Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Jun 09, 2026 12:08 pm EDT
- Original Response Date:
- Inactive Policy: Manual
- Original Inactive Date: Jun 24, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Midwest City , OKUSA
Pre-solicitation Notice
For
MIDWEST CITY WATER TOWER
Midwest City, Oklahoma County, Oklahoma
This is a PRE-SOLICITATION NOTICE for the construction of a Water Tower and associated infrastructure for Midwest City, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.
The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to construct a new water tower for Midwest City, Oklahoma. The proposed design-bid-build project will be procured as an unrestricted, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.
Project Description:
Midwest City (MWC)is developing a high-pressure zone to improve the low pressures within the southeastern portion of the water distribution system (WDS) and proposed improvements that include the following, and incidental related work:
- Construction of a new 500,000-gallon elevated storage tank (EST), including associated piping, electrical, controls, and site improvements.
- Construction of a new high service pump station (HSPS), including associated piping, electrical, controls, and site improvements. Work includes shoring and dewatering practices as required, and as indicated in the Contract Documents.
- Construction of approximately 650 linear feet of new 12-inch ductile iron pipe from the new EST access road to the existing pipe connection on Timber Ridge Blvd. Work includes all pipe fittings, valves, restraints, traffic control, and site repairs.
- Work to complete the piping reconfiguration at the existing Titan Tower Tank site, including approximately 100 linear feet of 18-inch ductile iron pipe, 80 linear feet of 16-inch ductile iron pipe, pipe appurtenances, and pipe reconnections.
- Reconfiguration of distribution system piping at the corner of 15th Street and Westminster Road, including a new connection from the 24-inch water main on the west side of Westminster Road to the 12-inch water main on the north side of 15th Street.
- All erosion and sediment control devices, device maintenance, construction stormwater permitting, and stormwater management throughout construction.
- Close required isolation valves to isolate the Timber Ridge Zone while coordinating the valve work with the Owner.
The estimated magnitude of construction for this project is between $10,000,000 and $25,000,000.
The North American Industry Classification System code for this procurement 237110 (Water and Sewer Line and Related Structures Construction) which has a small business size standard of $45M.
The Product Service Code is: Y1NE (Construction of Water Supply Facilities)
Estimated duration of construction of this project is 450 calendar days.
Anticipated solicitation issuance date is on or about 23 June 2026, and the estimated proposal due date will be on or about 23 July 2026.
- KO CONTRACTING DIVISION 2488 E 81ST STREET
- TULSA , OK 74137-4290
- USA
- Tyler Godwin
- tyler.l.godwin@usace.army.mil
- Phone Number 9186697281
- Dario Rissone
- Dario.M.Rissone@usace.army.mil
- Phone Number 9186697109
- Jun 09, 2026 12:08 pm EDTPresolicitation (Original)
- Mar 04, 2026 12:04 am EST Sources Sought (Original)
Related Document
| Jul 7, 2026 | [Solicitation (Updated)] Midwest City Water Tower |
| Jul 23, 2026 | [Solicitation (Updated)] Midwest City Water Tower |
| Jul 29, 2026 | [Solicitation (Updated)] Midwest City Water Tower |
| Aug 7, 2026 | [Solicitation (Updated)] Midwest City Water Tower |
See Also
Post Date 09/21/2026 Quest Number 10382811 Category Code 659 - Pipe And Tubing
City of Broken Arrow
Due by 10/14/2026
Follow F16_AN_APG68_ElectronTube_5960011538780_PN_585R224H01_3 Active Contract Opportunity Notice ID F16_AN_APG68_ElectronTube_5960011538780_PN_585R224H01_3 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 8/12/2027
Follow F16_ElectronTube_AN_APG86_5960014448163_PN_588R901h02 Active Contract Opportunity Notice ID F16_ElectronTube_AN_APG86_5960014448163_PN_588R901h02 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 8/12/2027
Follow 15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK Active Contract
DEPT OF DEFENSE