MMW Chiller For Balance of Plant
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 28, 2026 |
| Due Date: | Sep 9, 2026 |
| Solicitation No: | RFQ-2026030648 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Aug 28, 2026 12:22 pm MDT
- Original Published Date: Jul 01, 2026 04:24 pm MDT
- Updated Date Offers Due: Sep 09, 2026 12:00 pm MDT
- Original Date Offers Due: Jul 20, 2026 12:00 pm MDT
- Inactive Policy: Manual
- Updated Inactive Date: Sep 10, 2026
- Original Inactive Date: Jul 21, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 4120 - AIR CONDITIONING EQUIPMENT
-
NAICS Code:
- 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
-
Place of Performance:
Golden , CO 80401USA
8/28/26 Amendment No. 1 extends the due date to 9/9/26 12:00Pm MDT.
7/16/26 Amendment No. 1 posted to address the technical questions received. At this time we do not need to extend the due date.
This procurement is for a single, self-contained, outdoor-rated 20-ton air-cooled industrial process chiller system complete with an integrated glycol pump and glycol buffer tank system.
The primary function of this equipment is to cool and circulate a 50%/50% propylene glycol/water mixture at a set temperature of 35°F (with a flow rate of 60–90 GPM) to condense and dry water out of a hydrogen stream generated by a proton exchange membrane (PEM) electrolyzer. The system must operate under variable loads and survive extreme ambient outdoor conditions at an elevation of 6,000 feet.
- PO BOX 4011 MAILSTOP RSF-041
- Golden , CO 80402
- USA
- Allison Pezzullo
- allison.pezzullo@nlr.gov
- Aug 28, 2026 12:22 pm MDTSolicitation (Updated)
- Aug 28, 2026 12:11 pm MDT Solicitation (Updated)
- Jul 21, 2026 09:55 pm MDT Solicitation (Updated)
- Jul 01, 2026 04:24 pm MDT Solicitation (Original)
Related Document
| Jul 1, 2026 | [Solicitation (Original)] MMW Chiller For Balance of Plant |
| Jul 16, 2026 | [Solicitation (Updated)] MMW Chiller For Balance of Plant |
| Sep 4, 2026 | [Solicitation (Updated)] MMW Chiller For Balance of Plant |
See Also
Follow USAFA Liquid Nitrogen Plant /Generator Active Contract Opportunity Notice ID FA700026Q0111 Related
DEPT OF DEFENSE
Due by 9/15/2026
Removal and Installation of Cambridge M118 Air Unit at Clarifier Building at Persigo
City of Grand Junction
Due by 10/01/2026
General Information Document ID DQ1-GJJA-2027000096-1 Status Open Description DQ 27-004 Cooling Tower Replacement
State Government of Colorado
Due by 9/15/2026