PERMISSION FROM AUTHORITIES HAVING JURISDICTION.
PART 2 - PRODUCTS
C. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSE WILL BE MAINTAINED BY OWNER AS FAR AS PRACTICAL.
1. BEFORE BUILDING DEMOLITION, OWNER WILL REMOVE THE FOLLOWING ITEMS:
2.01 MATERIALS (NOT USED)
D.
PART 3 - EXECUTION E. ON-SITE STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS IS NOT PERMITTED. MONROE COUNTY
F. ARRANGE DEMOLITION SCHEDULE SO AS NOT TO INTERFERE WITH OPERATIONS OF ADJACENT OCCUPIED BUILDINGS.
HAZARDOUS MATERIALS: EXIST ON SITE AND IS TO BE REMEDIATED BY CONTRACTOR UNDER SEPARATE APPLICATION AND PERMIT. LAND BANK
3.01 EXAMINATION
A. VERIFY THAT KNOWN HAZARDOUS MATERIALS HAVE BEEN REMEDIATED BEFORE PROCEEDING
AUTHORITY
WITH WORK.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
3.02 CLEANING
A. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING DEMOLITION.
A. CONTAINERIZE HAZARDOUS WASTE MATERIALS SEPARATELY FROM OTHER WASTE. MARK
COMPLY WITH REGULATIONS OF LOCAL AUTHORITIES, MIOSHA AND NESHAP.
CONTAINERS APPROPRIATELY AND DISPOSE OF LEGALLY, ACCORDING TO REGULATIONS.
COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
B. STANDARDS: COMPLY WITH ANSI/ASSE A10.6 AND NFPA 241.
END OF SECTION 01 35 43.13
2.2 SOIL MATERIALS
A. SATISFACTORY SOILS: COMPLY WITH REQUIREMENTS IN SECTION 312000 "EARTH MOVING."
PART 3 - EXECUTION
3.1 EXAMINATION
A. VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED BEFORE STARTING DEMOLITION OPERATIONS.
B. ENGAGE A PROFESSIONAL ENGINEER TO PERFORM AN ENGINEERING SURVEY OF CONDITION OF BUILDING TO
DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY
PORTION OF STRUCTURE OR ADJACENT STRUCTURES DURING BUILDING DEMOLITION OPERATIONS.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. EXISTING UTILITIES TO BE DISCONNECTED: LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP OFF UTILITIES SERVING BUILDINGS
AND STRUCTURES TO BE DEMOLISHED.
1. ARRANGE TO SHUT OFF UTILITIES WITH UTILITY COMPANIES.
2. IF REMOVAL, RELOCATION, OR ABANDONMENT OF UTILITY SERVICES WILL AFFECT ADJACENT OCCUPIED BUILDINGS, THEN
PROVIDE TEMPORARY UTILITIES THAT BYPASS BUILDINGS AND STRUCTURES TO BE DEMOLISHED AND THAT MAINTAIN
CONTINUITY OF SERVICE TO OTHER BUILDINGS AND STRUCTURES.
3. CUT OFF PIPE OR CONDUIT A MINIMUM OF 24 INCHES BELOW GRADE. CAP, VALVE OR PLUG AND
SEAL REMAINING PORTION OF PIPE OR CONDUIT AFTER BYPASSING ACCORDING TO REQUIREMENTS OF AUTHORITIES HAVING
JURISDICTION.
4. DO NOT START DEMOLITION WORK UNTIL UTILITY DISCONNECTING AND SEALING HAVE BEEN COMPLETED AND VERIFIED IN
WRITING.
3.4 PROTECTION
A. EXISTING FACILITIES: PROTECT ADJACENT WALKWAYS, LOADING DOCKS, BUILDING ENTRIES, AND OTHER BUILDING FACILITIES
DURING DEMOLITION OPERATIONS. MAINTAIN EXITS FROM EXISTING BUILDINGS.
B. TEMPORARY SHORING: PROVIDE AND MAINTAIN INTERIOR AND EXTERIOR SHORING, BRACING, OR STRUCTURAL SUPPORT TO
PRESERVE STABILITY AND PREVENT UNEXPECTED MOVEMENT OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED.
C. EXISTING UTILITIES TO REMAIN: MAINTAIN UTILITY SERVICES TO REMAIN AND PROTECT FROM DAMAGE DURING DEMOLITION
OPERATIONS. DO NOT INTERRUPT EXISTING UTILITIES SERVING ADJACENT OCCUPIED OR OPERATING FACILITIES UNLESS
AUTHORIZED IN WRITING BY OWNER AND AUTHORITIES HAVING JURISDICTION.
D. TEMPORARY PROTECTION: ERECT TEMPORARY PROTECTION, SUCH AS WALKS, FENCES, RAILINGS, CANOPIES, AND COVERED
PASSAGEWAYS, WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION AND AS INDICATED.
1. PROTECT ADJACENT BUILDINGS AND FACILITIES FROM DAMAGE DUE TO DEMOLITION ACTIVITIES.
2. PROTECT EXISTING SITE IMPROVEMENTS, APPURTENANCES, AND LANDSCAPING TO REMAIN.
3. ERECT A PLAINLY VISIBLE FENCE AROUND DRIP LINE OF INDIVIDUAL TREES OR AROUND PERIMETER DRIP LINE OF GROUPS OF
TREES TO REMAIN.
4. PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO
ADJACENT BUILDINGS AND FACILITIES TO REMAIN.
5. PROVIDE PROTECTION TO ENSURE SAFE PASSAGE OF PEOPLE AROUND BUILDING DEMOLITION AREA AND TO AND FROM
OCCUPIED PORTIONS OF ADJACENT BUILDINGS AND STRUCTURES.
6. PROTECT WALLS, WINDOWS, ROOFS, AND OTHER ADJACENT EXTERIOR CONSTRUCTION THAT ARE TO REMAIN AND THAT ARE
EXPOSED TO BUILDING DEMOLITION OPERATIONS.
7.
OCCUPIED PORTIONS OF ADJACENT BUILDINGS.
E. REMOVE TEMPORARY BARRIERS AND PROTECTIONS WHERE HAZARDS NO LONGER EXIST. WHERE OPEN EXCAVATIONS OR OTHER
COHEARZEACRTD AONUDS MCAOINNDTIATIINO NDSU SRTEPMRAOINO,F L PEAARVTEI TTIEOMNPSO ARNADR TYE BMAPRORRIEARRSY AENNDC LPORSOUTREECST ITOON SL IIMNI TP LDAUCSET., NOISE, AND DIRT MIGRATION TO
A-3
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description: Tech Center Renovation - Door Access Readers Department: Dickinson-Iron ISD Buyer: Jessica
State of Michigan
Bid Due: 7/27/2026
Bid Number: ITB - 4666 Bid Title: ITB 4666 - 2026 Sidewalk Improvement
City of Midland
Bid Due: 8/04/2026
Description: 751/26332.MDL; DeTour State Harbor - Fuel Tanks Department: Technology, Management and Budget
State of Michigan