| Agency: | UCLA Capital Programs |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 7, 2025 |
| Due Date: | May 21, 2025 |
| Solicitation No: | 908736.01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Project Name | Mid-Wilshire Medical Office Building Seismic Improvements - Phase 2B (BP03A - Concrete) PREQUALIFICATION |
| Project Number | 908736.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents are sought from prospective Concrete subcontractors (hereafter “subcontractors”) for the following project:
Overall Description: The 5 story Medical Office Building (MOB) is located at 5901 West Olympic Boulevard, approximately 6 miles east of the UCLA Campus and is approximately 95,607 GSF. The proposed project would include seismic improvements on all floor levels and interior tenant improvements of approximately 34,000 GSF of space on floors 1-3. The MOB has a current Seismic Performance Rating of V. Upon completion of the work, the MOB would achieve a Seismic Performance Rating of IV or better and bring the facility into compliance with the UC Seismic Safety Policy. The proposed seismic work will include the installation of approximately 34 seismic dampers placed at specified locations on the inside perimeter of the building's exterior walls. The dampers will be installed diagonally and attached at the bottom and top of the existing steel column bays requiring incidental fireproofing at beam and column modifications. Steel reinforcing plates will be added to existing steel beams and columns to support the installation of seismic damper brackets. Additional seismic reinforcing is required at the existing rooftop mechanical penthouse and at the building foundation at locations along the 1st floor seismic dampers. In addition to the seismic work, work would also include partial restoration of interior building finishes impacted by the installation of the seismic braces. Limited MEP investigation and safe-off work is anticipated. Site and building accessibility improvements would include path of travel upgrades along the city sidewalk and building entrance, installation of new ADA handrails and guardrails at existing interior stairs. New accessible signage, restrooms and a drinking fountain are also anticipated. Bid Package 03A: Concrete: The anticipated concrete scope includes concrete infill of existing slab on grade where concrete was removed to facilitate new underground utilities. The successful bidder’s subcontract will be with Swinerton Builders, Inc., the CM/Contractor on this project. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $100,000.00 |
| 908736.01 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
146222 - 146222 KIT, HYDRANT GUARD Status Stage Open Posted 6/11/2026 Bid Due
City of Los Angeles
Bid Due: 6/25/2026
Follow Y1JZ--Roof Repairs At PAD 36C261-26-AP-2499 | 640-26-2-5241-0017 | 640-26-114 | (VA-26-00042084) Active
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/01/2026
Project ID: 2026-RFP-0123 Title: Design-Build Services for a Hydrogen Fueling Station Addenda: 4
City of Pasadena
Bid Due: 6/18/2026
New Project for Bidding - Wastewater Shop Space Optimization Project Department: Public Works
City of Glendale
Bid Due: 6/17/2026