MILLING AND RESURFACING
| Agency: | Division of Highways |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 31, 2026 |
| Due Date: | Sep 8, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
DD00532 2027CPT.04.11.10641, 2027CPT.04.11.20641
POC
MILLING AND RESURFACING
Attachment Preview
JOSH STEIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DANIEL H. JOHNSON
SECRETARY
August 31, 2026
Addendum No. 1
RE:
DD00532
Nash County
To Whom It May Concern:
Reference is made to the above-mentioned project. The following changes have been made:
1. The full description for the Hot Spray and IMP pavement markings was not listed on
the Proposal Item Sheets, only on the Summary of Quantities. Please replace Page 1
and 2 of Proposal Item Sheets in the proposal with the attached sheets.
2. Due to incorrect roadway widths on Maps 2 and 3, the Summary of Quantities for 1-
1/2” milling, Incidental Milling, Asphalt Type S9.5C, Binder for Plant Mix, and 4”
Paint Pavement Marking Lines quantities were increased. Please replace Pages 1 and
2 of both the Summary of Quantities and Proposal Item Sheets with attached sheets.
This sheet and attachments shall be made a part of the plans and bid documents and shall
be submitted with the bid. Bids submitted without the addenda and attachments will be
considered non-responsive.
If there are any questions, please contact me at (252) 640-6433.
Sincerely,
08/31/2026
Vickie P. Gardner
Division Four Contract Engineer
VPG/
Attachments
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION FOUR OFFICE
POST OFFICE BOX 3165
WILSON, NC 27895
Telephone: (252) 640-6400
Fax: (252) 234-6174
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
509 WARD BOULEVARD
WILSON, NC 27895
Aug 31, 2026 2:54 PM
County: NASH
Line
#
Item Number
0001 0000100000-N
0002 1220000000-E
0003 1297000000-E
0004 1330000000-E
0005 1519000000-E
0006 1523000000-E
0007 1575000000-E
0008 1704000000-E
0009 2815000000-N
0010 2830000000-N
0011 2845000000-N
0012 4413000000-E
0013 4422000000-N
0014 4457000000-N
0015 4685000000-E
0016 4688000000-E
0017 4695000000-E
ITEMIZED PROPOSAL FOR CONTRACT NO. DD00532
Sec Description
#
ROADWAY ITEMS
800 MOBILIZATION
545 INCIDENTAL STONE BASE
607 MILLING ASPHALT PAVEMENT, ***"
DEPTH
1-1/2"
607 INCIDENTAL MILLING
610 ASPHALT CONC SURFACE COURSE,
TYPE S9.5B
610 ASPHALT CONC SURFACE COURSE,
TYPE S9.5C
620 ASPHALT BINDER FOR PLANT MIX
SP PATCHING EXISTING PAVEMENT
858 ADJUSTMENT OF DROP INLETS
858 ADJUSTMENT OF MANHOLES
858 ADJUSTMENT OF METER BOXES OR
VALVE BOXES
SP WORK ZONE ADVANCE/GENERAL
WARNING SIGNING
1120 PORTABLE CHANGEABLE MESSAGE
SIGN (SHORT TERM)
SP TEMPORARY TRAFFIC CONTROL
1205 THERMOPLASTIC PAVEMENT
MARKING LINES (4", 90 MILS)
1205 THERMOPLASTIC PAVEMENT
MARKING LINES (6", 90 MILS)
1205 THERMOPLASTIC PAVEMENT
MARKING LINES (8", 90 MILS)
Quantity Unit Cost
Lump Sum
L.S.
114
TON
80,114
SY
6,710
SY
16,022
TON
6,944
TON
1,500
TON
1,030
TON
1
EA
19
EA
29
EA
2,044
SF
54
DAY
Lump Sum
L.S.
