MMW Chiller for Balance of Plant
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Dec 4, 2025 |
| Due Date: | Dec 31, 2025 |
| Solicitation No: | 2026027456 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Dec 04, 2025 01:48 pm MST
- Original Date Offers Due: Dec 31, 2025 04:00 am MST
- Inactive Policy: Manual
- Original Inactive Date: Jan 01, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: 3695 - MISCELLANEOUS SPECIAL INDUSTRY MACHINERY
-
NAICS Code:
- 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
-
Place of Performance:
Golden , COUSA
This chiller is part of the process of creating dry gaseous hydrogen with a proton exchange membrane (PEM) electrolyzer. As part of the PEM process hydrogen is created saturated with water. In order to use this hydrogen in fuel cells and other equipment the hydrogen must be dried. This chiller will provide cooled glycol to condense the water out of the hydrogen stream as the bulk reduction of water step of the process. NREL will be responsible for process piping to connect the chiller(s) to the drying equipment and heat exchanges. This purchase request is for chiller, glycol pump, and glycol buffer tank system with process port connections for glycol.
Attachments/Links:
- Request for Quote (RFQ) 2026027456
- Attachment 1 - Technical Specifications - MMW Chiller for Balance of Plant
- PO BOX 4011 MAILSTOP RSF-041
- Golden , CO 80402
- USA
- Kirby Hoffman
- Kirby.Hoffman@nrel.gov
- Dec 04, 2025 01:48 pm MSTSolicitation (Original)
See Also
Follow Gunnison Double Vault Toilet building-prefabricated Active Contract Opportunity Notice ID 1240LP26Q0180 Related
AGRICULTURE, DEPARTMENT OF
Due by 9/17/2026
General Information Document ID DQ1-CFAA-2027000102-1 Status Open Description Overlaminate Film - Tag Plant
State Government of Colorado
Due by 9/23/2026