Mission Creek Greenway Slide Toe Protection at East Kelowna Road
| Agency: | Government of Canada |
|---|---|
| State: | Federal |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 25, 2025 |
| Due Date: | Jul 17, 2025 |
| Solicitation No: | BCR25-135 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Description
Streambank protection measures are required to stabilize the bank and prevent further erosion that could jeopardize the structural integrity of the slope and the adjacent trail. This RFP is issued to select a Contractor to perform that work. All works must be conducted in compliance with applicable environmental regulations, the Environmental Management Plan (EMP), and recognized Best Management Practices (BMPs) for works in and around water.
Work Summary: The Work can be briefly summarized as:Environmental protection measures, including but not limited to, sediment and erosion control, fish and wildlife protection, and vegetation preservation/restoration as specified; Construction of temporary worksite isolation measures. Includes the construction of a diversion/bypass channel, supply and installation of flow diversion measures and dewatering as required. Streambank stabilization works, includes the placement of riprap armouring, chocking gravel and root wads and along the eroded bank section. Site reinstatement; includes restoration of the protected bank and riparian bench through planting of native vegetation using a combination of live staking, container planting, and hydroseeding to enhance riparian cover and habitat.Full details of the Work required is provided in Part A of this RFP, including the referenced Contract Drawings.
Place of the Work: the work is located along the Mission Creek Greenway at the Hollywood Road South Parking Area and Trailhead (2080 Hollywood Road South, Kelowna, BC). Access to the site, is via a non-public access located at 3945 East Kelowna Road. Access to the site is through a private property on the opposite side of the creek. Care will need to be taken to ensure no damage is caused to the private property, any disturbance due to construction and use of access will be required to be remediated. Coordination of access with the property owner will be required. Minor access trail (route) rehabilitation works will be required upon project completion, as described in the scope of Work.
Contract Time: The following are key milestone dates required for the Work:
For more information on this RFP and how to download the bid documents, ask questions and submit a proposal, please visit the RDCO's Purchasing Agent's electronic bidding platform:
https://rdco.bidsandtenders.ca/Module/Tenders/en
The estimated contract period will be 3 month(s).
-
Please refer to tender description or tender documents
Are you interested in partnering with other businesses for this opportunity? Add your company to the list of businesses who are interested in partnering .
This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria. For more information please read the Terms of use .
See Also
Description Request for Expressions of Interest for Contractor Prequalification. Interested Suppliers are invited
Government of Canada
Due by 1/26/2028
Description Interested Suppliers are invited to submit a Response to this MULRFQ for
Government of Canada
Due by 4/15/2028
Description Notice of Opportunity NOO No. 64075 Burke Mountain Community Centre Construction The
Government of Canada
Due by 3/31/2027
Description Please note that late submissions will not be considered or accepted. A
Government of Canada
Due by 9/30/2026