MLK Bridge Reconstruction Project

Agency: City of Pontiac
State: Michigan
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Sep 18, 2025
Due Date: Oct 7, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID:

Title: MLK Bridge Reconstruction Project

Addenda: 6

Release Date: 8/22/2025

Due Date: 10/7/2025

Post Information
Posted At:Fri, Aug 22, 2025 2:00 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The City of Pontiac seeks qualified contractors to provide all labor, materials, equipment, and supervision for the reconstruction of Martin Luther King Jr. Boulevard from Woodward Avenue to South Boulevard East, including the full replacement of the bridge over the Grand Trunk Western Railroad (GTWRR). This project encompasses approximately 0.5 miles of roadway and associated infrastructure. Work includes complete pavement and structure removal, installation of new jointed plain concrete pavement, curbs, gutters, sidewalks, storm sewers, drainage structures, noise barrier walls, mechanically stabilized earth walls, bridge superstructure and substructure, lighting, traffic control, and site restoration. All work must be performed in compliance with Michigan Department of Transportation (MDOT) standards, applicable City of Pontiac requirements, and coordination with GTWRR for rail-related activities.

Background

Martin Luther King Jr. Boulevard is a major east–west corridor in the City of Pontiac, serving residential, commercial, and industrial areas and providing critical connectivity to Woodward Avenue and South Boulevard East. The existing roadway consists primarily of five travel lanes, with a landscaped boulevard section near Woodward Avenue and additional turn lanes at South Boulevard. The pavement surface and bridge structure over the GTWRR have reached the end of their service life, exhibiting structural deterioration, safety concerns, and substandard drainage facilities.

Reconstruction is necessary to enhance roadway safety, improve traffic flow, meet current design and accessibility standards, and extend the service life of the corridor. The project includes full-depth pavement replacement, geometric improvements, ADA-compliant sidewalk ramps, upgraded drainage infrastructure, and a modernized bridge structure capable of accommodating projected traffic volumes. This investment supports the City’s long-term infrastructure improvement strategy and will reduce maintenance costs while improving mobility for motorists, pedestrians, and cyclists.

Timeline
Solicitation Posted Date:
August 22, 2025
Question Submission Deadline:
September 22, 2025, 4:00pm
Question Response Deadline:
September 25, 2025, 4:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Construct Readiness Center Active Contract Opportunity Notice ID W912JB-24-B-0001 Related Notice W912JB-23-B-0001

Federal Agency

Bid Due: 1/26/2027

Follow Construct Readiness Center Active Contract Opportunity Notice ID W912JB-24-B-0001 Related Notice W912JB-23-B-0001

Federal Agency

Bid Due: 1/26/2027

Description: BUREAU OF CONSTRUCTION CODES - 9 STICKERS Department: Technology, Management and Budget

State of Michigan

Bid Due: 8/04/2026

BID # BID DOCUMENTS OPEN BID DATE & TIME BID DESCRIPTION Buyer 8903

Washtenaw County

Bid Due: 8/24/2026