93,075
LF
186,387
LF
1,850
LF
Page 1 of 2
Amount
Aug 31, 2026 2:54 PM
County: NASH
Line
#
0018
Item Number
4704000000-E
0019 4709000000-E
0020 4720000000-E
0021 4725000000-E
0022 4810000000-E
0023 4890000000-E
0024 4890000000-E
0025 4890000000-E
ITEMIZED PROPOSAL FOR CONTRACT NO. DD00532
Sec Description
#
1205 THERMOPLASTIC PAVEMENT
MARKING LINES (16", 90 MILS)
1205 THERMOPLASTIC PAVEMENT
MARKING LINES (24", 90 MILS)
1205 THERMOPLASTIC PAVEMENT
MARKING CHARACTER (90 MILS)
1205 THERMOPLASTIC PAVEMENT
MARKING SYMBOL (90 MILS)
1205 PAINT PAVEMENT MARKING LINES (4")
SP GENERIC PAVEMENT MARKING ITEM
4" INTEGRATED MULTIPOLYMER (IMP)
PAVEMENT MARKING (4", 90 MILS)
SP GENERIC PAVEMENT MARKING ITEM
6" INTEGRATED MULTIPOLYMER (IMP)
PAVEMENT MARKING (6", 90 MILS)
SP GENERIC PAVEMENT MARKING ITEM
HOT SPRAY THERMOPLASTIC
PAVEMENT MARKING LINES (4", 60
MILS)
Quantity Unit Cost
200
LF
700
LF
8
EA
61
EA
416,811
LF
2,250
LF
3,200
LF
137,349
LF
1454/Aug31/Q956474/D84356100000/E25
Total Amount Of Bid For Entire Project :
Page 2 of 2
Amount
PROJECT NO COUNTY MAP NO
ROUTE
2027CPT.04.11.10641 Nash
1
TOTAL FOR MAP NO. 1
US-64 ALT
2027CPT.04.11.10641 Nash
2
NC-97 / RALEIGH ROAD
TOTAL FOR MAP NO. 2
TOTAL FOR PROJ NO. 2026CPT.04.31.10641
DESCRIPTION
SUMMARY OF QUANTITIES
TYP NO LANES LANE LENGTH WIDTH BEGIN END
TYPE
MP MP
MI
FT
1220000000-E
INCIDENTAL
STONE BASE
TONS
1297000000-E
1½" MILLING
SY
1330000000-E
INCIDENTAL
MILLING
SY
1519000000-E 1523000000-E
SURFACE
SURFACE
COURSE, S9.5B COURSE, S9.5C
TONS
TONS
1575000000-E
ASPHALT
BINDER FOR
PLANT MIX
TONS
PROJECT NO.
2027CPT.04.11.10641
2027CPT.04.11.20641
1704000000-E
PATCHING
EXISTING
PAVEMENT
TONS
2815000000-N
ADJ. OF DROP
INLET
EA
SHEET NO.
1
2830000000-N
ADJ. OF
MANHOLES
EA
TOTAL NO.
2
2845000000-N
ADJ. OF METER
OR VALVE BOX
EA
FROM WEST SPRING HOPE TOWN
LIMITS TO EAST SPRING TOWN LIMITS 1 & 2 2 MU 2.180 26 2.890 5.070
16
2.180
16
FROM NASHVILLE ROAD TO US
HIGHWAY 301 BUSINESS
1 & 2 2 MU 1.200 36 28.100 29.300
1.200
3.380
16
35,052
35,052
25,344
25,344
60,396
1,550
1,550
250
250
1,800
3,091
188
110
1
3,091
188
110
1
2,142
129
60
2,142
129
60
5,233
317
170
1
7
15
7
15
7
4
7
4
14
19
FROM US HIGHWAY 64 ALT / NC 581
2027CPT.04.11.20641 Nash
3
SR-1144 / N PINE ST
TO SR 1145 OLD SPRING HOPE ROAD 1 & 3 2 2WU 1.140 24 0.000 1.140
19,718
550
1,711
104
80
TOTAL FOR MAP NO. 3
1.140
19,718
550
1,711
104
80
FROM NC HIGHWAY 43 TO SR 1601
2027CPT.04.11.20641 Nash
4 SR-1603 / N OLD CARRIAGE RD
REGES STORE ROAD
3
2 2WU 3.019 22 0.181 3.200
20
685
3,426
230
160
TOTAL FOR MAP NO. 4
3.019
20
685
3,426
230
160
FROM SR 1717 WEST MOUNT DRIVE
2027CPT.04.11.20641 Nash
5 SR-1603 / N OLD CARRIAGE RD
TO NC HIGHWAY 97
3
2 2WU 4.143 22 9.580 13.723
26
1,145
4,520
304
210
TOTAL FOR MAP NO. 5
4.143
26
1,145
4,520
304
210
FROM SR 1003 RED OAK ROAD TO NC
HIGHWAY 58 / US HIGHWAY 64
2027CPT.04.11.20641 Nash
6
SR-1670 / FIRST STREET EXT
BUSINESS
3
2
