Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3
| Agency: | Clay County Utility Authority |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 13, 2026 |
| Due Date: | Oct 9, 2026 |
| Solicitation No: | ITB No. 2025/2026-A12 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: ITB No. 2025/2026-A12
Title: Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3
Addenda: 0
Release Date: 9/11/2026
Due Date: 10/9/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
CCUA requests sealed bids from qualified Bidders for Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3 .
The Selected CONTRACTOR shall furnish and construct, unless otherwise noted, all necessary permits, labor, equipment, and materials to complete the Mid-Clay WRF GST No. 3 Project. Mid-Clay WRF is located at 2926 Jubilee Lane, approximately 0.2 miles North of Sandridge Boulevard, in Middleburg, FL. The work shall consist of the following, but not limited to, the Work identified in the Solicitation Documents.
-
-
- Mobilization/Demobilization, General Requirements, and Bonds and Insurance.
- Environmental Protection.
- Placing compacted fill located on site for preparation for the GST foundation in accordance with the Contract Documents.
- Construction of a 750,000-gallon capacity prestressed concrete ground-level reclaimed water storage tank and associated yard piping.
- Site restoration.
- Conduct all necessary testing and start-up.
- Prepare Record Drawings.
-
A detailed summary of Work is provided in the bid documents and drawings. CONTRACTOR is responsible for protecting existing materials, structures, and equipment on-site during construction activities.
All materials, methods of construction, and standards must be in accordance with the CCUA’s approved material manual, specs, and details.
CCUA will evaluate the bids, and the award will be made to the lowest responsive and responsible bidder selected by CCUA.
Background
The Florida Legislature created the Clay County Utility Authority (CCUA) as an independent special district by Chapter 94-491, Laws of Florida, Special Acts of 1994. A seven (7) member Board of Supervisors governs the utility. CCUA currently serves more than 50,000 customers in Clay County, Florida. CCUA management forecasts the population in Clay County will likely double by 2042. CCUA operates and maintains twenty-two (22) water treatment plants, seven (7) water reclamation facilities, and nine (9) reclaimed storage and pumping facilities, and over 200 pump stations in Clay County, Florida, and adjacent counties.
- Mission: Develop an environmentally and economically sustainable utility that is focused on protecting the public health, safety, and general welfare by providing clean and safe potable water, wastewater, and reclaimed water services through conservation of natural resources, diversification of the water supply portfolio, and recruitment and development of a highly trained professional staff prepared for tomorrow’s challenges.
- Vision: Provide long-term sustainable value to our current and future customers by conserving and protecting natural resources while providing clean, safe, and economical water, wastewater, and reclaimed water services.
- Tax Exemption: CCUA is exempt from Federal excise and State sales taxes. The tax exemption number is 85-8012536416C-5.
Timeline
Board of Supervisors Room (Boardroom)
3176 Old Jennings Road
Middleburg, Florida 32068-3907
https://us04web.zoom.us/j/73132961226?pwd=SIGvtrGPgkJcdQcCX3mphk1LXyA5ux.1
Meeting chat link
https://us04web.zoom.us/launch/jc/73132961226
Meeting ID: 731 3296 1226
Passcode: 8mKvkv
SUBMISSION OF BID SECURITY AT
Attention: CCUA Procurement Manager
3176 Old Jennings Road
Middleburg, Florida 32068
See Also
Advertisement Detail Department of Transportation Informational Notice TREASURE COAST OPERATIONS FUEL CANOPY REHABILITATION
State Government of Florida
Due by 11/12/2040
Advertisement Detail Department of Transportation Single Source Roof Preventative Maintenance Advertisement Number: SSC-DOT-09/10-7006SD
State Government of Florida
Due by 9/10/2070
Project: Transit Shelters and Amenities (FTA) Ref. #: TRN2133001B1 Department: FASD - Purchasing
Broward County
Due by 11/10/2026
Main Agency City of Cocoa Status Active Fiscal Year 2027 Primary Contact Rachel
City of Cocoa
Due by 11/23/2026