Mission Road Underground Utility District Project
| Agency: |
City of South San Francisco |
| State: |
California |
| Type of Government: |
State & Local |
| NAICS Category: |
- 237110 - Water and Sewer Line and Related Structures Construction
- 237310 - Highway, Street, and Bridge Construction
- 237990 - Other Heavy and Civil Engineering Construction
|
| Posted Date: |
Jan 15, 2026 |
| Due Date: |
Feb 3, 2026 |
| Solicitation No: |
ST1904 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Project ID: ST1904
Title: Mission Road Underground Utility District Project
Addenda: 1
Release Date: 12/15/2025
Due Date: 2/3/2026
Mission Road Underground Utility District Project
Invitation for Bids
Public Works/Engineering Division
Project ID: ST1904
Release Date: Monday, December 15, 2025
·
Due Date: Tuesday, February 3, 2026 3:00pm
Posted
Monday, December 15, 2025 4:46pm
All dates & times in Pacific Time
Draft Response Events RSVP No Bid18 days, 21 hours, 50 minutes
Post Information
Posted At:Mon, Dec 15, 2025 4:46 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview
General work description:
The work located along Mission Road, South San Francisco, CA. consists of, but not limited to the following:
-
Relocate overhead utility lines to below ground within Underground Utility District (UUD), including the installation of new utility boxes, vaults, and conduits along and within joint trenches.
-
Install service trenches and coordinate with joint trench participants for tie-in and service conversion.
-
Construct new sidewalk and ADA compliant curb ramps.
-
Install streetlight lighting system.
-
Remove existing inlet, construct new inlets and new storm drain manhole, install reinforced concrete pipe and replace drainage ditch.
-
Remove existing utility poles, restore and relocation of surface features, including pavement, vehicle detector loops, roadway signs, traffic striping, pavement marking, curb, gutter, sidewalks, driveways, fence, landscaping, red curb etcetera.
-
Adjustment of utility cover to new grade.
-
Perform water pollution control work and ensure an approved traffic control system is in place throughout the duration of the Project.
-
Preserve existing survey monuments.
The Engineer’s Estimate for the project is $6.26M.
A detailed scope of work is included in the bid documents.
Timeline
Release Project Date:
December 15, 2025
Pre-Bid Meeting (Non-Mandatory):
January 7, 2026, 10:30am
Prospective bidders should assemble at the southwest corner at Bart and Mission Road intersection, South San Francisco.
Question Submission Deadline:
January 23, 2026, 2:00pm
Question Response Deadline:
January 28, 2026, 5:00pm
Bid Submission Deadline:
February 3, 2026, 3:00pm
Bid Opening Virtual Meeting Information:
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
Follow GAOA Chilao Campground Water System Rehabilitation, Angeles National Forest Active Contract Opportunity
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/06/2026
FY 2026-27 Annual Major Streets Rehabilitation Program: Los Angeles Avenue (First Street to
City of Simi Valley
Bid Due: 7/21/2026
2026 CORRECTIVE/PREVENTATIVE MAINTENANCE ON VARIOUS COUNTY ROADS IN CASPER AREA Department: Transportation RFP
Mendocino County
Bid Due: 7/09/2026
RESD-PMDB JOC 2026-02 - Job Order Contract Coastal RegionDetails Event ID 0000039431 Format/Type:
State Government of California
Bid Due: 7/08/2026