1.760 20 0.400 2.160
10
1,565
1,766
119
90
TOTAL FOR MAP NO. 6
1.760
10
1,565
1,766
119
90
FROM SR-1306 OLD FRANKLIN ROAD
TO US HIGHWAY 64 ALT / W
2027CPT.04.11.20641 Nash
7 SR-1900 / OLD WHITE OAK RD
WASHINGTON ST
3
2
4.930 20 2.980 7.910
26
610
4,882
329
250
TOTAL FOR MAP NO. 7
4.930
26
610
4,882
329
250
FROM SR-1161 BART ROAD TO
2027CPT.04.11.20641 Nash
8
SR-1155 / BURGESS RD
FRANKLIN COUNTY LINE
4
2 2WU 1.370 20 2.940 4.310
10
305
1,127
77
70
TOTAL FOR MAP NO. 8
1.370
10
305
1,127
77
70
FROM SR 1155 BURGRESS ROAD TO
2027CPT.04.11.20641 Nash
9
SR-1154 / SANDERS RD
FRANKLINE COUNTY LINE
4
2 2WU 0.370 20 0.000 0.370
6
50
301
20
TOTAL FOR MAP NO. 9
0.370
6
50
301
20
TOTAL FOR PROJ NO. 2026CPT.04.31.20641
16.732
98
19,718
4,910
16,022
1,711
1,183
860
GRAND TOTAL
20.112
114
80,114
6,710
16,022
6,944
1,500
1,030
1
5
10
5
10
5
10
19
29
PROJECT NO COUNTY MAP NO
ROUTE
2027CPT.04.11.10641 Nash
1
TOTAL FOR MAP NO. 1
US-64 ALT
2027CPT.04.11.10641 Nash
2
NC-97 / RALEIGH ROAD
TOTAL FOR MAP NO. 2
TOTAL FOR PROJ NO. 2026CPT.04.31.10641
DESCRIPTION
THERMOPLASTIC AND PAINT QUANTITIES
4413000000-E 4422000000-N 4457000000-N
TYP NO LANES LANE LENGTH WIDTH BEGIN MP END MP WORK ZONE PORTABLE TEMPORARY
TYPE
ADVANCE/GE CHANGEABLE TRAFFIC
NERAL
MESSAGE CONTROL
WARNING SIGN (SHORT
SIGNING
TERM)
4685000000-E
4" X 90 M
4" X 90 M
WHITE
YELLOW
THERMO
THERMO
4688000000-E
6" X 90 M
6" X 90 M
WHITE
YELLOW
THERMO
THERMO
4695000000-E
8" X 90 M
8" X 90 M
WHITE
YELLOW
THERMO
THERMO
4704000000-E 4709000000-E 4720000000-E
THERMO RXR
THERMOPLAS THERMOPLAS
90 M
TIC PAVEMENT TIC PAVEMENT
MARKING MARKING
LINES (16", 90 LINES (24", 90
MILS)
MILS)
THERMO LT
ARROW 90
M
THERMO STR
ARROW 90 M
4725000000-E
THERMO STR THERMO RT
& RT ARROW ARROW 90 M
90 M
THERMO STR
& LT ARROW
90 M
PROJECT NO.
2027CPT.04.11.10641
2027CPT.04.11.20641
SHEET NO.
2
TOTAL NO.
2
4810000000-E
4" WHITE 4" YELLOW
PAINT
PAINT
4890000000-E
INTEGRATED INTEGRATED INTEGRATED INTEGRATED
MULTIPOLYME MULTIPOLYME MULTIPOLYME MULTIPOLYME THERMOPLAS THERMOPLAS
R PAVEMENT R PAVEMENT R PAVEMENT R PAVEMENT TIC PAVEMENT TIC PAVEMENT
MARKING MARKING MARKING MARKING MARKING MARKING
LINES (4", 90 LINES (4", 90 LINES (6", 90 LINES (6", 90 LINES - 4"X60 LINES - 4"X60
MILS) WHITE MILS) YELLOW MILS) WHITE MILS) YELLOW MILS HOT MILS HOT
SPRAY -
SPRAY -
WHITE
YELLOW
MI
FT
SF
DAY
LS
LF
LF
LF
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
LF
LF
LF
LF
LF
LF
LF
LF
FROM WEST SPRING HOPE TOWN
LIMITS TO EAST SPRING TOWN LIMITS 1 & 2 2 MU 2.18 26 2.89 5.07
248
8
0.13
23,021
21,870
2.18
248
8
0.13
23,021
21,870
FROM NASHVILLE ROAD TO US
HIGHWAY 301 BUSINESS
1 & 2 2 MU 1.2 36 28.1 29.3
136
6
0.09
12,672
12,038
1.2
136
6
0.09
12,672
12,038
3.38
384
14
0.22
35,693
33,908
69,601
750
750
100
200
4
7
4
750
750
100
200
4
7
4
300
14
16
10
4
300
14
16
10
4
750
750
100
500
4
21
20
10
4
1,500
57
23,021
23,021
21,870
21,870
2
12,672
12,038
2
12,672
12,038
2
35,693
33,908
69,601
FROM US HIGHWAY 64 ALT / NC 581
2027CPT.04.11.20641 Nash
3
SR-1144 / N PINE ST
TO SR 1145 OLD SPRING HOPE ROAD 1 & 2 2 2WU 1.14 24
0
1.14
128
6
0.06
12,038
11,436
150
100
200
4
TOTAL FOR MAP NO. 3
1.14
128
6
0.06
12,038
11,436
150
100
200
4
FROM NC HIGHWAY 43 TO SR 1601
2027CPT.04.11.20641 Nash
4 SR-1603 / N OLD CARRIAGE RD
REGES STORE ROAD
3
2 2WU 3.019 22 0.181 3.2
352
6
0.16
32,937
31,290
TOTAL FOR MAP NO. 4
3.019
352
6
0.16
32,937
31,290
FROM SR 1717 WEST MOUNT DRIVE
2027CPT.04.11.20641 Nash
5 SR-1603 / N OLD CARRIAGE RD
TO NC HIGHWAY 97
3
2 2WU 4.143 22 9.58 13.723
224
8
0.21
44,035
41,883
TOTAL FOR MAP NO. 5
4.143
224
8
0.21
44,035
41,883
FROM SR 1003 RED OAK ROAD TO NC
HIGHWAY 58 / US HIGHWAY 64
2027CPT.04.11.20641 Nash
6
SR-1670 / FIRST STREET EXT
BUSINESS
3
2
1.76 20
0.4
2.16
200
4
0.08
18,586
17,656
2
2
TOTAL FOR MAP NO. 6
1.76
200
4
0.08
18,586
17,656
2
2
FROM SR-1306 OLD FRANKLIN ROAD
TO US HIGHWAY 64 ALT / W
2027CPT.04.11.20641 Nash
7 SR-1900 / OLD WHITE OAK RD
WASHINGTON ST
3
2
4.93 20 2.98 7.91
556
12
0.21
200
TOTAL FOR MAP NO. 7
4.93
556
12
0.21
200
FROM SR-1161 BART ROAD TO
2027CPT.04.11.20641 Nash
8
SR-1155 / BURGESS RD
FRANKLIN COUNTY LINE
4
2 2WU 1.37 20 2.94 4.31
156
2
0.05
TOTAL FOR MAP NO. 8
1.37
156
2
0.05
FROM SR 1155 BURGRESS ROAD TO
2027CPT.04.11.20641 Nash
9
SR-1154 / SANDERS RD
FRANKLINE COUNTY LINE
4
2 2WU 0.37 20
0
0.37
44
2
0.01
TOTAL FOR MAP NO. 9
0.37
44
2
0.010
TOTAL FOR PROJ NO. 2026CPT.04.31.20641
16.732
1,660
40
0.780
12,038
11,436
95,558
90,829
150
200
100
200
4
2
2
23,474
186,387
350
4
GRAND TOTAL
20.112
2,044
54
1.000
47,731
45,344
95,558
90,829
900
950
200
700
8
23
20
12
4
93,075
186,387
1,850
61
12,038
11,436
750
12,038
11,436
750
1,000
1,000
32,937
32,937
31,290
31,290
44,035
44,035
41,883
41,883
800
800
800
800
18,586
18,586
17,656
17,656
800
800
800
800
52,061
49,458
250
250
52,061
49,458
250
250
52,061
52,061
49,458
49,458
14,467
14,467
13,744
13,744
14,467
14,467
13,744
13,744
3,907
3,712
3,907
3,712
178,031
169,179
347,210
1,000
1,250
1,600
1,600
142,799
3,907
3,907
70,435
3,712
3,712
66,914
2
213,724
203,087
1,000
1,250
1,600
1,600
70,435
66,914
416,811
142,799
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
DD00541 2027CPT.04.21.10331, 2027CPT.04.21.20331 POC MILLING AND RESURFACING DD00541 Edgecombe Proposal.pdf Doc. Type: Proposals
Division of Highways
Due by 9/22/2026
DD00530 2027CPT.04.12.10331, 2027CPT.04.12.20331 POC MILLING AND RESURFACING DD00530_Addendum_1.pdf Doc. Type: Addendum Description: MILLING
Division of Highways
Due by 9/22/2026
DB00631 POC MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64
Division of Highways
Due by 10/14/2026
DD00530 2027CPT.04.12.10331, 2027CPT.04.12.20331 POC MILLING AND RESURFACING DD00530 Edgecombe Resurface Proposal 9-22.pdf Doc.
Division of Highways
Due by 9/22/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.